6 Verify the facility has a system for dispatching the concrete to site QCS2010 Section 5 Part 7 Clause 7.4.1.5
11 Check the concrete produced in the Plant has no segregation. QCS2010 Section 5 Part 7 Clause 7.3.3.3
BATCHING PLANT CHECK POINTS
20 Check the storage of Cement & other additives. QCS2010 Section 5 Part 7 Clause 7.2.1.8
21 Check the drawn down time of each silos. QCS2010 Section 5 Part 7 Clause 7.2.1.9
22 Procedure adopted to prevent cement clogging in Cement Silos. QCS2010 Section 5 Part 7 Clause 7.2.1.9
The water batcher and water pipes should be leak free. And if ice
24 is used all the equipment associated with this work will be QCS2010 Section 5 Part 7 Clause 7.2.1.10 & 7.2.1.14
insulated properly.
How the facility maintain when different type of cement to be
25 used in the same time. QCS2010 Section 5 Part 7 Clause 7.2.6.4
28 Verify the consumption details of cement. QCS2010 Section 5 Part 6 Clause 6.3.16