Professional Documents
Culture Documents
TNM 1 Installation
TNM 1 Installation
1. Attach the mounting plate to the bottom of the TNM-1 using two M4 screws.
Mounting Plate
2. Attach the TNM-1 unit to the TOC-V main unit using three M4 screws
M4 Mounting Screws
2 TNM-1
1.3 Connecting the NDIR
Purge Gas
(located below the Long Cell)
To TNM-1
Procedure
3. Connect the purge gas line to the inlet below the long cell.
TNM-1 3
1.4 Installing the Ozone Treatment Unit
Procedure
1. Open the hose clamp at the top of the unit and connect it to the Viton coupling
Hose Clamp
Viton Coupling
2. Open the hose clamp at the bottom of the ozone treatment unit and connect the
Viton tubing.
Hose Clamp
Viton Tubing
4 TNM-1
1.5 Connecting the Gas Tubing
3. Attach the installation bracket and secure it with the knurled screw at the
bottom of the unit.
Ozone Treatment Unit
Knurled Screw
Installation Bracket
Connection Inlet
Half Union
Nylon Tubing
TNM-1 5
1.5 Connecting the Gas Tubing
Procedure
1. Connect the half unions to the carrier gas inlet on the instrument and the
connection outlet (¼” PT) of the gas supply source.
2. Connect the nylon tubing (4mm O.D., 2.5mm I.D.) between the gas supply
source and the instrument.
Note: The nylon tubing can be connected simply by firmly inserting it into
the half union. When disconnecting the tubing, pull off the tubing
while pushing down firmly on the green-colored ring of the half union
using a screwdriver.
4. After connection, check to see that there are no gas leaks.
CAUTION
6 TNM-1
1.6 Connecting the Cables
Procedure
1. Connect the CN-2 cable of the TNM-1 to the NDIR of the TOC-V.
Connect CN-2 from the TNM-1
2. Connect the CN-9 cable to the CPU main board of the TOC-V main unit.
TNM-1 7
1.6 Connecting the Cables
8 TNM-1