GOVERNMENT OF ANDHRA PRADESH

ROADS & BUILDINGS DEPARTMENT

NAME OF WORK:- Construction of Phylon on Khammam-


Bonakal Road

AMOUNT OF ESTIMATE : 1.00 Laks

(R&B)SECTION : MADHIRA

(R&B)SUB-DIVISION : MADHIRA

(R&B)DIVISION : KHAMMAM
Specification report accompanying the estimate for the work of
Construction of Phylon on Khammam-Bonakal Road
Amount of Estimate:- Rs. 1.00 Lakhs
Authority:- As per the instructions of higher authorities.
Necessity:-

Provisions:-
1 Earth work excavation for foundations and depositing at site with initial lead of
10 mts and 2 mts
2 Filling foundations and basement with sand from approved quarry,including
cost and conveyance of all materials
3 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent
to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate)
using 40mm size Hard Blasted Granite (IS383, 1970)
4 Brick Masonry in superstructure with CM (1:8) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm.
5 Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials
6 Water proof cement paint two coats with super snowcem decorative paint 1st
grade of approved colour make and shade after surface is thoroughly cleaned
including cost and conveyance of all materials
7 Forming embankment with borrowed useful earth from outside road boundary
with 5 Km extra lead by mechanical means upto SDR with all leads and lifts
including pre-watering of soil at borrow area
Engaging special labour for cleaning the ground debries and cutting of light
8 jungle.
9 Supply and Fixing of Tablet Stone
10 Supply and Fixing of 36'x18' ShamiynasStone
11 Supply of Plastic Chairs
12 Supply and Fixing of Carpet

RATES:- The rates adopted are as per SSR 2012-13.

Assistant Exe Engineer, Dy. Executive Engineer,


(R&B) Section :: Madhira (R&B) Sub Division :: Madhira
Executive Engineer, Superintending Engineer,
(R&B) Division :: Khammam (R&B) Circle :: Khammam
:: DETAILED-CUM-ABSTRACT ESTIMATE ::

N.W:-Construction of Phylon on Khammam-Bonakal Road


Sl.
Description of item Nos. L B D Qty. Rate/Per
No. Amount
1 2 3 4 5 6 7 8 9
1 Earth work excavation for foundations and depositing at site with initial lead of
10 mts and 2 mts including all operational, incidental and labour chargessuch as
shoring, sheeting, planking, strutting etc. complete for finished item of work as
per SS 308 excluding dewatering charges in loamy and clayey

For Foundation
1x 1 5.00 0.45 0.60 1.35 cum 206.65 cum 279.00
2 Filling foundations and basement with sand from approved quarry,including cost
and conveyance of all materials and labour charges charges complying with
standard specification including watering and tamping etc. complete.

For Foundation
1x 1 5.00 0.45 0.40 0.90 cum 508.50 cum 458.00
3 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to
(1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate)
using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved
quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes
on all materials, all operational, incidental, and labour charges such as mixing,
laying and ramming concrete in layers in position not exceeding 15cm, finishing
top surface, curing concrete, etc., complete for finished item of work for
Foundations (APSS No. 402)

For Foundation
1x 1 5.00 0.45 0.20 0.45 cum 1013.10 cum 456.00
4 Brick Masonry in superstructure with CM (1:8) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks, water
etc., to site, including seigniorage charges, sales & other taxes on all materials,
all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
finished item of work. (APSS No. 501 & 504).

Foundaton 1 x 1 4.9 0.45 0.4 0.88


First step 1 x 1 4.7 0.45 0.3 0.63
Peadstal 1 x 1 4.55 0.23 1.850 1.89
Top of Pedastral 1 x 1 (4.55+0.0)/2 0.23 0.30 0.15
3.56 cum 3467.35 cum 12358.00
5 Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all operational, incidental and
labour charges such as mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as directed by Engineer - in -
charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished
item of work. (APSS 901,903 & 904)

First step 1 x 1 4.7 0.30 1.41


Peadstal 1 x 2 4.55 1.85 16.84
Top of Pedastral 1 x 2 (4.55+0.0)/2 0.30 1.37
Sides 1 x 2 0.225 2.3 1.04
20.65 Sqm. 235.80 Sqm. 4868.00
6 Water proof cement paint two coats with super snowcem decorative paint 1st
grade of approved colour make and shade after surface is thoroughly cleaned
including cost and conveyance of all matgerials to site including scaffolding,
brushes and all labour charges etc., complete as directed by the departmental
officers for hand rails.

