VISAKH REFINERY

FORMAT OF INSPECTION WORK LIST


TECHNICAL DEPARTMENT Doc. No. OCP/TSD/FR/305/Rev.2
Rev. Date : 16-Jan-02
(Ref. Pro.:OCP/TSD/PR/204)
Page 1 of 1

WORK LIST No. : 18-1758723 IWL.DESC.: NHT : T&I-2019- IWL for piping loop # 20 Date:
LOCATION : NHT_PIPING LOC.DESC.: NHT Unit piping INSP. BY: B M JEELANI
Equipment : REF:
Visual inspection of Loop No # 20 NHT (72-K-01A Discharge PSV line to 72-PSV-31)
was carried out. The following are the observations and recommendations.

Sl No. LOCATION/ITEM OBSERVATION RECOMMENDATION

10 Loop No # 20 NHT (72-K-01A 1. Visual Inspection of Piping loop was carried out. General condition Nil
Discharge PSV line to 72-PSV-31) of pipeline was found satisfactory.

2. Line being replaced with modified Spec.

____________________________
HEAD-INSPECTION

Page 1 of 1 Tuesday, March 12, 2019