TYBMS – Operations Research Date – 5th March 2020

Attempt any THREE questions Marks : 45 Duration: 1 ½ hr


Q.1. ABC ltd. Manufactures two products P and Q. Profit per unit for P and Q is Rs. 40 and Rs. 80
respectively. One unit of P requires 2 machines hours and one unit of Q requires 3 machines hours.
Availability of machine hours is 48.
Maximum market demand for P is 15 units and for Q is 10 units. Formulate as LPP and solve by graphical
method to obtain maximum total profit.
Q.2. A company has 3 warehouses W1, W2 and W3 from where it supplies products to 3 markets M1, M2 and
M3. Availability at warehouses is 2000, 1500 and 100 units. Market requirements are 1200, 1800 and 1000
units. Profit potential per unit from each warehouse to each market is as follows:
To Profit per unit (Rs.)
From M1 M2 M3
W1 25 22 23
W2 15 20 18
W3 18 17 16
Find optimal transportation schedule to maximize total profit.
Q.3. The following is the cost matrix (cost in Rs. 1000) of assigning 4 clerks to 4 key purchasing jobs.
Clerk 1 cannot be assigned to job 1.
Jobs
Clerks J1 J2 J3 J4
1 - 5 2 0
2 4 7 5 6
3 5 8 4 3
4 3 6 6 2
Find an Optimal Assignment to minimize total cost. Each clerk can handle only one job. Write an alternate
optimal solution if it exists.
Q.4. A company has three factories F1, F2 and F3 with supply of 800, 600 and 1000 units respectively.
There are four warehouse W1, W2, W3 and W4 with demand of 400, 500, 700 and 800 units respectively. A
feasible solution is give below. (With allocations and unit cost data)
i. Test the solution for optimally using modified distribution method
ii. If the solution is not optimal, find optimal solution by modifying it
iii. Find minimum transportation cost
To W1 W2 W3 W4 Supply
From
F1 800
300 12 500 6 20 25
F2 6 11 600
100 500 15 12
F3 9 15 17 1000
200 800 7
Demand 400 500 700 800 2400
2400