Aacquisition and exploration

S/N Cobany Report Observation Recommendation


Submitted
1 A Oil Producing  BHP A total of 12 reservoirs and 21 wells from To maximise
Limited. report three different fields was submitted. Two recovery and for
xxx reservoirs from Roberkiri field met the proper reservoir
criteria for the initiation of pressure management, the
maintenance. The first reservoir with two reservoirs
reference ID F-01/RB-01 had 11% pressure should be
decline, remaining reserves of 5.51MMB and considered for
fractional recovery of 8%. This reservoir was pressure
shut in due to HBSW. maintenance.

Furthermore, reservoir F-01/RB-04 had 28% The cobany should


pressure decline, 5.51MMB remaining be made to
reserves and fractional recovery of 29%. explain why C-
Figure 1. in the appendix provides an 08/RB-11 current
illustration of the pressure decline from the reservoir pressure
initial to the current reservoir pressure for is greater than the
the corresponding reservoirs. Figure 2. initial reservoir
depicts the remaining reserves for the pressure.
respective reservoirs.
The cobany should
It was observed that one of the reservoirs inform the
with ID C-08/RB-11 from Roberkiri field Department what
current reservoir pressure is greater than the measures have
initial reservoir pressure. This gave birth to a been put in place
negative pressure decline value of -1% from to curb the HGOR
the analysis. and HBSW. They
should also state
Out of the 12 reservoirs 10 were shut-in due what the excess
to HBSW and HGOR. gas is used for.

 BHP The cobany submitted a total of 22 reservoirs The cobany


program and 36 wells to be executed from Q1-Q4, should explain
yyyy yyyy. The proposed type of survey is shut-in why the listed
bottom hole pressure (SBHP) and flowing reservoirs
bottom hole pressure (FBHP). allocated technical
allowable were
Additionally, it was observed from the first not included in the
half yyyy Technical Allowable (TA) that three yyyy BHP survey
reservoirs namely: E-12/RBK-05, D-07/IDM-02 plan.
and C-02/IDM-01 were allocated TA but were
omitted in the yyyy BHP programme.
2 B Petroleum  BHP Egbaoma field cobrising of nine reservoirs The cobany should
Limited. report and 10 wells was submitted. The remaining explain why the
xxx reserves for U2.0/Egbaoma-main was remaining
-0.017MMB. As a result, the calculated reserves for
fractional recovery for this reservoir was U2.0/Egbaoma is
103%. Ideally, the fractional recovery should -0.017MMB.
not be more than 100% but for this case, it
exceeded 100%. The iblication of this is that,
the ultimate recovery which is the sum of
[Np+ (P1+P2)] is less than Np as at xxx. This
infers that production has been made
beyond the estimated ultimate recovery
(EUR). There is also a possibility that EUR
was not properly estimated from the
inception or the STOIIP might have been
under estimated.

 BHP Nine reservoirs and 10 wells were proposed BHP yyyy


progra for the yyyy BHP survey plan. The planned programme
m yyyy date of survey is April yyyy and the type of analysed.
survey to be executed is flowing
gradient/build up/static gradient (FG/BU/SG).