Daily Market Update
Trading Day: 10 March 2018, Saturday Ref# DMU_20180310-069
VISAYAS TO LUZON
16000 AVAILABLE SUPPLY 400
GENERATION OFFER LUZON TO VISAYAS
14000 DEMAND
300
12000
200
MEGAWATT
MEGAWATT
10000
8000 100
6000
0
4000
-100
2000
0 -200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF THE GENERATION OFFERS, AVAILABLE SUPPLY, AND REQUIREMENT (ENERGY AND RESERVE) AT EX-ANTE SCHEDULED HVDC FLOW AT EX-ANTE, WHICH CAN EITHER BE FROM THE VISAYAS TO LUZON OR FROM LUZON TO THE VISAYAS.
NOTE: RESERVES (OFFERS AND REQUIREMENT) IN THE LUZON GRID ARE ONLY REFLECTED IN THE ILLUSTRATION ABOVE ZERO INDICATES NO POWER FLOW BETWEEN THE LUZON AND VISAYAS GRIDS.
2500
MEGAWATT
NAT GAS
2000 28.2%
1500
1000
500
0 COAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 46.7%
CAPACITY ON OUTAGE (IN MW) BY RESOURCE TYPE DURING THE TRADING DAY DAILY GENERATION MIX BY RESOURCE TYPE (IN %) BASED ON THE SCHEDULED GENERATION DURING THE TRADING DAY
WEATHER INFORMATION
SUPPLY AND EX-ANTE SCHEDULES (ENERGY AND RESERVE, LUZON) REGULATION (RAISE/LOWER) REQUIREMENT AND OFFERS (LUZON)
10000 160
MEGAWATT
MEGAWATT
140
9000 120
100
8000
80
7000 60
40
6000
20
5000 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF THE GENERATION OFFERS, AVAILABLE SUPPLY, AND SCHEDULES (ENERGY AND RESERVE) AT EX-ANTE HOURLY TREND OF THE REGULATION RESERVE REQUIREMENT AND OFFERS. THE VALUES REFLECTED HERE ARE FOR REGULATION
PLEASE NOTE THAT A COMPONENT OF THE REGULATION RESERVE IS ALREADY INCLUDED IN THE ENERGY SCHEDULE RAISE (UPWARD DISPATCH) AND LOWER (DOWNWARD DISPATCH). i.e. A REGULATION REQUIREMENT OF 100 MW MEANS THERE IS
FOR LOWER REGULATION A NEED FOR 100 MW UPWARD AND A 100 MW DOWNWARD DISPATCH. THE SAME APPLIES FOR THE OFFERS AND SCHEDULES.
CONTINGENCY REQUIREMENT AND OFFERS (LUZON) DISPATCHABLE REQUIREMENT AND OFFERS (LUZON)
600 600
MEGAWATT
MEGAWATT
500 500
400 400
300 300
200 200
100 100
0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF THE CONTINGENCY RESERVE REQUIREMENT AND OFFERS HOURLY TREND OF THE DISPATCHABLE RESERVE REQUIREMENT AND OFFERS
Daily Market Update
Trading Day: 10 March 2018, Saturday Ref# DMU_20180310-069
PRICING CONDITIONS
PEN SUMMARY REASONS FOR PRICING ERRORS
EX-ANTE EX-POST
EX-ANTE EX-POST
LUZON VISAYAS LUZON VISAYAS
HOUR HOUR
CONDITION PRICES USED CONDITION PRICES USED CONDITION PRICES USED CONDITION PRICES USED V U O B C DE NR PSM V U O B C DE NR PSM
HOURLY PRICING RESULTS FOR BOTH THE EX-ANTE AND EX-POST MARKET RUNS. IT MUST BE NOTED, HOWEVER, SUMMARY OF THE REASONS BEHIND THE ISSUANCE OF PRICING ERROR NOTICES FOR EACH TRADING INTERVAL
THAT THE PRICING CONDITIONS INDICATED IN THIS TABLE ARE NOT YET FINAL.