First step 1 x 1 4.7 0.30 1.41


Peadstal 1 x 2 4.55 1.85 16.84
Top of Pedastral 1 x 2 (4.55+0.0)/2 0.30 1.37
Sl.
Description of item Nos. L B D Qty. Rate/Per
No. Amount
1 2 3 4 5 6 7 8 9
Sides 1 x 2 0.225 2.3 1.04
20.65 Sqm. 114.50 1 Sqm. 236.00

7 Forming embankment with borrowed useful earth from outside road boundary
with 5 Km extra lead by mechanical means upto SDR with all leads and lifts
including pre-watering of soil at borrow area, removal of top soil, excavation of
soils at borrowed area, conveyance of soil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and
consolidation with 8 to 10 Tonnes PRR Road Roller @ OMC to meet
requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P and seigniorage charges, complete for finished item of work as
per MoRT&H specification 305 (4th revision)

1x 1 20.00 20.00 1.00 400.00 cum 119.00 cum 4760.00


8 Engaging special labour for cleaning the ground debries and cutting of light jungle.
1 x 10 2.00 20 Nos. 350.00 Each 7000.00
9 Supply and Fixing of Flakes
1 x 3 1.00 3.00 Nos. 15000.00 Each 45000.00

10 Supply and Fixing of 36'x18' Shamiynas


1x 1 3.00 3.00 Nos. 1000.00 Each 3000.00
11 Supply of Plastic Chairs
1x 1 100.00 100.00 Nos 10.00 Each 1000.00
12 Supply and Fixing of Carpet
1x 1 3.00 3.00 Nos 1000.00 Each 3000.00
82415
12 Add VAT 5% 4121
13 LS for u/s.items and rounding off. 3464
90000

Asst.Executive Engineer, Dy.Executive Engineer,


R&B Section::Palakurthy R&B Sub-Division: Palakurhy
DATA

Construction of Phylon on Khammam-Bonakal Road


Overheads 14%
COMMON STANDARD SCHEDULE OF RATES FOR THE YEAR 2012-2013
0% Rural area allowence

Qty Rate Per Amount


CEMENT MORTAR (1:2)
Material
Cost of Sand 1.05 Cum 635.05 1 Cum 666.80
Cost of Cement 720 Kgs 5039.21 1000 Kgs 3628.23
Man Power
Light Mazdoor 0.20 Nos 250.00 1 Day 50.00
Rate per cu.m. 4345.03
CEMENT MORTAR (1:3)
Material
Cost of Sand 1.05 Cum 635.05 1 Cum 666.80
Cost of Cement 480 Kgs 5039.21 1000 Kgs 2418.82
Man Power
Light Mazdoor 0.20 Nos 250.00 1 Day 50.00
Rate per cu.m. 3135.62
CEMENT MORTAR (1:4)
Material
Cost of Sand 1.05 Cum 635.05 1 Cum 666.80
Cost of Cement 360 Kgs 5039.21 1000 Kgs 1814.12
Man Power
Light Mazdoor 0.20 Nos 250.00 1 Day 50.00
Rate per cu.m. 2530.92
CEMENT MORTAR (1:5)
Material
Cost of Sand 1.05 Cum 635.05 1 Cum 666.80
Cost of Cement 288 Kgs 5039.21 1000 Kgs 1451.29
Man Power
Light Mazdoor 0.20 Nos 250.00 1 Day 50.00
Rate per cu.m. 2168.09
CEMENT MORTAR (1:6)
Material
Cost of Sand 1.05 Cum 635.05 1 Cum 666.80
Cost of Cement 240 Kgs 5039.21 1000 Kgs 1209.41
Man Power
Light Mazdoor 0.20 Nos 250.00 1 Day 50.00
Rate per cu.m. 1926.21
CEMENT MORTAR (1:8)
Material
Cost of Sand 1.05 Cum 635.05 1 Cum 666.80
Cost of Cement 180 Kgs 5039.21 1000 Kgs 907.06
Man Power
Light Mazdoor 0.20 Nos 250.00 1 Day 50.00
Rate per cu.m. 1623.86
Cost andConvenyance of 20mm to 6mm HBG
Graded Metal / (Trap Metal)
20mm 0.6 Cum 1577.67 1 Cum 946.60
12mm 0.15 Cum 1372.67 1 Cum 205.90
10mm 0.15 Cum 1204.67 1 Cum 180.70
6mm 0.10 Cum 1031.67 1 Cum 103.17
Rate per 1 cu.m. Total 1436.37

