Professional Documents
Culture Documents
Kaleshwaram Project: Progress of Work of Link - Iv - Package - 10
Kaleshwaram Project: Progress of Work of Link - Iv - Package - 10
CBL 308.250
CBL 308.751
CBL 308.327
CBL 309.000
CBL 308.522
G.L 322.412
G.L 321.882
KM. 3.535 G.L 321.105
IL +295.000
CBL 308.141
IL +295.000
IL +278.750
KM. 3.311 G.L 316.240
INTAKE STRUCTURE
HEAD REGULATOR
SLOPE 1 IN 2078
IL +273.000
+273.000 +270.800
IL +275.372
KM. 11.186 G.L 362.900
RESERVOIR SLOPE 1 IN 80
KM. 0.000
KM. 3.980
KM. 3.655
DLRB
SLRB
S.P.
1155 2156
APPROACH GRAVITY CANAL 7651M LENGTH 9.5M DIA. (D SHAPE) TUNNEL
CHANNEL 224
100
0
200
300
5.0m Ø STEEL
400
500
600
DELIVERY MAINS
700
800
900
1000
1100
1200
SA
DELIVERY MAIN DD
1300
LE
1400
SHAFT CISTERN BU
1500
ND
1
1600
1675
DELIVERY MAIN
TUNNEL
PUMPHOUSE
415
ANANTAGIRI
400
VENTILATION 300
FLOW
21.5X134.50M
NOF
SHAFT 10m Dia
200
100
RESERVOIR Siddipet (Dist)
SERVICE EL:282.0M
CONTROL 0
BAY 04
ROOM D
03
D
0
EL +299.00
SADD
500
0
30,000 ACRES AND 600
LE BU
0
700
10
0
20
800
ND 2
BALANCING
30
DRAFT TUBE
0
900
40
N.O.F DAM
0
TUNNELS 1000
50
0
60 1100
415m Length 800
RESERVOIR FOR
700 12
00
13
00
KM. 6.780
00
900
PKG -11
14
00
BUS DUCT
3
EL. 275.50
1600
15
1000
1700
1800
1900
ND
2000
2025
1100
BU
SHAFT 8m Dia 1200
EL. 288.00
EL. 273.00
DLE
1300
Mid Manair
SAD
1400
1500
Reservoir 1600
1700
SURGE
FRL + 318M, POOL-56m Dia
1800
1900
2000
INTAKE STRUCTURE
MDDL + 314M
KM. 10.341
2100
Length of Bunds
TRANSITION
2200
2300
Bund-I 1675 m
2400
H. REGULATOR
DLRB
SLRB
S.P.
Bund-II 2025 m
ADIT-1 Bund-III 2400 m
Anantharam
K.M. 11.186
K.M. 0.000
K.M. 4.287
K.M. 4.699
K.M. 7.030
K.M. 2.067
K.M. 9.502
Cherlavancha (V) Vobulapur (V) Velgipur (V) Anantaram (V) Tippapur (V)
Vallampatla (V)
PLAN AGENCY: HCC - MEIL - BHEL JV