Standards Report: Ieee / Pes /transformers Committee
Standards Report: Ieee / Pes /transformers Committee
Standards Report
To: Members of IEEE Transformers Committee Mar 12, 2014
From: William H. Bartley, Standards Coordinator
Executive Summary
This report covers the Transformers Committee Standards activity for the 5 month period from
October 1, 2013 to March 1, 2014. In the last five months, no new Standards, three Revisions and
one Corrigenda were approved by Standards Board. In this same period, the Standards Board
approved one PAR for a new standard; two PAR modifications and one PAR Extension.
In this Report:
I. Standards approved ......................................pg 1
II. PARs approved ..............................................pg 2
III. Standards Board 2014 Meeting Schedule ........pg 2-3
IV. Transformers Committee Ballot & PAR Status . pg 4-6
V. Transformer PARs due to expire in 2014 .........pg 7
VI. Transformer Stds Status database ..................pg 8- 22
VII. Transformer Stds Org Chart ..........................pg 23-24
CORRIGENDA approved:
C57.12.10 –Corrigenda 2 Std Requirements for Liquid Immersed Power Transformers -
Corrigendum 2: Correction of A.3.2.13 (Note: A Corrigenda does not affect Expiration. This standard
expires Sept 30, 2020 !)
The following Balloted REVISIONS have been submitted and are on March 2014 REVCOM agenda
PC57.12.44 Revision of "Standard Requirements for Secondary Network Protectors" submitted William
Wimmer
PC57.116, Revision of “Guide for Transformers Directly Connected to Generators” submitted by Gary
Hoffman
- Page 1 of 24-
II. PARs approved since Oct 1, 2014
PARs for New Standards and Revisions
PC57.13.8 Standard Requirements for Station Service Voltage Transformers (new)
PC57.637 Guide for the Reclamation of Mineral Insulating Oil and Criteria for Its Use
Following PARs have been submitted and are on March 2014 NESCOM Agenda
PAR for New Standard: PC57.163, Guide for Establishing Power Transformer Capability while under
Geomagnetic Disturbances, Submitted by Jane Verner
PAR for Revision: C57.15 Standard Requirements, Terminology, and Test Code for Distribution
Overhead and Substation Step-Voltage Regulators, Submitted by Craig Colopy
PAR Modification: P1276, Guide for the Application of High-Temperature Insulation Materials in Liquid-
Immersed Distribution, Power and Regulating Transformers, Submitted by Mike Franchek
PAR Extension, C57.19.01 Standard Performance Characteristics and Dimensions for Outdoor
Apparatus Bushings, Submitted by Shibao Zhang
Page 5 of 24
Approval PAR Ballot Close
PAR Number Project Type Title Status
Date Expiration Date
Performance Characteristics
P60076-16 New Standard Requirements for Wind Turbine Generator Transformers 8-Jun-2012 31-Dec-2016 WG Draft Development
Standard Requirements, Terminology, and Test Procedures for Neutral
PC57.32 Revision 7-Dec-2011 31-Dec-2015 WG Draft Development
Grounding Devices
PC57.120 Revision Guide for Loss Evaluation of Dist and Power Transformers and Reactors 25-Mar-2010 31-Dec-2014 WG Draft Development
Guide for Sound Level Abatement and Determination for Liquid-Immersed
Page 6 of 24
Std for Network, 3ph Transformers, <3750 kVA, HV < 34 500, LV < 600v;
PC57.12.40 Revision 30-Aug-2012 31-Dec-2016 WG Draft Development
Subway and Vault Types (Liquid Immersed)
PC57.12.44 Revision Standard Requirements for Secondary Network Protectors 17-Jun-2010 31-Dec-2014 On RevCom Agenda Mar-2014
IV. PARS DUE TO EXPIRE DEC 2014 (as of March 1, 2014)
SC Chairs and WG Chairs Please Take Note: Submission Deadline is October 20th.
If the completed ballots will not be submitted to RevCom by the Oct 20 deadline for the December
Standards Board meeting, you must request an extension for the project (PAR). Extension requests are
usually granted from one to two years. Significant justification must be provided for an extension request
that exceeds two years.
If there is no response to this notification by the 20 October 2014, the NesCom Administrator will
recommend an administrative withdrawal at the December 2014 Standards Board meeting.
STANDARD Working Group Chair Pub Year PAR Issue Dat Standard Status
TITLE Phone Rev Due Dat
PROJECT PAR Expiration Remark
Email
SubCommittee BUSHING (417) 345-5926
Guide for Distribution Transformer Loss Evaluation Pekarek T. J. PAR WITHDRAWN - Inactive WG
(330) 761-7800 Decision made at Las Vegas Meeting to discontinue this
PC57.12.33
tjpekarek@firstenergycorp.com activity.
