CHECKLIST FOR KERB LAYING

Design & Construct New Orbital Highway and Truck Road (P023) Contract 3: Orbital
Project:
Highway Mesaieed to Salwa Road
Contract No.: C2013/118
IR Reference No.: Date:

Locations of work/ chainages:


LAJ CONSTRUCTION/ LAJ
STAGE SUBCONTRACTOR
AECOM
QA/QC
Pre-Construction Stage :
1.Ensure Blocks/Kerb laying machine is in good condition

2. Source/Mix design Approved?

3. Concrete conveying arrangements (including transit mixers) available in working


conditions and of sufficient capacity.
Construction Stage :
1. Check the Median opening round kerb.

2.Curing arrangements ( Not for precast kerb blocks)

3. Proper barricading is arranged for traffic management and Safety arrangements.

4. Care has to be taken in the Super Elevation Portion and Shoulders.

5. Ensure the Kerb Alignment.

VERIFICATION OF ABOVE ITEMS AND RELEASED FOR NEXT ACTIVITY


LAJ CONSTRUCTION/SUBCONTRACTOR LAJ QA/QC ENGINEER AECOM

______________________________ _______________________________ _______________________________


Date & Signature over Printed Name Date & Signature over Printed Name Date & Signature over Printed Name

Inspection Check List (EXW-P023-0003-QM-AEC-FO-00003)