Page 6 C-data
1 Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth
& Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and
dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work including seignerage charges excluding
dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

Light Mazdoor 0.364 Nos 250.00 1 Day 91.00


Add 75% for excavation of foundation of building 1 cu.m. 68.250 1 cu.m. 68.25
add seigniorage charges 1 cum 22.00 1 cum 22.00
Add 14% over heads 181.25 cu.m. 0.14 1 cu.m. 25.38
Rate per 1 cu.m. Total 206.65
4 Filling with Sand Cushion under footings with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering
and ramming including cost and conveyence of water to the work site and all operational & incidental charges, labour charges, seignorage charges,
hire and opertaional charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

Cost of Sand 1 cu.m. 433.05 1 cu.m. 433.05


Light Mazdoor 0.052 Nos 250.00 1 Nos 13.00
Add 14% over heads 446.05 cu.m. 0.14 1 cu.m. 62.45
Rate per Cu.m. Total 508.50
6 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing
concrete, etc., complete for finished item of work for Foundations (APSS No. 402)

material
Metal 40mm 0.9 cu.m. 1125.67 1 cu.m. 1013.10
Sand 0.45 cu.m. 520.05 1 cu.m. 234.02
Cement 162 Kgs. 5039.21 1000 Kgs. 816.35
Water 1.2 KL 90.00 1 KL 108.00
Machinery
concrete mixer300/200 (diesel) 1 Hour 271.70 1 Hour 271.70
LA oncrew charges 0% 156.00 1 0.00
Labour
1st class mason 0.1 cu.m. 315.00 1 cu.m. 31.50
Light Mazdoor 1.39 Nos. 250.00 1 Each 347.50
Add 14% over heads 2822.18 cu.m. 0.14 1 cu.m. 395.10
Rate per Cu.m. Total 3217.30
19 Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift
charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

wall thickness 0.225


Material
Cement 36 kgs 5039.21 1000 kgs 181.41
Second class Bricks 512 Nos 3602.41 1000 Nos 1844.43
sand for mortor 0.2 cu.m. 520.05 1 cu.m. 104.01
B Labour
1st class mason 0.24 Nos. 315.00 1 Each 75.60
2nd class mason 0.56 Nos. 285.00 1 Each 159.60

Man Mazdoor 1.89 Nos. 250.00 1 Each 472.50


Basic Rate per Cum. 2837.56
Rate for other Floors GF FF SF TF
Basic rate per Cum 2837.56 2837.56 2837.56 2837.56
Hire charges of stage scafflding per cum 24.27 24.27 24.27 24.27
Labour charges for stage scaffolding per cum 179.69 269.56 359.38 449.24
Add LA on Labour for scaffolding 0% 0.00 0.00 0.00 0.00
Lift charges @ 10% extra on each floor 70.77 141.54 212.31
3041.52 3202.16 3362.75 3523.38

Page 7 C-data
Add 14% over heads 0.14 425.81 448.30 470.78 493.27
Rate per Cum. Total 3467.35 3650.50 3833.55 4016.65
27 Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS
901,903 & 904)

Base coat 16 mm thick in C.M. (1:6)

Cement 4.32 kgs 5039.21 1000 kgs 21.77


cost of sand for mortor 0.018 cu.m. 635.05 1 cu.m. 11.43
Top Coat 4mm thick in C.M. (1:4)
Cement 1.44 kgs 5039.21 1000 kgs 7.26
cost of sand for mortor 0.004 cu.m. 635.05 1 cu.m. 2.54
Labour