Standard Requirements for Distribution Gaytan C. 2/6/2012 New Project
Transformer Tank Pressure Coordination (52) 818 03022 133 12/31/2016
PC57.12.39
carlos.gaytan.cavazos@indsys.ge.com
C57.12.20 Standard for Overhead Type Distribution Traut A. 2011 6/8/2012 Approved Standard with approved PAR for Revision
Transformers, 500 kVA and Smaller, High-Voltage 706-548-3121 6/16/2021 12/31/2016
PC57.12.20 PAR for Revision approved June 2012
34 500 Volts and Below; Low-Voltage, 7970/13
atraut@ieee.org
800 Y Volts and Below
C57.12.28 Standard for Pad Mounted Equipment - Enclosure Olen R. 2005 9/30/2010 Approved
Integrity 414-837-8365 12/31/2018 12/31/2014
PC57.12.28 Previously NEMA/ANSI C57.12.28‐1999
robertcolen3@eaton.com Published 9/30/2005
PAR for Revision approved by NESCOM Sept 2010
C57.12.29 Standard for Pad Mounted Equipment - Enclosure Olen R. 2005 9/30/2010 Approved
Integrity for Coastal Environments 414-837-8365 12/31/2018 12/31/2014
PC57.12.29 Previously NEMA/ANSI C57.12.29‐1991
robertcolen3@eaton.com Current standards Published 10/10/2005.
PAR for Revision approved by NESCOM Sept 2010
C57.12.30 Std for Pole-Mounted Eqpt - Enclosures for Coastal Olen R. Approved new standard
Environment 414-837-8365 6/17/2020 new standard approved June 2010
robertcolen3@eaton.com
C57.12.31 IEEE Standard for Pole Mounted Equipment - Olen R. 2002 3/6/2013 Approved with PAR for Corrigenda
Enclosure Integrity 414-837-8365 6/17/2020 12/31/2017
PC57.12.31 Published 3/6/2003. New PAR approved 3/22/2007
robertcolen3@eaton.com Std Bd approved 6/17/2010
PAR for Corrigenda approved to correct SCAB corrosion test
C57.12.32 Standard for Submersible Equipment - Enclosure Olen R. 2002 Approved
Integrity 414-837-8365 12/31/2018 Published 3/7/2003.
robertcolen3@eaton.com Reaffirmation approved Mar 2008
C57.12.34 Requirements for Pad-Mounted, Compartmental- Shull S. 3/31/2011 Approved + PAR for Revision
Type, Self-Cooled, Three-Phase (417) 625-6110 12/9/2019 12/31/2015
PC57.12.34 Originally Std. 1447, Combined C57.22‐1980 & C57.12.26‐
DistributionTransformers, 2500 kVA and Smaller:
sshull@empiredistrict.com 1992
High-Voltage, 34 500GrdY/19 920 Volts and
Revised Standard approved Dec09
Below; Low Voltage, 480 Volts and Below
Mar '11: Nescom approved new PAR for Revision
C57.12.35 IEEE Standard for Bar Coding for Distribution Matthews P 2007 6/17/2010 Approved
Transformers (601) 422-1533 12/31/2018 12/31/2014
PC57.12.35 Formally P1265.
lmatthews@howard-ind.com PAR for Revision approved June 2010
C57.12.36 Standard Requirements for Liquid-Immersed Murphy J.R. 2007 12/7/2011 Approved std and approved PAR for Revision
Distribution Substation Transformers (407) 824-4194 12/31/2018 12/31/2015
PC57.12.36 approved by SA Board on 9/27/2007
jerry.murphy@ieee.org PAR for Revision approved Dec '11
Prepared by W. Bartley, Transformers Standards Coordinator Page 10 of 24 March 12, 2014
STANDARD Working Group Chair Pub Year PAR Issue Dat Standard Status
TITLE Phone Rev Due Dat
PROJECT PAR Expiration Remark
Email
SubCommittee DISTRIBUTION TRANSFORMERS (417) 625-6110
C57.12.37 IEEE Standard for the Electronic Reporting of Crotty J.W. 2006 12/7/2011 Approved with PAR for Revision
Transformer Test Data 573 659 6265 12/31/2018 12/31/2015
PC57.12.37 Formally C57.132, IEEE Std 1388‐2000 D11d approved by SA
john.w.crotty@us.abb.com Board on 3/30/2006.
