WORK LIST No. : 18-1431582 IWL.DESC.: NHT : T&I-2019- IWL for piping loop # 63 Date:
LOCATION : NHT_PIPING LOC.DESC.: NHT Unit piping INSP. BY: B M JEELANI
Equipment : REF:
Visual inspection and thickness gauging of Loop No #63 NHT (12" FG from FG Header
to 73V-08) was carried out. The following are the observations and recommendations.
10 Loop No #63 NHT (12" FG from FG Line was found in satisfactory condition. Offer hydro test of the line at 13.5
Header to 73V-08) Kg/cm.sq
20 - - -
____________________________
HEAD-INSPECTION