1st Class Mason 0.063 Nos. 315.00 1 Each 19.85


2nd Class Mason 0.147 Nos. 285.00 1 Each 41.90
Light mazdoor 0.39 Nos. 250.00 1 Each 97.50
Basic rate per 1 Sqmt. 202.24
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 202.24 202.24 202.24 202.24
Hire charges of access scafflding pers qm 0.55 0.55 0.55 0.55
Labour charges for access scaffolding per sqm 4.04 6.06 8.09 10.11

Add LA on Labour for scaffolding 0% 0.00 0.00 0.00 0.00


Lift charges @ 10% extra on each floor 15.92 31.85 47.77
206.83 224.77 242.73 260.67
Add 14% over heads 0.14 28.96 31.47 33.98 36.49
Rate per 1 Sqmt. Total 235.80 256.25 276.75 297.20

Page 8 C-data
LEAD CHART

Construction of Phylon on Khammam-Bonakal Road


RATES AS PER COMMON SSR OF 2012-13 with cement and steel rates of October, 2012 (2nd month of 2nd quarter)
Area
Lead in KM Initial Cost Add allowenc
including Differenc e on
Conven 1% Loadin unloadi
Stacking in loading
Sl. No. Description SSR Sl.No. Source of Material ce towards g ng Total Unit per
Charges Seignio- &
MR CT Total Charges wherever rage
storage charges charges
unloadin
necesssary Charges g charges
@0%
(1) (2) (3) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
1 Sand for Mortar M-005 Wyra River 15.00 0.00 15.00 139.11 375.00 0.00 0.00 0.00 5.94 0.00 520.05 Cum.
2 Sand for filling& blindage M-004 Wyra River 15.00 0.00 15.00 139.11 288.00 0.00 0.00 0.00 5.94 0.00 433.05 Cum.
3 Sand for plastering works M-006 Wyra River 15.00 0.00 15.00 139.11 490.00 0.00 0.00 0.00 5.94 0.00 635.05 Cum.
4 Gravel M-008 Local 5.00 1.00 7.00 60.55 97.00 0.00 0.00 11.88 5.94 0.00 175.37 Cum.
40mm HBG Metal M-055 Crusher at Km.6/7
8 37.00 0.00 37.00 343.67 782.00 0.00 0.00 0.00 0.00 0.00 1125.67 Cum.
(IS383-1970) of K-K road
20mm M/c chips M-053 Crusher at Km.6/7
9 37.00 0.00 37.00 343.67 1234.00 0.00 0.00 0.00 0.00 0.00 1577.67 Cum.
(IS383-1970) of K-K road
13.2/12.5 mm M/c chips M-052 Crusher at Km.6/7
10 37.00 0.00 37.00 343.67 1029.00 0.00 0.00 0.00 0.00 0.00 1372.67 Cum.
(IS383-1970) of K-K road
10mm M/c chips M-051 Crusher at Km.6/7
11 37.00 0.00 37.00 343.67 861.00 0.00 0.00 0.00 0.00 0.00 1204.67 Cum.
(IS383-1970) of K-K road
6mm M/c chips M-050 Crusher at Km.6/7
12 37.00 0.00 37.00 343.67 688.00 0.00 0.00 0.00 0.00 0.00 1031.67 Cum.
(IS383-1970) of K-K road
2nd Class Bricks of size BMT-A.01
13 23x11x7cm Local 5.00 0.00 5.00 65.05 3472.00 0.00 0.00 32.68 32.68 0.00 3602.41 1000 Nos

20 water M-189 Local 0.50 0.00 0.50 0.00 90.00 0.00 90.00 KL

21 Cement CSSR-A.05 At Site 0.00 0.00 0.00 5000.00 0.00 0.00 0.00 39.21 0.00 5039.21 M.T

AEE/AE Dy. Executive Engineer Executive Engineer

LEAD 9
Area
Lead in KM Initial Cost Add allowenc
including Differenc e on
Conven 1% Loadin unloadi
Stacking in loading
Sl. No. Description SSR Sl.No. Source of Material ce towards g ng Total Unit per
Charges Seignio- &
MR CT Total Charges storage charges charges
wherever rage unloadin
necesssary Charges g charges
@0%
R&B Section::Madhira R&B Sub-Division::Madhira R&B Division::Khammam

LEAD 10
Name of the work : Sub Estiate for the work Providing Electrification to Model School

S. Quantity Description of Work Unit Rate (Rs.) Amount


NO in fig. (Rs.)
. CONDUIT PIPE

1 1250 RM #REF! ONE #REF! #REF!