Published 7/21/2006. New PAR for Revision submitted
Sept'11 ‐approved Dec'11
C57.12.38 Standard for Pad-Mounted, Compartmental-Type, Ghafourian A. A. 2009 3/24/2010 Approved - revision in progress
Self-Cooled, Single-Phase Distribution (731) 285-9121 9/11/2019 12/31/2014
PC57.12.38 This std replaces C57.12.21 & C57.12.25
Transformers with Separable Insulated High-
aghafourian@ermco-eci.com Std published Nov 30 2009
Voltage Connectors; High Voltage, 34500
PAR for Revision approved by Nescom Mar‐2010
GrdY/19920 Volts and Below, Low Voltage,
240/120 Volts; 167 kVA and SmallerRequirements
C57.15 IEEE Standard Requirements, Terminology, and Colopy C. A. 1999 Approved
Test Code for Step-Voltage Regulators (262) 896-2342 9/11/2019
PC57.15 Also known as 60076‐21‐2011
ccolopy@cooperpower.com PAR for Revision is on March 2014 NesCom agenda
C57.12.01 IEEE Standard General Requirements for Dry- Holdway T. 2005 12/9/2009 Approved with PAR
Type Distribution and Power Transformers 12/31/2018 12/31/2015
PC57.12.01 Previous 1998 version was successfully revised and
Including Those with Solid Cast and/or Resin
approved in 2005.
Encapsulated Windings
Published 5/19/2006 PAR for Revision approved Dec 09.
PAR extension approved March 2013; extending PAR to Dec
2015
Ballot Invitation opened Aug 16
C57.12.51 Ventilated Dry-Type Power Transformers, 501 kVA Powell P. A. Approved
and Large, Three-Phase, with High-Voltage 601 to (202) 388-2335 12/31/2018 Previously NEMA document C57.12.51, original publication
34500 Volts; Low-Voltage 208Y/120 to 4160
papayne@ieee.org by NEMA in 1981, Reaffirmed in 1998. This document was
Volts - General Requirements
transferred to IEEE in Dec., 2002.
Approved by SA Sept 2008
C57.12.52 Standard Requirements for Sealed Dry-Type Kennedy S. P. 1981 Approved
Power Transformers, 501 kVA and Larger, Three- (716) 896-6500 12/31/2022 Previously ANSI C57.12.52‐1981
Phase, with High-Voltage 601 to 34 500 Volts,
skennedy@niagaratransformer.com SA approved Dec 2012
Low-Voltage 208Y/120 to 4160 Volts
C57.12.58 IEEE Guide for Conducting a Transient Voltage Kline A. D. 1991 Approved - Active
Analysis of a Dry-Type Transformer Coil (843) 705-2698 12/31/2018 Reaffirmed Sept 2008
AKLINE1490@AOL.COM
C57.12.59 IEEE Guide for Dry-Type Transformer Through- Powell P. A. 2001 12/7/2011 Approved
Fault Current Duration (202) 388-2335 12/31/2018 12/31/2015
PC57.12.59 Reaffirmation approved in 12/5/2006.
papayne@ieee.org PAR for Revision submitted Oct'11 and approved by Std Bd
Dec'11
C57.12.60 IEEE Guide for Test Procedures for Thermal Wicks R. C. 1998 Approved with Corrigenda
Evaluation of Insulation Systems for Solid Cast (804) 383-3300 11/9/2019 IEEE Std C57.12.56‐1986 and IEEE Std C57.12.60‐1998
and Resin-Encapsulated Power and Distribution
roger.c.wicks@usa.dupont.com merged together in 2009
Transformers
Corrigenda 1 approved by SA June 2013
C57.12.91 IEEE Standard Test Code for Dry-Type Distribution Foster D. R. 2001 Approved
and Power Transformers (815) 678-2421 12/31/2021
dfoster@olsun.com
C57.124 IEEE Recommended Practice for the Detection of Johnson, Jr. C. W. 1991 Approved
Partial Discharge and the Measurement of (276) 688-1512 12/9/2019 Reaffirmed Dec09
Apparent Charge in Dry-Type Transformers
charles.w.johnson@us.abb.com
C57.134 IEEE Guide for Determination of Hottest Spot Powell P. A. 2000 12/7/2011 Approved
Temperature in Dry Type Transformers (202) 388-2335 12/31/2023 12/31/2015 Reaffirmation approved 3/30/2006
papayne@ieee.org PAR for Revision approved Dec'11
Std apprroved by SASB Dec 11 2013
C57.16 IEEE Standard Requirements, Terminology, and Dudley R. F. 1996 Approved
Test Code for Dry-Type Air- Core Series- (416) 298-8108 12/31/2021
PC57.16 Revision approved by Std Bd Sept 2011
Connected Reactors
richardd@ca.trenchgroup.com
C57.94 IEEE Recommended Practice for Installation, Stankes S 1982 12/9/2011 Approved
Application, Operation, and Maintenance of Dry- (603) 545-3026 12/31/2018 12/31/2015
PC57.94 Reaffirmation approved by the SA Board on 12/6/2006
Type General Purpose Distribution and Power
PAR for Revision approved Dec'11
Transformers
C57.96 IEEE Guide for Loading Dry Type Distribution and Marek R. P. 1999 12/9/2009 Approved - Active
Power Transformers (804) 383-2376 12/31/2023 12/31/2013
PC57.96 RevCom approved reaffirmation on 9/22/2004
Richard.P.Marek@usa.dupont.com Previous revision in 1994. PAR for Revision approved Dec
2009
Ballot completed and on Dec2013 Revcom agenda.
