LIST OF MANDATORY SPARES
CLAUSE No,
9 training idler
base frame and
above
Flat return idlers complete with
| ‘mountirg brackets ef
7 Flat retum idlers complete
Mounting brackets etc (for bs
feeders)
| Flat retum trainer complete with
mounting brackets ete
Belt cleaning spiral rubber disc
return idler complete with mounting
brackets eto.
19 |) | Two roll 10° troughing return ialer
assy
Rolls for (I) above 40 nos. }
SS idlers |
CONVEYOR GEAR BOXES |
2
Input shafts with pinion 1 set of each type and rating
Oil seals 2 sets of each type and rating
1 | Set of each type and rating
2 ‘nos. of each type and
rating
EAE RR TR Ca MAL OMERPROIECT | Saal spGcmcanON Paar
Cont HANDLING Peat PaeAGE SECTION LUST OF MANDATORY | PAGE 4oF29 |
B10 DOCUMENT No. = cS2se0-esin.2 SPARESLIST OF MANDATORY SPARES
xii) | Oil Cooler valves ae
Belting
Conveyor 3oit
i) Manca
|
Boom conveyor, beitfeeder:
intermediate conveyor & bunker
drum length of 250 m of
each type, size and rating
complete length of each
| esataae Ia |
@) Brakes |
) | Brakes 1 | no of each size & type
ii) Brake shoes 2 | sets of each size
E) PULLEYS : : 7 —_
| Pulleys complete with shal 1
excluding bearing & plummye
blocks (complete with laggins
no. of each type and size in
pulloy drum and shaft
| dia.(for population upto 10
| Nos)
Plummer Block coinplete with
bearings & sleeve
SS Pulleys complete with shaft
‘excluding bearing & plummer
| blocks (complete with lagging)
ii)
|
no. of each type and size in
| pulley drum and shaft
| dia.(for population more
| than 10 Nos)
no. each type and size
no. of each type and size in
pulley drum and shaft dia
BELT CLEANERS AND SKIRT
i) | Modular segments for belt cleaner 5 %60f total population of
each type & size
ii) | Modular segments for skirt board 5 of total population of
edkh type & size
Skirt Rubber 5
| iii)
| |
sof \ptal population of
each Nype & size
TWUZAFFARPUR THERIAL POWER PROJECT
Ses eainanT TECHNICAL SPECIFICATION
COAL HANDLING PLANT PACKAGE
[BIO DOCUMENT NO. : ۤ-0350-155(R)2
SECTIONVI
List oF MANDATORY | PAGE 6 OF 39
PART
SPARES
ae
ee le
ia
moO HOP ANnMnonnLIST OF MANDATORY SPARES.
1 set
output shaft, gearset)
ili) | Bearings for reducer
blocks, bearings etc.
v)_ | Oil seats nos. of each size
vi) | Non-drive axle with wheels 1 set of each type
: plummer blocks, bearings etc.
Chain assembly with sprockets 1 set of each type & size
‘ Festoon Roller assemily for flexible a Nos
: cable
ix) | Pulleys and plummer block 1 no of each type
bearings
x) _| Plummer block with bearing for 1 sebgf each type
cable reel drums
Rae + — —- — 4
R) | STACKER/RECLA'‘MER
(including boom conveyor)
: 1 Fluid coupling (complete) 1 no, of each type
: 2 Fluid coupling spares |
° 1) | Fusible plug 4 sets for each type of
: coupling |
7 it) | Oilseats 4 | sels for each type of
| coupling
: ii) | Bearings 2 set of each type.
3 Couplings consisting input and 1 | no. of each type.
- output halves (for travel drive) i
'MUZAFFARPUR THERIAL POWER PROJECT
TECHNICAL SPECIFICATION PARTE
‘STAGE (2xt95 MW)
(COAL HANDLING PLANT PACKAGE SECTIONN! | List oF maNoATORY |PAGE 13 OF 33,
SPARES
- BID DOCUMENT No. :€5-0350-155(R}2CLAUSE NO.
LIST OF MANDATORY SPARES
4 Bearings excluding slewing 1 no.of each type
bearings
5 Hydraulic pump with electric motor 1 no. of each type
& valves
6 Hydraulic cylinder 1 no. of each type
7 set for each type of cylinder
T
Repair kit for hydraulic cylinder 2 |
including oil seals etc. |
Grease pump 1
no, of each type
2 |
sets of each type and size
nos. of each type
nos of each type and size
nos of each type and size
consisting of motor, gear box
coupling, brake etc., as applicable
13 | i) | Carbon brushes for current 2 sets for each drum
collector of cable reeling drum
o — as a - iE a
|) iy) Plummer blocks and bearings of | 1 | set of each type
(CRD) |
a os _ 7 a —
14 | Traverse drive assembly consisting | 1 no, of each type and
of reducer, couplings, brake assy. direction
etc.