RM

2 500 RM #REF! ONE #REF! #REF!


RM

WIRING

3 657 PTS #REF! POINT #REF! #REF!

4 82 PTS #REF! POINT #REF! #REF!

57 Supply and fixing of 3 Nos 6A 3 pin wall plug socket with 3 Nos. 6A EACH #REF! #REF!
switch control on a common switch board with earth continuity
including wire leads, earth connections along with all labour charges
etc., complete.
Makes : Anchor / Gold Medal Olive /Million Zoom

5 207 PTS Wiring with three runs of 1.0 sq.mm insulated PVC flexible POINT #REF! #REF!
copper conductor cable (phase, neutral, earth) in the existing
conduit pipe with 6 Amps flush type switch, and 6 A 3/2 pin
socket on Separate switch board etc.,complete as required
Make:Million / Gold Medal

6 27 NOS #REF! EACH #REF! #REF!


7 7 NOS Supply and fixing single phase DB in sheet steel enclosure EACH #REF! #REF!
with metalic plug and socket with 1 No. 20/32A,10KA
SPMCB ( Motor characteristics MCBs) control including
making connections etc., complete concealing in wall.
Makes : MDS / L&T Hager.

8 57 NOS Supply and fixing of cat-6 RJ-45information outlets including dual EACH #REF! #REF!
face plate with MS box with modular plate cover with screws
connections etc., Makes: Belden/D link/Legrand

RUN OF MAINS

9 628 RM Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. ONE #REF! #REF!
insulated flexible copper cable in existing pipe for earth RM
continuity including all labour charges etc., complete.
Makes : Gold Medal / Finolex / RPG/ L&T Hager / Million

10 1985 RM Supply and run of 2 of 2.5 sq.mm PVC insulated flexible ONE #REF! #REF!
copper cable and one run of 1.0 sq.mm flexible copper wire RM
for earthing in existing MS conduit pipe for circuits including
labour charges (phase neutral and earth) etc., complete as
required for switch board circuit mains.
Make:Finolex / Gold Medal /L&T/ Million / RPG.
11 420 RM Supply and run of 2 of 2.5 sq.mm PVC insulated flexible ONE #REF! #REF!
copper cable for earthing in existing MS conduit pipe for RM
circuits including labour charges (phase neutral and earth)
etc., complete as required for switch board circuit mains.
Make:Finolex / Gold Medal /L&T/ Million / RPG.

12 44 RM Supply and run of 4 of 6 Sq mm PVC insulated flexible ONE #REF! #REF!


copper cable PVC insulated flexible copper cable in the RM
existing conduit pipe for run of mains from main panel board
to TPN DB'S with pin type lugs and connections
etc.,complete for Lighting Distribution boards.
Make:Finolex / Gold Medal /L&T/ Million / RPG.

13 50 RM Supply and run of 4 of 10 Sq mm PVC insulated flexible ONE #REF! #REF!


copper cable PVC insulated flexible copper cable in the RM
existing conduit pipe for run of mains from main panel board
to TPN DB'S with pin type lugs and connections
etc.,complete for PDB's and AC DBS
Make:Finolex / Gold Medal /L&T/ Million / RPG.

14 224 RM Supply and laying of 2 pair telephone wire in the existing ONE #REF! #REF!
metallic/non metallic conduit pipe with connections etc.,complete RM
Makes: million/payal/goldmedal/powerflex

15 538 RM Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing ONE #REF! #REF!
metallic/non metallic conduit pipe with connections etc.,complete RM
Makes:D Link/Finolex

16 50 NOS Supply of 3feet length patch cords of make D link make / Beldan / EACH 200.00 10000.00
Krone
17 11 NOS Supply and fixing of telephone jack type socket with top on MS box EACH #REF! #REF!
with modular plate cover with screws connections etc., Makes: Gold
Medal Olive / Million zoom

LIGHT FITTINGS

18 306 NOS Supply, Transportation and fixing of 4' - 40 Watt box type flourescent EACH #REF! #REF!
single Tube Light fitting with Energy saving electronic ballast
suitable for 40 Watt tube on varnished teak wood round blocks with
flexible 3 core wire etc.,, complete with all connections including cost
of 40W tube. The fitting shall be under warranty for three years.
Makes: Crompton/Bajaj/Surya/Havells.