Approved by SASB Dec11 2013
IEEE 259 IEEE Standard Test Procedure for Evaluation of Stankes S 1999 Approved
Systems of Insulation for Dry-Type Specialty and (603) 545-3026 3/25/2020 9/22/04 ‐ RevCom approved reaffirmation
General-Purpose Transformers
Reaffirmed March 2010
C57.129 IEEE General Requirements and Test Code for Oil Dudley R. F. 2007 Approved
Immersed HVDC Converter Transformers (416) 298-8108 12/31/2018 Trial use std published 6/6/2000; upgraded to full use 3/2002
richardd@ca.trenchgroup.com Approved by SA Board 9/27/2007
IEEE 1277 IEEE General Requirements and Test Code for Dry- Dudley R. F. 2000 Approved.
Type and Oil-Immersed Smoothing Reactors for (416) 298-8108 12/31/2020 Ballot approved March 2010
DC Power Transmission
richardd@ca.trenchgroup.com
Standard Requirements for Station Service VTs Wallace 12/11/2013 New Project
12/31/2017 PAR approved Dec13 SB
PC57.13.8
david.wallace@us.abb.com
C57.13 IEEE Standard Requirements for Instrument McTaggart R. 2008 9/30/2010 Approved - Active PAR for Corrigenda
Transformers (416) 751-8570 12/31/2018 12/31/2014
PC57.13 PAR to Revise IEEE Std C57.13‐2008 submitted to NESCOM
rossdm@ca.trenchgroup.com PAR for Corrigenda to Correct Fig 3 approved Sept 2010
C57.13.2 Conformance Test Procedure for Instrument Smith J. E. 2005 Approved
Transformers (601) 346-9104 6/17/2020 PAR to Revise Std C57.13.2‐1991; harmonize with C57.13‐
jes1@ieee.org 1993
D4 approved by RevCom on 6/8/2005; Published 9/29/2005.
Reaffirmed 6/17/2010
C57.13.5 Standard of Performance and Test Requirements Riffon P. 2006 Approved
for Instrument Transformers of a Nominal System (514) 840-3000 x3424 9/11/2019
PC57.13.5 Reference Std. 1400
Voltage of 115 kV and Above
riffon.pierre@hydro.qc.ca Previously C57.13.5 was a trial use
Upgraded to Full Use 3/30/2006
C57.13.6 Standard for High Accuracy Instrument Smith J. E. Approved
Transformers (601) 346-9104 6/17/2020 Document published in 12/9/2005
jes1@ieee.org Reaffiremed 2010
IEEE Trial-Use Guide for the Use of Dissolved Gas Thompson J. A. 6/16/2010 New Project
Analysis During Factory Temeprature Rise Tests 605-534-3571 12/31/2014
PC57.130 New Project ‐ Std under development ‐ currently under
for the Evaluation of Oil-Immersed Transformers
serve1@svtv.com ballot resolution.
and Reactors
PAR extension requested and approved to 12/31/2007.
New PAR approved June 2010
PAR Modification approved Dec 2013
DGA Guide for Esters filled Transformers Boman P.E. 3/24/2010 New Project
(785)256-7161 12/31/2014 PAR approved by NESCOM ‐ March‐2010
PC57.155
paul_boman@hsb.com Ballot Invitation Opened Aug 15, 2013
C57.104 IEEE Guide for the Interpretation of Gases Ladroga R. K. 1991 1/9/2010 Active + New PAR for Revision
Generated in Oil-Immersed Transformers 978 410 5507 12/31/2018 12/31/2014
PC57.104 PAR to Revise IEEE Std C57.104‐1991
richard.ladroga@rmiengineers.com Original PAR and document withdrawn in Dec. 2005.
New PAR approved in June, 2006.
