Sdn. Bhd.

level (m)
level (m)

Distance (m)
28
30

29
31
32
33
34
35
36

Paragon Contractor
Existing Ground
Proposed Platform
5.36 30.42 32.00

6.66 31.45 32.00

9.14 31.76 32.00

13.82 31.85 32.00

23.78 31.69 32.00

24.75 32.12 32.00

26.68 31.65 32.00

59.02 31.82 32.00

70.14 32.10 32.00

Elevation of cut and fill section a-a


81.03 32.28 32.00

80.71 32.22 32.00


Construct and complete a 3 storey Laboratory block

93.01 32.97 32.00


School of Material Engineering in Pauh Putra Campus

90.22 32.22 32.00

110.17 31.96 32.00

134.05 33.88 32.00

159.04 32.16 32.00


5/20/2020

192.78 32.11 32.00

201.30 35.71 32.00

204.34 34.81 32.00