19 85 NOS Supply and fixing of batten holder / slanting holder in lieu of ceiling EACH #REF! #REF!
rose of light point complete with all connections and all labour
charges with 40W bulb (for new installation).
Makes : Gold Medal /Million / Vimal

20 157 NOS Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 EACH #REF! #REF!
Blades and double ball bearings with all standard accessories.
Makes: Crompton Aura / Bajaj R Gold / Havells Festiva / Usha
Premium.

21 157 NOS Supply and erecting Electronic type regulator for ceiling fans 1200 EACH #REF! #REF!
mm sweep complete erected on existing board.
22 157 NOS Labour charges for Fixing of Ceiling fan and regulator including EACH #REF! #REF!
transportation and giving connections with twin core wire etc.,
complete.
23 14 NOS Supply of fresh air exhaust fan of heavy duty 250V A.C.50Hz.. EACH #REF! #REF!
300mm size (12") 900 R.P.M etc., complete.
Makes: CG / Bajaj / Havells/ Orient.
24 14 NOS Labour charges for fixing of Exhaust fan in wall with necessary EACH #REF! #REF!
connections and masonary work of making hole, finishing etc.,
complete
25 12 NOS Supply of 1x40W weather proof flourescent streetlight fitting EACH #REF! #REF!
comprising canopy of sheet Aluminium in stove enamel finish with
copper / VPIT ballast, capacitor, tube and starter etc., complete.
Makes: Phillips / GE / Wipro

26 12 NOS Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm EACH #REF! #REF!
dia GI pipe bracket and anti tilting MS flat etc., including giving
connections and labour charges etc., complete.

27 1 NOS Supply of Integral street light luminaire of 150W HPSV lamp fitting EACH #REF! #REF!
comprises of single piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with pot optics including 150W
HPSV lamp etc., complete.
Makes: Phillips / GE.

28 1 NOS Fixing of MV / SV/MH luminaire on wall with 1.0mt 40mm dia GI EACH #REF! #REF!
pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable
etc.,including all labour charges for mason work and giving
connections etc., complete.

DISTRIBUTION BOARDS

29 2 NOS Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH #REF! #REF!
Protection with 125A, 4 Pole 25 kA MCCB as incomer with 4Nos
63A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing including
internal connection and labour charges for flush mounting etc.,
complete.
Makes: MDS/ L&T Hager

30 8 NOS Supply and fixing of TPN 4 way distribution board board EACH #REF! #REF!
flushed in wall suitable for single pole outgoing MCB's in
sheet metal enclosure with 63 Amps -4 pole isolator incomer
and 12 nos. 16 to 32 Amps single pole, 10 KA breaking
capacity MCB outgoings including connections and labour
etc. (Lighting DB's)
Makes : MDS / L&T Hager.

31 250 RM Supply of the following PVC XLPE armoured cable 1100 V. ONE #REF! #REF!
Grade with ISI mark stranded/solid aluminimum conduct RM
complete., Make: Universal/NICCO/RPG/SURANA/POY
CAB/Paragaon Cables. 3.50Core 25 Sq.mm

32 2 Nos Supply and fixing of 24 port switches of D link make including EACH #REF! #REF!
making connections and etc., complete
33 2 Nos Supply of 17U floor mounting net work rack with power spike #REF!
including all accessries of make HCL / Vall
34 2 Nos Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH #REF! #REF!
Protection with 1 No. 63A TP MCB as incomer with 24 Nos. 10 kA
SPMCBs as outgoing including internal connection and labour
charges for flush mounting etc., complete.
Makes: MDS/ L&T Hager

CABLES
35 100 Mtrs Supply of 3.5 Core 95 Sq. mm PVC XLPE armoured cable 1100 V. 1 Mtr #REF! #REF!
Grade with ISI mark stranded / solid, aluminimum conductor
complete
Make: Universal / NICCO/ TORRENT/CCI/ FORTUNE ART

36 200 Mtrs Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm
1 Mtr #REF! on sand cushion
#REF! covering t

EARTHING

37 4 NOS Providing independent earthing by excavating a trench to a EACH #REF! #REF!


depth of 2.1 M in all soild, as per size specified in the Data
using 40 mm dia 'B' Class GI pipe of 2.5 mtrs length with
necessary accessories with hume pipe rings duly providing
staggered holes including filling with equal proportion of salt
and charcoal in layers and all labour charges etc., complete
for smal quarters.