New PAR approved Jan 2010
C57.106 IEEE Guide for Acceptance and Maintenance of Rasor B. 2006 11/9/2011 Approved Standard
Insulating Oil in Equipment 12/31/2018 12/7/2016
PC57.106 PAR for Revision approved Dec'11
Bob.Rasor@sdmyers.com
C57.111 IEEE Guide for Acceptance of Silicone Insulating Boman P.E. 1983 Approved
Fluid and Its Maintenance in Transformers (785)256-7161 3/19/2019
paul_boman@hsb.com
C57.121 IEEE Guide for Acceptance and Maintenance of Sundin 1998 Approved
Less-Flammable Hydrocarbon Fluid in 903 231 3141 12/9/2019 Was to be administratively withdrawn in Dec., 2004
Transformers
dsundin@svbchemicals.com Reaffirmation ballot pool invitation initiated in October,
2005.
Reaffirmed Dec 2009
C57.139 Guide for Dissolved Gas Analysis in Transformer Wallach D.J. 2010 6/16/2011 Approved
Load Tap Changers (980) 373-4167 12/8/2020 12/31/2015
PC57.139 PC57.139 was approved as a new standard by IEEE‐SA Dec 8,
david.wallach@duke-energy.com 2010
PAR for revision approved June 2011
C57.146 Guide for Interpretation of Gasses Generated in Murphy J.R. 2005 Approved
Silicone-Immersed Transformers (407) 824-4194 6/16/2021 Reaff approved 16‐June‐11.
jerry.murphy@ieee.org
C57.147 Guide for Acceptance and Maintenance of Natural McShane C. P. 2/6/2012 Active with active PAR for Revision
Ester Fluids in Transformers 262 366 1091 12/31/2018 12/31/2016
PC57.147 New Standard approved May 2008
patrick_mcshane@cargill.com
IEEE 637 IEEE Guide for the Reclamation of Insulating Oil Thompson J. A. 1985 12/10/2008 Approved - Reaffirmed
and Criteria for Its Use 605-534-3571 12/31/2018 12/31/2014
PC57.637 Reaffirmation approved by SA Board 9/27/2007
serve1@svtv.com PAR for Revision approved Dec 2008
PAR extension approved June 2012, until Dec 2014
PAR modification approved Dec 2013
Guide for the Definition of Thermal Duplicate Beaster B. L. 0 PAR WITHDRAWN Dec 2004
Liquid-Immersed Distribution, Power, and (601) 422-1302
PC57.145 Previously P1524
Regulating Transformers
blbeaster@ieee.org Modified PAR to expire in 2004
PAR administratively withdrawn in December, 2004
Guide for Interpretation of Moisture in Prevost T. A. 8/23/2013 New Project
Transformers 781-672-6219 12/31/2017
PC57.162
tprevost@ieee.org
C57.100 IEEE Standard Test Procedure for Thermal Wicks R. C. 1999 Approved Standard
Evaluation of Liquid-Immersed Distribution and (804) 383-3300 12/31/2021 Requested PAR for revision on 10/18/2004.
Power Transformers
roger.c.wicks@usa.dupont.com 1st Ballot ‐2010; 1st Recirc Sept 2011; 2nd Recirc closed 20‐
Oct'2011
APPROVED Dec 2011
C57.119 IEEE Recommended Practice for Performing Tuli S. C. 2001 Approved
Temperature Rise Tests on Oil Immersed Power 414 477 6669 12/31/2018 Previously IEEE 838. Published 3/12/2002.
Transformers at Loads Beyond Nameplate Ratings
subhash.tuli@ieee.org Reaffirmed Mar 2008
C57.154 Design, Testing and App of Liquid-Immersed Marek R. P. 2012 3/19/2009 New Standard
Transformers with High-Temp Insulation (804) 383-2376 12/31/2022 12/31/2013
PC57.154 PAR for new standard approved March 2009
Richard.P.Marek@usa.dupont.com Standard Bd approved Aug 30, 2012
C57.91 IEEE Guide for Loading Mineral-Oil-Immersed Duckett D. A. 1995 Approved
Transformers (407) 942-9401 12/31/2021 Combined from C57.91‐1981 & C57.92‐1981 & C57.115‐1991
don.duckett@pgnmail.com
IEEE 1276 IEEE Guide for the Application of High- Franchek M. A. 1997 2/6/2012 Approved with active PAR for Revision
Temperature Insulation Materials in Liquid- (802) 751-3539 12/31/2018 12/31/2016
P1276 Upgrade from trial use to full use on 3/30/2000
Immersed Power Transformers
michael.franchek@wicor.com Reaffirmation approved by SA Board in 3/30/2006
PAR for Revision submitted Oct'11 and approved by Std Bd
Feb 2012
PAR Mod submitted to Nescom Feb 2014
IEEE 1538 IEEE Guide for Determination of Maximum Forsyth B. I. 2000 Approved
Winding Temperature Rise in Liquid Filled 405-622-8816 12/31/2021 Original approval in 2000. Reaffirmed in 2005. Reaffirmed
Transformer
bruce.forsyth@ieee.org again in Dec 2011
Standard Requirements for Wind Turbine Buckmaster D.E. 6/8/2012 Approved PAR
Generator Transformers 980-321-8381 12/31/2016
P60076-16 PAR approved June 2012
david.buckmaster@shawgrp.com This is an IEC Joint development
Guide for Short-Circuit Testing of Distribution and Fortin M. PAR WITHDRAWN
Power Transformers 450-922-0925
PC57.133 This PAR was withdrawn by consensus of PCSC.
