Professional Documents
Culture Documents
Cinepolis Scope - Reach Vasai
Cinepolis Scope - Reach Vasai
Cinepolis Scope - Reach Vasai
4. Toilets Toilets to be done by Cinepolis Completely finished toilets with all fixtures and fittings as per the Vasai –
Developer’s Mall toilet specifications. In case Cinepolis requires Toilets to be done by
different specification, Cinepolis shall pay the differential additional Developer
cost.
5. Fire detection Fire safety and protection as per Fire safety and protection as per fire norms with complete high side Vasai –
& protection fire norms with complete high side and low side works integrated with Mall fire alarm system as per Fire doors with panic
and low side works integrated with CFO norms. bars, fire extinguishers
Mall fire alarm system as per CFO All the fire doors with panic bars in multiplex area (Incl Audis) will be to be done by
norms. provided by the developer Developer
Fire extinguishers to be provided for the projection rooms, lobby,
offices, audis, back areas and stores etc in entire multiplex area as
per the fire clearance requirements
6. Telephone/int Developer to provide at one point a Cabling for satellite / cable TV / data cable shall be provided Vasai –
ernet/TV 20 pair CAT 5cable connection in Provision for the routing of cabling for CCTV, computer, and ticketing Routing for cabling at
the Unit. systems at various levels and location for the VSAT and RF Antenna various locations and
at terrace facing south to be provided by Developer and the location space for VSAT and RF
to be provided near to a shaft for the conducting till the server room. antenna to be provided
7. Power, DG Power load requirements Power load requirements approximate 35-40 KW per Audi Vasai –
Power & approximate 300 KW. To be Stabilized power supply 3-phase 4 wire, 415 volts, 50 htz. Earth pits – 7 nos
Earthing finalized at the time of finalization Adequate size cable to be terminated in Lessee electrical panel. Lightning protection
of the GFCs of the Unit. 2 numbers adequately sized body earth strips shall be provided at
two locations within the scheduled Multiplex
Adequate size cable to be 100% Power back-up through dedicated DG set. Cables of adequate
terminated in Lessee electrical size shall be terminated into the Cinépolis main electrical and
panel. smoke panel.
Dedicated earthing pits. Additional earth pit location (7 numbers) to be provided
Electrical & DG Meter Lightening protection shall be provided
100% Power back-up through
common DG set.
All charges and/or deposits, if
any, towards the provision and
installation of necessary facilities
for power and earthing payable
to the concerned authority shall
be borne and paid by Cinepolis
8. HVAC High side including AHU’s and AHU The developer shall be providing the complete air conditioning Vasai –
panels (including standard system, including AHU'S of blue star, carriers, voltas, or equivalent Double skinned AHU’s
warranties as applicable on AHU’s) make, cooling towers, condensing, chilled water pumps, piping with with motorized
insulation, starter, electrical panel and cables up to the cinema modulating valves,
premises balancing valves,
AHUs provided shall be double-skinned. All piping and accessories butterfly valves,
up to and including AHUs with necessary motorized modulating automatic fire
valves, balancing valves, butterfly valves, automatic fire dampers, dampers, drain piping,
drain piping, starter panels, cables, and acoustic insulation, etc shall starter panels, cables,
be provided by the developer. and acoustic insulation
Separate AHUs shall be provided for each auditorium and projector Air conditioning for
rooms. The entire HVAC system shall operate around 35 dB level office rooms and cold-
inside the auditorium at the seating level. storage room shall be
Air conditioning for the office rooms and the cold-storage room split / cassette units to
shall be split / cassette units to be provided by the developer. Each be provided by the
Audi shall be provided with dedicated smoke extraction & developer. Each Audi
compensation air axial flow fans with two hr fire rating as per shall be provided with
National Building Code. The chilled water shall be supplied at each dedicated smoke
AHU, TFA & Fan coil units at 7 deg C & 3.5 Kg/Sqcm pressure to extraction &
maintain inside temperature of 22 ± 1 deg C. compensation air axial
Back-up airconditioning in the form of split/cassette type unit for flow fans with two hr
Server room for 24 Hrs Operation. fire rating as per
National Building Code
Back-up air
conditioning in the
form of split/cassette
type unit for Server
room for 24 Hrs
Operation.
9. Elevators and The Developer shall provide 2 non- 1 service elevator (2,000 kg capacity) in common with the other Reach –
Escalators exclusive passenger elevators and 2 occupants of the Mall from ground up to the projection floor level Specs for service
non-exclusive escalators upto the Common staircases and escalators till Multiplex levels shall be elevator not
Cinema floor. provided mentioned
10. Shop front Cinepolis to install the shop front Rolling shutters, glazing or alternative locking mechanism shall be Reach –
glazing and glazing and rolling shutters provided at all entry and exit locations of the scheduled Multiplex. Rolling shutters and
Rolling (without disturbing the common Front façade glazing towards the atrium to be provided façade in Cinepolis
Shutters area finishes) as per the Fit-Out Scope
Manual at its own cost and Vasai - Rolling shutters
expenses. and façade in Developers
scope
11. AMC and AMC and replacement of all capital AMC and replacement not mentioned
replacement equipment within the Premises
including AHU’s shall be the
responsibility of the Licensee.
12. Signage 2 façade signage 2 façade signage - 12 mt wide and 3 mt height and second of size 10 Vasai –
mt wide and 2.5 mt height Signage for each
Billboard (20' x 10' each) on façade with completely finished screen on the façade
framework & structure. The location of the billboards shall be 2logo signage on the
mutually decided by the parties. One billboard per screen to be facade
provided on façade as per agreed locations. The location shall be
finalized taking into consideration the architect’s design