38 1 NO Supply and Fixing of 3 phase meter Box, 3 Nos 100 A fuse units, EACH 2521.00 2521.00
Neutral link, on T.W block with all accessaries etc., complete for
finished items of work.

TOTAL: #REF!
HIRE CHARGES OF MACHINERY
Hire Fuel Crew Total Per
Charges Charges Charges
a) Hire charges of Tipper 5.00 454.40 239.10 124.80 818.30 Hour
Cum capacity
b) Hire charges of Tipper 10 424.50 239.10 117.00 780.60 Hour
Tonnes capacity
c) Hire charges of Water 408.80 239.10 117.00 764.90 Hour
Tanker 8000 Ltrs capacity
d) Hire charges of Truck 10 424.50 239.10 117.00 780.60 Hour
Tonnes capacity
e) Hire charges of FE loader 424.50 239.10 117.00 780.60 Hour
1.00 Cum bucket capacity @
45 Cum

RATES FOR CONVEYANCE BY MACHINERY


1 Mincipal area allowance 0.00%
2 Industrial area allowance 0.00%
3 Agency area allowance 0.00%
4 Allowable allowance 0.00%
5 Add Overhead Charges & Contractor's Profit 0.00%
A) For Earth/Gravel/Sand/Morrum/Lime/Surki (per Cum):
1 Lead up to 1 Km:
Out put = 5.00 Cum Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 68.16
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 35.87
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 18.72
0.00 add area allowance at 0% on Rs. 18.72 Rs. 0.00
Rate for 5.00 Cum Rs. 122.75
Rate for 1.00 Cum Rs. 24.55
0.00 add overheads and contractors profit at 0% 24.55 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 24.55

2 Lead up to 2 Km:
Out put = 5.00 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 95.42
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 50.21
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 26.21
0.00 add area allowance at 0% on Rs. 26.21 Rs. 0.00
Rate for 5.00 Cum Rs. 171.84
Rate for 1.00 Cum Rs. 34.37
0.00 add overheads and contractors profit at 0% 34.37 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 34.37

3 Lead up to 3 Km:
Out put = 5.00 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 127.23
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 66.95
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 34.94
0.00 add area allowance at 0% on Rs. 34.94 Rs. 0.00
Rate for 5.00 Cum Rs. 229.12
Rate for 1.00 Cum Rs. 45.82
0.00 add overheads and contractors profit at 0% 45.82 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 45.82

4 Lead up to 4 Km:
Out put = 5.00 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 154.50
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 81.29
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 42.43
0.00 add area allowance at 0% on Rs. 42.43 Rs. 0.00
Rate for 5.00 Cum Rs. 278.22
Rate for 1.00 Cum Rs. 55.64
0.00 add overheads and contractors profit at 0% 55.64 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 55.64

5 Lead up to 5 Km:
Out put = 5.00 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 181.76
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 95.64
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 49.92
0.00 add area allowance at 0% on Rs. 49.92 Rs. 0.00
Rate for 5.00 Cum Rs. 327.32
Rate for 1.00 Cum Rs. 65.46
0.00 add overheads and contractors profit at 0% 65.46 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 65.46

6 Lead for every Km from 5 to 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 27.26
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 14.35
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 7.49
0.00 add area allowance at 0% on Rs. 7.49 Rs. 0.00
Rate for 5.00 Cum Rs. 49.10
Rate for 1.00 Cum Rs. 9.82
0.00 add overheads and contractors profit at 0% 9.82 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 9.82

7 Lead for every Km beyond 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 22.72
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 11.96
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 6.24
0.00 add area allowance at 0% on Rs. 6.24 Rs. 0.00
Rate for 5.00 Cum Rs. 40.92
Rate for 1.00 Cum Rs. 8.18
0.00 add overheads and contractors profit at 0% 8.18 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 8.18

B) For Rubble/Size stones/Cut stones/Coarse aggregates (per Cum):