fortin.marcel@ieee.org Proposed contents are reportedly addressed in C57.12.90.
Guide for the Application of Tertiary and Betancourt E. 5/15/2012 Approved PAR
Stabilizing Windings in Power Transformers (52-80)-30-2135 12/31/2016
PC57.158
enrique.betancourt.ramirez@indsys.ge.c
Guide for Application in Distributed Photovoltaic Shertukde H.M. 6/8/2012 Approved PAR
(DPV) Transformers in Power Generation Systems (860) 768-4847 12/31/2016
PC57.159
shertukde@mail.hartford.edu
C57.105 IEEE Guide for Application of Transformer 1978 Approved
Connections in Three-Phase Distribution Systems 12/31/2018 Was to be administratively withdrawn in Dec., 2004.
Request extension to 2006.
Reaffirmation ballot pool invitation initiated in October,
2005.
Reaffirmed 2008
C57.109 IEEE Guide for Liquid-Immersed Transformers Patel B. K. 1993 Approved
Through-Fault-Current Duration (205) 987-8012 12/31/2018 Reaffirmation ballot pool invitation initiated in October,
bkpatel8012@charter.net 2005.
Reaffirmed Mar 2008
C57.110 IEEE Recommended Practice for Establishing Marek R. P. 1998 Approved
Transformer Capability When Supplying (804) 383-2376 12/31/2018 PAR approved 11/18/2004.
Nonsinusoidal Load Currents
Richard.P.Marek@usa.dupont.com Approved by SA Mar 2008
C57.120 IEEE Loss Evaluation Guide for Power Traut A. 1991 3/24/2010 Approved - revision in progress
Transformers and Reactors 706-548-3121 12/31/2018 12/31/2014
PC57.120 Reaffirmation approved by RevCom 6/8/2006.
atraut@ieee.org PAR for Revision submitted 1/21/2010 to merge C57.120 &
C57.12.33
C57.123 IEEE Guide for Transformer Loss Measurement TeNyenhuis E.G. 2002 Approved std
(519) 837-4691 6/17/2020 Ref Std. IEEE 1098
ed.g.tenyenhuis@ca.abb.com Revision approved June 2010
C57.136 IEEE Guide for Sound Level Abatement and Antosz S. 2000 9/30/2010 Approved + Active PAR for Revision
Determination for Liquid- Immersed Power (412) 498-3916 12/31/2018 12/31/2014
PC57.136 Reaffirmation approved by RevCom on 9/21/2005
Transformers and Shunt Reactors Rated Over 500
santosz@comcast.net PAR for Revision approved by NESCOM Sept 2010
kVA
C57.142 A Guide To Describe The Occurrence And Degeneff R. C. 2010 Approved
Mitigation Of Switching Transients Induced By (518) 276-6367 12/8/2020
PC57.142 PC57.142 was approved as a new standard on December 8,
Transformer-Breaker Interaction
degenr@rpi.edu 2010
Prepared by W. Bartley, Transformers Standards Coordinator Page 17 of 24 March 12, 2014
STANDARD Working Group Chair Pub Year PAR Issue Dat Standard Status
TITLE Phone Rev Due Dat
PROJECT PAR Expiration Remark
Email
SubCommittee PERFORMANCE CHARACTERISTICS (519) 837-4691
c57.149 Guide for the Application and Interpretation of Sweetser C.L. 2012 6/24/2004 APPROVED
Frequency Response Analysis for Oil Immersed (781) 672-6214 12/31/2022 12/31/2012
Transformers
<charles.sweetser@omicronusa.com>
C57.18.10 IEEE Standard Practices and Requirements for Kennedy S. P. 1998 Approved
Semiconductor Power Rectifier Transformers (716) 896-6500 1/30/2019 Replaced the C57.18‐1964 for pool cathode mercury‐arc
skennedy@niagaratransformer.com rectifiers.