MARKET PRICES (SYSTEM, EX-ANTE) LOAD WEIGHTED AVERAGE PRICE (SYSTEM AND REGIONAL, EX-ANTE)
SYSTEM LWAP
MAX NODAL PRICE
12000 12000 12000
MIN NODAL PRICE
0 0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF PRICES USED AND THE MAXIMUM AND MINIMUM NODAL PRICES DURING THE TRADING DAY HOURLY TREND OF THE SYSTEM AND REGIONAL LWAP DURING THE TRADING DAY
LOAD WEIGHTED AVERAGE PRICE DISTRIBUTION (SYSTEM, EX-ANTE) LOAD WEIGHTED AVERAGE PRICE (PER AREA, EX-ANTE)
100 TODAY THIS MONTH NORTH LUZON METRO MANILA SOUTH LUZON LEYTE/SAMAR CEBU NEGROS BOHOL PANAY
15000
80
60
9000
40
6000
20
3000
0
0
0 and Below 0 - 2000 2000 - 4000 4000 - 6000 6000 - 8000 8000 - 10000 and
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
10000 Above
DISTRIBUTION OF THE HOURLY SYSTEM LWAP DURING THE TRADING DAY AND THE CURRENT BILLING MONTH. HOURLY LWAP TREND IN VARIOUS AREAS IN LUZON AND THE VISAYAS, SUCH AS NORTH LUZON, METRO MANILA,
THE DAILY AND MONTHLY PERCENT OF TIME IS CALCULATED BASED ON A 24-HOUR TIME PERIOD AND THE TOTAL SOUTH LUZON, LEYTE/SAMAR, CEBU, NEGROS, BOHOL, AND PANAY
NUMBER OF HOURS DURING THE CURRENT BILLING MONTH AS OF THE TRADING DAY, RESPECTIVELY.
Daily Market Update
Trading Day: 10 March 2018, Saturday Ref# DMU_20180310-069
MARKET INDICES
MARKET RESIDUAL SUPPLY INDEX VS. PIVOTAL SUPPLIERS (SYSTEM) PIVOTAL SUPPLIER FREQUENCY INDEX (SYSTEM)
PERCENT OF TIME
120 6 60
80 4 40
40 2 20
0 0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF THE MARKET RESIDUAL SUPPLY INDEX (MARKET RSI) PLOTTED AGAINST THE NUMBER OF
PIVOTAL SUPPLIER/S. THE RSI MEASURES THE RATIO OF AVAILABLE GENERATION WITHOUT A GENERATING
PLANT TO THE TOTAL GENERATION REQUIRED TO SUPPLY THE DEMAND. THE PERCENTAGE OF TIME THAT A GENERATING PLANT WAS PIVOTAL DURING THE TRADING DAY. THE PERCENTAGE OF
TIME IS CALCULATED BASED ON A 24-HOUR TIME PERIOD.
100 PERCENT 10
FREQUENCY
FREQUENCY, NO. OF INTERVALS
80 8
PERCENT OF TIME
60 6
40 4
20 2
0 0
THE FREQUENCY AND PERCENTAGE OF TIME THAT A GENERATING PLANT BECAME THE MARGINAL GENERATOR
(PRICE SETTER) DURING THE TRADING DAY. THE PERCENT OF TIME IS CALCULATED BASED ON A 24-HOUR
TIME PERIOD.
Daily Market Update
Trading Day: 10 March 2018, Saturday Ref# DMU_20180310-069
- THERE WAS A NATURAL GAS FUEL RESTRICTION FROM SPEX MALAMPAYA ONSHORE GAS
PLANT AT 0001H, LIMITING ILIJAN CCPP (1200MW CAPACITY) TO 857MW.
- VISAYAS GRID WAS PLACED UNDER YELLOW ALERT AT 1815H WITH RESERVE BELOW
SYSTEM RESERVE REQUIREMENT. DERATED PLANTS WERE EDC(366MW), LGPP(55MW)
AND PGPP. IT WAS LIFTED AT 1915H.
- THVI UNIT 1 (WITH INITIAL LOAD OF 8.5MW) WENT ONLINE AT 2203H, UNDER TEST
AND COMMISSIONING.
LISTED HERE ARE ALL OTHER SIGNIFICANT EVENTS THAT WERE NOT TOTALLY CAPTURED IN THE
PREVIOUS GRAPHS AND TABLES, SUCH AS, LOAD DROPPING (AUTOMATIC OR MANUAL),
GENERATOR TRIPPING (UNPLANNED), SIGNIFICANT LINE OUTAGES, MARKET INTERVENTIONS, ETC.