P1 Ka P1 Ki

75 Ha 0 l/dt 100 Ha 0 l/dt

B1 Ka B1 Ki L1 Ka
100 Ha 0 l/dt 95 Ha 0 l/dt 96 Ha 0 l/dt

B2 Ka B2 Ki L2 Ka
85 Ha 0 l/dt 80 Ha 160 l/dt 95 Ha 0 l/dt
P2 Ki P3 Ka P3 Ki
76 Ha 0 l/dt 100 Ha 0 l/dt 86 Ha 0 l/dt

L1 Ki
100 Ha 0 l/dt

L2 Ki
100 Ha 0 l/dt
Analisa Data

A. Debit Pada Saluran Tersier

NFR = 1.60 l/dt. Ha


Eff = 0.8
C = 1

C x NFR x A
Q =
Eff

1 x 1.60 x 85
QS2ka = = 170 l/dt
0.8

1 x 1.60 x 80
QS2ki = = 160 l/dt
0.8

1 x 1.60 x 100
QS1ka = = 200 l/dt
0.8

1 x 1.60 x 95
QS1ki = = 190 l/dt
0.8

1 x 1.60 x 75
QP1ka = = 150 l/dt
0.8

1 x 1.60 x 100
QP1ki = = 200 l/dt
0.8

1 x 1.60 x 76
QP2ki = = 152 l/dt
0.8

1 x 1.60 x 100
QS3ki = = 200 l/dt
0.8

1 x 1.60 x 96
QS3ka = = 192 l/dt
0.8

1 x 1.60 x 100
QS4ki = = 200 l/dt
0.8

1 x 1.60 x 95
QS4ka = = 190 l/dt
0.8
1 x 1.60 x 100
QP3ka = = 200 l/dt
0.8

1 x 1.60 x 86
QP3ki = = 172 l/dt
0.8

B. Debit Pada Saluran Sekunder

NFR = 1.60
Eff = 0.9
Eff = 0.8
C = 1

C x NFR x A
Q =
Eff
PERHITUNGAN RB2

ARB2 = AB2Ka+AB2ki
= 85 + 80 = 165 Ha

QB2ka+QB2Ki
QRB2 =
Eff
170.00 + 160.00
= = 366.67 l/dt
0.9

atau

C x NFR
QRB2 = x AB2Ka+AB2ki
Eff

1 x 1.60
QRB2 = x 165 = 366.67 l/dt
0.72

PERHITUNGAN RB1

ARB1 = AB1Ka+AB1ki+AB2Ka+AB2Ki
= 100+95+85+80 = 360 Ha

QB1ka+QB1Ki
QRB1 = + QRB2
Eff

200 + 190
QRB1 = + 366.67 = 800 l/dt
0.9
atau

C x NFR
QRB1 = x AB1Ka+AB1ki+AB2Ka+AB2Ki
Eff

= 1 x 1.60
QRB1 x 360 = 800.00 l/dt
0.72

PERHITUNGAN RL2

ARL2 = AL2Ka+AL2ki
= 95 + 100 = 195 Ha

QL2ka+QL2Ki
QRL2 =
Eff
190 + 200
= = 433.33 l/dt
0.9

atau

C x NFR
QRL2 = x AB2Ka+AB2ki
Eff

1 x 1.60
QRL2 = x 195 = 433.33 l/dt
0.72

PERHITUNGAN RL1

ARL1 = AL1Ka+L1ki+L2Ka+L2Ki
= 96+100+95+100 = 391 Ha

QL1ka+QL1Ki
QRL1 = + QRL2
Eff

192 + 200
QRL1 = + 433.33 = 868.888889 l/dt
0.9

atau

C x NFR
QRL1 = x AB1Ka+AB1ki+AB2Ka+AB2Ki
Eff

1 x 1.60
QRL1 = x 391 = 868.89 l/dt
0.72
C. Debit Pada Saluran Primer

NFR = 1.60
Eff = 0.95
Eff = 0.9
Eff = 0.8
C = 1

C x NFR x A
Q =
Eff

PERHITUNGAN RT3

ART3 = AP3Ka + AP3Ki


= 100 + 86 = 186 Ha

QP3Ka+QP3Ki
QRT3 =
Eff

200 + 172
QRT3 = = 413.3 l/dt
0.9

Atau

C x NFR
QRT3 = x AP3Ka + AP3Ki
Eff

1 x 1.60
QRT3 x 186 = 413.3 l/dt
= 0.72

PERHITUNGAN Ruas Primer 2

ARP2 = ARN1 + AR2Ki + ARR3


= 868.9 + 338 = 1206.9 Ha

QP3Ka+QP3Ki
QRP2 =
Eff

0 + 0
QRP2 = = #VALUE! l/dt
C x NFR
Atau

Q RN1 + QRR3 QR2Ki


QRT2 = +
Effp x Effs x Efft Effp x Effs

868.889 + 413
QRT2 = + 135.1 = 2361.19136 l/dt periksa kembali
0.576

PERHITUNGAN RT1 1188

Q RB1 + QP1Ki+qQP1Ka
QRT1 = + QRT2
Eff

800 + 350.00
QRT1 = + 2361.2 = 3550.08 l/dt periksa kembali
0.9
AS2Ka = 85
AS2Ki = 80
AS1Ka = 100
AS1Ki = 95
AP1Ka = 75
AP1Ki = 100
AP2Ki = 76
AS3Ka = 96
AS3Ki = 100
AS4Ka = 95
AS4Ki = 100
AP3Ka = 100
AP3Ki = 86
653
CEK RT2
200
914.619883
413.3
1527.95322

CEK RT2
210.526316
157.894737
842.105263
2361.19136