Amendment 1: Technical and Editorial Corrections was
approved 3/27/08
Reaffirmed March 2009
C57.21 IEEE Standard Requirements, Terminology, and 1990 Approved
Test Code for Shunt Reactors Rated Over 500 kVA 12/31/2018 Reaffirmation approved on 6/23/2004.
Revised Std approved Mar 2008
IEEE 32 IEEE Standard Requirements, Terminology, and Kennedy S. P. 1972 12/7/2011 Approved - Active PAR to revise std
Testing Procedures for Neutral Grounding Devices (716) 896-6500 12/31/2018 12/31/2015
PC57.32 Dec. 2002 ‐ Sponsor changed from PES/SPD to PES/TR; PAR
skennedy@niagaratransformer.com Modified and extended to Dec 2011; PAR stalled Oct'11,
without a ballot.
PAR withdrawn & New PAR submitted Oct'11, approved by
Stds Bd Dec '11
C57.135 IEEE Guide for the Application, Specification and Sim H. J. 2001 Approved
Testing of Phase- Shifting Transformers (919) 580-3234 6/16/2021
PC57.135 Approved for IEEE/IEC Dual Logo Dec. 2005 ‐ IEC 62032 Ed. 1
jin.sim@ieee.org
C57.140 Evaluation and Reconditioning of Liquid Immersed James R.I. 2006 3/31/2011 Approved
Power Transformers (504) 576-6246 12/31/2018 12/31/2015
PC57.140 D18 approved by RevCom 11/16/2006
r.james@ieee.org Mar '11: Nescom approved new PAR until Dec31 2015
C57.143 Guide for Application for Monitoring Equipment to Chu D. Approved
Liquid-Immersed Transformers and Components (212) 460-3456 12/31/2023
chud@coned.com
C57.148 Standard for Control Cabinets for Power Watson J.D. 2011 Approved Standard
Transformers 561 371 9138 9/10/2021 Approved by Std Bd Sept 2011
joe_watson@ieee.org
C57.150 Guide for the Transportation of Large Power Anderson G. W. 2012 Approved
Transformers and Reactors (402) 680-1111 12/31/2022
gwanderson@ieee.org
C57.17 Standard Requirements for Arc Furnace Ganser R. Approved
Transformers (330) 492-8433 12/31/2022 ANSI issued the original C57.17 standard in 1965.
rganser@aol.com
C57.93 IEEE Guide for Installation of Liquid-Immersed Lau M. Y. 1995 3/29/2012 Approved Standard - with approved PAR for Revision
Power Transformers (604) 528-3201 12/31/2018 12/31/2016
PC57.93 Rev of ASA C57.93‐1958, IEEE Std C57.12.11‐1980, &
mike.lau@bchydro.bc.ca C57.12.12‐1980
PAR to Revise IEEE Std C57.93‐1995 Approved by RevCom
12/2007
PAR for Revision was approved March 2012
IEEE 638 IEEE Standard for Qualification of Class 1E Swinderman C. 1992 6/7/2007 Approved - Active
Transformers for Nuclear Power Generating (724) 778-5234 12/31/2023 12/31/2013
P638 Reaffirmation approved by SA Board 3/30/2006.
Stations
craig.swinderman@meppi.mea.com New PAR for revision approved 6/7/2007. PAR extended
until Dec 2012. PAR extended until Dec 2013.
Standard approved by SASB Dec 11 2013
C57.12.23 IEEE Standard for Underground Type, Self-Cooled, Traut A. 2009 Approved
Single-Phase Distribution Transformers with 706-548-3121 3/19/2019 Published 4/20/2009
Separable Insulated High-Voltage Connectors;
atraut@ieee.org
High Voltage 25kV and Below; Low Voltage 600V
and Below
C57.12.24 Requirements for Transformers - Underground- Termini G. 2000 11/9/2011 Approved standard
Type, Three Phase Distribution Transformers: (610) 941-1524 6/17/2019 12/31/2015
PC57.12.24 New PAR for Revision approved Nov '11
High Voltage (34 500 GrdY/19 920 V and Below)
giuseppe.termini@peco-energy.com
and Low Voltage (480V and Below, 2500 kVA and
Smaller
C57.12.40 Standard for Requirements for Secondary Network Klaponski B. 2011 8/30/2012 Approved Standard with approved PAR for Revision
Transformers - Subway and Vault Types (Liquid (204) 633-7220 12/31/2021 12/31/2016
PC57.12.40 Approved ‐ C57.12.40‐2011
Immersed)
brian.klaponski@carte.ca
C57.12.44 IEEE Standard Requirements for Secondary Wimmer W. G. 2005 6/17/2010 Approved
Network Protectors (804) 771-4225 12/31/2018 12/31/2014
PC57.12.44 PC57.12.44/D2.1 approved by RevCom in December 2005.
bill_wimmer@dom.com Published 6/07/2006
PAR for Revision approved June 2010
Std submitted to Revcom Jan 2014 and on March agenda
C57.12.57 Requirements for Ventilated Dry-Type Network Robinson A. L. 1992 Standard WITHDRAWN in 2001
Transformers 2500 kVA and Below, Three-Phase (361) 289-4001 12/31/2000 Existing standard withdrawn by IEEE on 1/15/2001. No
with High Voltage 34 500 Voltas and Below, Low
alrobinson@aep.com longer endorsed by IEEE.