las Brake shoes 4 sets for each type of brake
16 Complete carriage wheel assembly 1 sets
po | je —— ee —
(Each set comprising of 1 wheel + 1 |
axle + 2 bearing + 2 locking assly) |
Ww Complete bucket with liners, ete. ql Bucket requirement
\\ 48 Drive assembly of cable reel drive 1 set of each type
MUZAFFAROUR TWERWWAL POWER PROJECT
STAGE:
COAL HANDLING PLANT PACKAGE
BID DOCUMENT NO, :cS.0250-485(R}2 |
TECHNICAL SPECIFICATION
SECTIONN
(2186 HW)
us
PARTE
IST OF MANOATORY [PAGE 14 OF 33
SPARES |
|
OO Pe
ra)LIST OF MANDATORY SPARES
19 Chain & chain sprockets 1 set of each type
2 Cable guide assembly fl set of each type
| ar Various plummer block used 1 no, of each type & size
Stacker reclaimer
“2 | Plummer block wth bearing for 1 Setofeachiype
| cable reel drums
23, Rall clamp assembly 1 set of each type
Pa Seal itor thrustor assembly || -—1—_—(| setofeach ype
| “Tustor eyinder assembly ( setofeachype
is 7 aa ——
| — —
1, Tool to brake a l No.
- 2. Fan 4 No. :
_ Eres 2 Nos |
4. Brake pads \ _ 7-2 2
5, Adjusting sleeve \ 2
6. Fixed brake disc 2
“|b. [worm Gear i 7
1, Worm gear + Ino
2.'0' ring 2 nos. of each type
L 3. Sealing ring 2 nos. of each type |
7 ¢. | Door Front 7
f 1. Bearing _ _
- Pa Nines |
zeae Pe
kK
i
‘WUZAFFARPUR THERMAL POWER
‘COAL HANDLING PLANT PACKAGE
| Bio DOCUMENT NO. : CS-0350-155(R}2
‘STAGEA (axte5 iW) TECHNICAL SPECIFICATION |
SECTION-WI
1
_-—_—_|
PART-F
LIST OF MANDATORY [PAGE 15 OF 33,
SPARES.CLAUSE NO.
°
LIST OF MANDATORY SPARES
Main pad
complete
pressure, |
Flexible Trailing cable (pi
control)
‘Traverse drive motor, gear box
assy
Cooling fan with motor for oil cooler
Oil filing motor
length each type
sot of each type |
set of each ype
|
10 DOCUMENT
NO. : €8-0950-155(R}2
SPARES
9_| Slip ring and carbon bushes
10 | Servo motor 1 no.
11._| Motor terminal block with studs for 1 set of each rating and type
| all mot of motor
| i. — . oes
42 | Carbon brushes for currant 2 ays
| collector of cable reeling drum
(CRD)
B) CONVEYORS |
| Grchuding Boom
Conveyorfintermediate conveyor of
stacker reclaimers/ball feeders) |
faa ned +— ~~
1 | Drive Motor 1 _| no. of each type & rating
| | (for population upto 10
| Nos)
| 2 no. of each type & rating
| {for population more 10
Nos)
[ AOE aR OT | Tecwwcaseecricanion [pane |
COAL HANSLNG PLANT PACKAGE SECTION! LUST OF MANDATORY |PRGE 220F 32| cimsevo. | LIST OF MANDATORY SPARES
| 2. | Belt way Switches % of each type
3 | Pull cord switches % of each type
Zero speed switches % of each type |
Chute Block switches 18 % of each type
6 | Position switches for trippers, 10 % of each type
paddle feeders
7 | Sensoriprobe for zero speed switch 20 % (min. 1 no)of each type
and speed range
8 | Microftimit switch of pull cord 20 %{min. 1 no}of each type
switch, belt sway awitches, chute
block switches
| 9° | Motor terminal block with studs for 1 set. of each type and rating
| all motors of motor
10. | Temperature transmitter 10%
°c) CRUSHING EQUIPNENT
[1 [motor of erusher 1 No.
2 | Setof pressure, temperate flow | 2——_| nos. of each typ and
switches, zero speed/undenepeed | rating
| switches, limit switches etc.)
| 3 | Motor terminal block with studs 1 set of each rating and type |
| all motors of motor |
— _ _ a
4 | Temperature transmitter 10%
pop fp 7 . |
D) | a) | MAGNETIC SEPARATORS
| —__| \ | -—
i 1 | Rectifier with surge absorber set
Lo —— aa
| Rectifier transformer 1 | no.
| 3 | Auxiliary and power relays 2 [ res. of each type.
4 | Control transformers \ve of each type
: iMUZAFFARPUR THERWAL POWER PROJECT 1 “TECHNICAL SPECIFICATION vate |
COAL HANDLING PLANT PACKAGE SECTION. List OF MANDATORY |PAGE 23 OF 33
5 1D DOCUMENT NO. = ¢5.0350-1851R)}2 | SPARES