VISAKH REFINERY

FORMAT OF INSPECTION WORK LIST


TECHNICAL DEPARTMENT Doc. No. OCP/TSD/FR/305/Rev.2
Rev. Date : 16-Jan-02
(Ref. Pro.:OCP/TSD/PR/204)
Page 1 of 1

WORK LIST No. : 18-1800176 IWL.DESC.: NHT : T&I-2019- IWL for piping loop # 22 Date:
LOCATION : NHT_PIPING LOC.DESC.: NHT Unit piping INSP. BY: B M JEELANI
Equipment : REF:
Visual inspection and thickness gauging of Loop No # 22 NHT (72-V-05 to 72-K-01A/B
suction line & ejector line) was carried out. The following are the observations and
recommendations.
Sl No. LOCATION/ITEM OBSERVATION RECOMMENDATION

10 Loop No # 22 NHT (72-V-05 to 72- Visual Inspection of Piping loop was carried out. General condition of Offer hydro test of the line @
K-01A/B suction line & ejector line) pipeline was found satisfactory. 36Kg/Cm.Sq.

____________________________
HEAD-INSPECTION

Page 1 of 1 Thursday, March 21, 2019