PEQUIT

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

H

RT
NO
NORTH

UE
TR
m
0
.8
97

m
55
.
99

)
OL

0
D
HO

.0
18
HI SE

00
SC

9.
PO
GH

00
7.

9.
LEGEND: 00

O
OR
PR

48
0
.0

1.
6.
PATH WAY

NI

18
40

00
1.

JU
5

9.
3
COVERED WALK 5.
18

OR
FENCE

00
(F

11
7.

4
E
9.

.2
0

UR
0

28
CT

13
RU
PERGOLA

NG
12
ST

DI
E
2.25

UR
0

IL
.0

1.24

BU
CT
18

RU
TREES

ST
0 0

RY
4. 4.

9.

65
64 40
COCONUT TREE

3.
2.
04

TA
.3

AY
PERIMETER FENCE

16

W
00
2.

10
16
7.

TH
FO 66

9.

NG
00

PA
3.

DI
E

EN
AY
UR

IL

L
W
CT

BU

CA
PROPERTY LINE

TH
R

RU

PA

14
ST
5

E
.5

UR
74

.4
EM
EL

10

CT
12
4.

RU
BUILDING 40 4.

ST
.2 64 2.
9
3
EM 6

85
DIR
3

8
0

EL

3.
E
7.

UR
62
K ED

CT
6.
EN
AL R

RU
PROPOSED STRUCTURES W OVE

ST
18

AY
78
.8

R
C
4

2.
20.22
TA

W
m
E
UR

FO
9
COVERED WALK

GH
CT

2
UR

0
STRUCTURES

RU
4.
RY

.3
CT
90

ST

9.

HI
RU
0

99
.2

ST
4
NG

12

KA
DI

6
IL

17
RE
BU
FLAGPOLE

LI
3.
CT

R
W
RU

AR
90
ST
4.

70
24

9.
5

AH
.0 7

3.
BENCH 0

53

M
3.

17
m

4.
50 GE
DIR SCHOOL DIRECTORY 3. NA

4
AI

6
10

7.

43
DR

2
AY

5.
3

.6
W
9.

NG
TH

10
SCHOOL CALENDAR 76 PA

DI
CAL

IL
2

BU
RE
TU
UC

78
R
ST AY
8.
WATER RESERVOIR

2.
W
WR 24 AT
H

0
P
0.

7
83

15
1
3.

7.
IN
4.

D
11 1.

IL
BU
95

26
5.
9.

80
08

06
1.

7.
1.
34
SCHOOL SITE DEVELOPMENT PLAN (PEQUIT INTEGRATED SCHOOL)

20
3.
6

2.
9

SCALE: 1:900 MTS SCHOOL ID: 123925 / 313736

Name of School: Prepared by: Noted and Submitted by: Checked and Reviewed by: Recommending Approval: Approved: Date prepared:

PEQUIT INTEGRATED SCHOOL

ADDRESS: JOHN PAUL E. LLAUDER VIRGINIA A. ABADIANO MT-II ENGR. JOEKIM G. LEGUIDLIGUID CLARITA M. MENDA GORGONIO G. DIAZ, JR., Ph.D., CESO V MARCH 01, 2017
Graduating - Civil Engineering Student School Head Division Engineer III Chief-SGOD Schools Division Superintendent
Samar State Univeristy
Brgy. Pequit, Paranas Samar

You might also like