Voltage 216Y/125 and 480Y/125 Volts
OH Dist. Xfmrs
Gen. Req. of Bushings General Req. Req. & Test Code for Std Requirements Guide for Phase-Shift
C57.12.20 UG Self-Cool 1-ph
Rev of C57.19.00 C57.12.01 HVDC Smoothing Phase Shifters Xfmrs
Req for Inst. Xfmrs C57.12.23
Reactors IEEE 1277 P60076-57-1202 C57.135
C57.13
Performance
Dry Type Air-Core UG 3ph Dist Xfmr Req. for L.I. Power
Characteristics Req. for 3ph Pad Mount Req. & Test Code for Guide for Paralleling
Reactors < 2500KVA Xfmrs C57.12.10
C57.19.01 C57.12.34 Test Proc. For Inst. HVDC Con. Xfmr C57.153
C57.16 C57.12.24
Xfmrs C57.129
C57.13.2
Req. & Testing of DC Std. Req. for Sec.
Bushings Dist. Sub. Xfmrs Req.for Vent. Network Xfmrs Failure Investigations Directly Connected
C57.19.03 C57.12.36 <=500KVA Test Req. for >= 115kV C57.12.40 C57.125 GSU C57.116
C57.12.50 PC57.13.5
DIELECTRIC TEST Performance Characteristics Insulating Fluids Insulation Life Standards Meetings
Mike Franchek Ed teNyenhuis Dave Wallach Bruce Forsyth Wm. Bartley Greg Anderson
Rev of Transient
Semicon Rectifier Xfmrs Req. & Test Code for Mineral Oil Thermal Eval Test Educational
Voltage Test Cont. Rev of C57.12.90
C57.18.10 Shunt Reactors C57.106 C57.100 Development
P. Riffon/P. Heinzig S. Antosz
S. Kennedy >500kVA C57.21 R. Wickes T. Prevost
Silicone Oil
Rev of Low Freq. Tests C57.111
App. Guide for Xfmr Through-Fault Current Temp Rise Test Above Terminal Markings & Committee
B. Poulin
Connections Duration C57.109 NP Rating Connections History
C57.105 Less Fammmable C57.119 S. Schull C57.12.70 P. Balma
H-C Fluid C57.121
PD Measurement
D. Sundin Terminology
On Bushings & Inst Tx Non-Sinusoidal Load Xfmr Loss TF Investigate Use of
B. Poulin Current C57.110 Measurement Furan Testing C57.12.80
R. Marek C57.123 DGA During Thermal S. Xu B. Chiu
Test C57.130
Guide for Acoustic PD J. Thompson
C57.127 Mitigation of Switching IEEE /IEC Cross Metric Conversion
Short Circuit Testing Max. Wdg Temp Rise
D. Gross Transients CB/Xfmr Reference TF C57.144
PC57.133 DGA in LTC IEEE 1538
Interaction C57.142 V. Mehrotra P. Balma
C57.139
WG on Dielectric D. Wallach Diagnostic Field Testing
Neutral Grounding Guide to Freq App. Of High Temp TF – Fluid terminology
Test Table J. Verner
Devices PC57.32 Response Analysis Insulation IEEE 1276 consistency
P. Hopkinson App Guide for Ester IEEE C57.152 /(62)
S. Kennedy C57.149 M. Franchek P. McShane
Fluids -C57.147
P. McShane
WG- External Dielectric
Test Clearance Tertiary & Stabilizing DGA in Silicone WG – Std Req. Hi Temp TF - Temp Rise Test -
Sound Level Abatement
Eric Davis Windings PC57.158 C57.146 Insulation C57.154 C57.12.90, Clause 11
C57.136
E. Betancourt J. Murphy R. Marek P. Powell
Windfarm Transformers DPV Grid Transformers DGA in Ester Fluids Oil Reclamation Moisture in Insulation
P60076-16 PC57.159 PC57.155 IEEE 637 PC57.162
D. Buckmaster H. Shertukde P. Boman J. Thompson T. Prevost
Revised by W. Bartley Page 24 of 24