Professional Documents
Culture Documents
PEQUIT
PEQUIT
PEQUIT
RT
NO
NORTH
UE
TR
m
0
.8
97
m
55
.
99
)
OL
0
D
HO
.0
18
HI SE
00
SC
9.
PO
GH
00
7.
9.
LEGEND: 00
O
OR
PR
48
0
.0
1.
6.
PATH WAY
NI
18
40
00
1.
JU
5
9.
3
COVERED WALK 5.
18
OR
FENCE
00
(F
11
7.
4
E
9.
.2
0
UR
0
28
CT
13
RU
PERGOLA
NG
12
ST
DI
E
2.25
UR
0
IL
.0
1.24
BU
CT
18
RU
TREES
ST
0 0
RY
4. 4.
9.
65
64 40
COCONUT TREE
3.
2.
04
TA
.3
AY
PERIMETER FENCE
16
W
00
2.
10
16
7.
TH
FO 66
9.
NG
00
PA
3.
DI
E
EN
AY
UR
IL
L
W
CT
BU
CA
PROPERTY LINE
TH
R
RU
PA
14
ST
5
E
.5
UR
74
.4
EM
EL
10
CT
12
4.
RU
BUILDING 40 4.
ST
.2 64 2.
9
3
EM 6
85
DIR
3
8
0
EL
3.
E
7.
UR
62
K ED
CT
6.
EN
AL R
RU
PROPOSED STRUCTURES W OVE
ST
18
AY
78
.8
R
C
4
2.
20.22
TA
W
m
E
UR
FO
9
COVERED WALK
GH
CT
2
UR
0
STRUCTURES
RU
4.
RY
.3
CT
90
ST
9.
HI
RU
0
99
.2
ST
4
NG
12
KA
DI
6
IL
17
RE
BU
FLAGPOLE
LI
3.
CT
R
W
RU
AR
90
ST
4.
70
24
9.
5
AH
.0 7
3.
BENCH 0
53
M
3.
17
m
4.
50 GE
DIR SCHOOL DIRECTORY 3. NA
4
AI
6
10
7.
43
DR
2
AY
5.
3
.6
W
9.
NG
TH
10
SCHOOL CALENDAR 76 PA
DI
CAL
IL
2
BU
RE
TU
UC
78
R
ST AY
8.
WATER RESERVOIR
2.
W
WR 24 AT
H
0
P
0.
7
83
15
1
3.
7.
IN
4.
D
11 1.
IL
BU
95
26
5.
9.
80
08
06
1.
7.
1.
34
SCHOOL SITE DEVELOPMENT PLAN (PEQUIT INTEGRATED SCHOOL)
20
3.
6
2.
9
Name of School: Prepared by: Noted and Submitted by: Checked and Reviewed by: Recommending Approval: Approved: Date prepared:
ADDRESS: JOHN PAUL E. LLAUDER VIRGINIA A. ABADIANO MT-II ENGR. JOEKIM G. LEGUIDLIGUID CLARITA M. MENDA GORGONIO G. DIAZ, JR., Ph.D., CESO V MARCH 01, 2017
Graduating - Civil Engineering Student School Head Division Engineer III Chief-SGOD Schools Division Superintendent
Samar State Univeristy
Brgy. Pequit, Paranas Samar