KALESHWARAM PROJECT UNDER GROUND

HYDRAULIC PARTICULARS OF HEAD


SLUICE AT CH:1700 OF BUND-1

Discharge (Required) 6 Cumecs


PUMP HOUSE
PROGRESS OF WORK OF LINK - IV - PACKAGE -10 Discharge 321 Cumecs
Discharge (Designed) 6.21 Cumecs
Bed Width 3.2 m
HYDRAULIC PARTICULARS OF HYDRAULIC PARTICULARS OF Size 21.5 m x 134.5 m FSD 1.5 m
APPROACH CHANNEL GRAVITY CANAL
Static Head 95.682 m Free Board 0m
(Km 0.000 to Km 1.155) (Km 1.155 to Km 3.311)
Dynamic Head 101.2 m Bed Fall 0m
Length Length 2156 m Velocity 0.76 m/s
1155 m Motors 4 x 106 MW
Discharge (Required) 321.350 Cumecs TUNNEL DETAILS CBL at U/S 376.5
Discharge (Required) 482.025 Cumecs Pumps
(Km 3.535 to Km 11.186) 4 x 80.33 Cumecs CBL at D/S 376.5
Discharge (Designed) Discharge (Designed) 328.477 Cumecs
482.610 Cumecs Auxiliary Power
Length 42 MW No of vents 2
Bed Width 23.750 m 7651 m
Bed Width 85.250 m Size of vent 1.4m X 1.5m
Pumping Details 90 Days (88.24TMC)
FSD 5.1 m FSD 5.1 m Discharge 321.333 Cumecs
Delivery Mains 4 x 5m dia
Free Board 0.9 m Free Board 0.9 m
'n' Value 0.018
Bed Fall 1 in 4350 m EL. 399.500
Bed Fall 1 in 11700 m
Velocity 3.934 m/s
Side Slope 1.5 : 1
Side Slope 1.5 : 1 ADIT-3 to
DELIVERY
Velocity 2.051 m/s Bed Fall 1 in 2078 m Pump House
Velocity 1.019 m/s ADIT 2 CISTERN FRL +397.00 M
120 mm Thick 500 mm Thick
Lining Un Lined PCC Lining
(M15 Grade)
PCC Lining
(M30 Grade)
ADIT 1 Avg. GL+365.000
ANANTAGIRI
RESERVOIR (3.5 TMC) Earth Dam
Open
SLOPE 1 IN 12 SLOPE 1 IN 20 Surge
Pool 56m +327.000 N.O.F DAM
Dia Delivery Mains
MDDL + 314/317.3M 4 x 5 m Dia
FRL + 318.00M

CBL 308.250
CBL 308.751

CBL 308.327
CBL 309.000

CBL 308.522

KM. 2.839 G.L 316.244


KM. 2.668 G.L 319.183
G.L.309.280

KM. 1.155 G.L.318.000

KM. 1.986 G.L.326.130

PUMP C/L +286m

G.L 322.412

G.L 321.882
KM. 3.535 G.L 321.105
IL +295.000
CBL 308.141

IL +295.000

IL +278.750
KM. 3.311 G.L 316.240

KM. 10.341 G.L 351.632


IL +275.698
MID MANAIR

INTAKE STRUCTURE
HEAD REGULATOR

SLOPE 1 IN 2078

KM. 6.780 G.L 341.103


IL +277.404

KM. 11.000 G.L 362.600

IL +273.000
+273.000 +270.800

IL +275.372
KM. 11.186 G.L 362.900
RESERVOIR SLOPE 1 IN 80
KM. 0.000

KM. 3.980
KM. 3.655
DLRB

SLRB

S.P.

1155 2156
APPROACH GRAVITY CANAL 7651M LENGTH 9.5M DIA. (D SHAPE) TUNNEL
CHANNEL 224

LONGITUDINAL SECTION Sircilla (Dist)

ADIT-3 to Karimangar (Dist)


Pump House
At Tippapur
AYACUT

100
0

200
300
5.0m Ø STEEL

400
500
600
DELIVERY MAINS

700
800
900
1000
1100
1200
SA
DELIVERY MAIN DD

1300
LE

1400
SHAFT CISTERN BU

1500
ND
1

1600
1675
DELIVERY MAIN
TUNNEL
PUMPHOUSE
415

ANANTAGIRI
400

VENTILATION 300

FLOW
21.5X134.50M

NOF
SHAFT 10m Dia
200

100
RESERVOIR Siddipet (Dist)
SERVICE EL:282.0M

CONTROL 0
BAY 04

ROOM D

(3.5 TMC) TO CATER


LIFT

03
D

0
EL +299.00

ADIT-2 EL +303.80 100


200

Tippapur NEW AYACUT OF 300


400

SADD
500
0
30,000 ACRES AND 600

LE BU
0
700

10

0
20
800

ND 2
BALANCING

30
DRAFT TUBE

0
900

40
N.O.F DAM

0
TUNNELS 1000

50
0
60 1100
415m Length 800
RESERVOIR FOR
700 12
00

13
00

KM. 6.780

00
900

PKG -11

14

00
BUS DUCT

3
EL. 275.50

1600
15
1000

1700

1800
1900
ND

2000
2025
1100

BU
SHAFT 8m Dia 1200

EL. 288.00

EL. 273.00

DLE
1300

Mid Manair

SAD
1400

1500

Reservoir 1600

1700
SURGE
FRL + 318M, POOL-56m Dia
1800

1900

2000
INTAKE STRUCTURE

MDDL + 314M

KM. 10.341
2100
Length of Bunds
TRANSITION

2200

2300

Bund-I 1675 m
2400
H. REGULATOR

DLRB

SLRB

S.P.

Bund-II 2025 m
ADIT-1 Bund-III 2400 m
Anantharam

K.M. 11.186
K.M. 0.000

K.M. 4.287

K.M. 4.699

K.M. 7.030
K.M. 2.067

K.M. 9.502

Cherlavancha (V) Vobulapur (V) Velgipur (V) Anantaram (V) Tippapur (V)
Vallampatla (V)
PLAN AGENCY: HCC - MEIL - BHEL JV