1 Lead up to 1 Km:
Out put = 5.00 Cum Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 68.16
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 35.87
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 18.72
0.00 add area allowance at 0% on Rs. 18.72 Rs. 0.00
Rate for 5.00 Cum Rs. 122.75
Rate for 1.00 Cum Rs. 24.55
0.00 add overheads and contractors profit at 0% 24.55 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 24.55
2 Lead up to 2 Km:
Out put = 5.00 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 95.42
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 50.21
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 26.21
0.00 add area allowance at 0% on Rs. 26.21 Rs. 0.00
Rate for 5.00 Cum Rs. 171.84
Rate for 1.00 Cum Rs. 34.37
0.00 add overheads and contractors profit at 0% 34.37 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 34.37

3 Lead up to 3 Km:
Out put = 5.00 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 127.23
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 66.95
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 34.94
0.00 add area allowance at 0% on Rs. 34.94 Rs. 0.00
Rate for 5.00 Cum Rs. 229.12
Rate for 1.00 Cum Rs. 45.82
0.00 add overheads and contractors profit at 0% 45.82 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 45.82

4 Lead up to 4 Km:
Out put = 5.00 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 154.50
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 81.29
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 42.43
0.00 add area allowance at 0% on Rs. 42.43 Rs. 0.00
Rate for 5.00 Cum Rs. 278.22
Rate for 1.00 Cum Rs. 55.64
0.00 add overheads and contractors profit at 0% 55.64 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 55.64

5 Lead up to 5 Km:
Out put = 5.00 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 181.76
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 95.64
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 49.92
0.00 add area allowance at 0% on Rs. 49.92 Rs. 0.00
Rate for 5.00 Cum Rs. 327.32
Rate for 1.00 Cum Rs. 65.46
0.00 add overheads and contractors profit at 0% 65.46 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 65.46

6 Lead for every Km from 5 to 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 27.26
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 14.35
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 7.49
0.00 add area allowance at 0% on Rs. 7.49 Rs. 0.00
Rate for 5.00 Cum Rs. 49.10
Rate for 1.00 Cum Rs. 9.82
0.00 add overheads and contractors profit at 0% 9.82 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 9.82

7 Lead for every Km beyond 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 22.72
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 11.96
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 6.24
0.00 add area allowance at 0% on Rs. 6.24 Rs. 0.00
Rate for 5.00 Cum Rs. 40.92
Rate for 1.00 Cum Rs. 8.18
0.00 add overheads and contractors profit at 0% 8.18 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 8.18

C) For Cement/Steel/RCC poles/A.C & G.I sheets/Packed materials (per Tonne):


1 Lead up to 1 Km:
Out put = 8.00 MT Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 68.16
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 35.87
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 18.72
0.00 add area allowance at 0% on Rs. 18.72 Rs. 0.00
Rate for 8.00 MT Rs. 122.75
Rate for 1.00 MT Rs. 15.34
0.00 add overheads and contractors profit at 0% 15.34 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 15.34

2 Lead up to 2 Km:
Out put = 8.00 MT Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 95.42
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 50.21
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 26.21
0.00 add area allowance at 0% on Rs. 26.21 Rs. 0.00
Rate for 8.00 MT Rs. 171.84
Rate for 1.00 MT Rs. 21.48
0.00 add overheads and contractors profit at 0% 21.48 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 21.48

3 Lead up to 3 Km:
Out put = 8.00 MT Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 127.23
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 66.95
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 34.94
0.00 add area allowance at 0% on Rs. 34.94 Rs. 0.00
Rate for 8.00 MT Rs. 229.12
Rate for 1.00 MT Rs. 28.64
0.00 add overheads and contractors profit at 0% 28.64 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 28.64

4 Lead up to 4 Km:
Out put = 8.00 MT Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 154.50
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 81.29
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 42.43
0.00 add area allowance at 0% on Rs. 42.43 Rs. 0.00
Rate for 8.00 MT Rs. 278.22
Rate for 1.00 MT Rs. 34.78
0.00 add overheads and contractors profit at 0% 34.78 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 34.78

5 Lead up to 5 Km:
Out put = 8.00 MT Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 181.76
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 95.64
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 49.92
0.00 add area allowance at 0% on Rs. 49.92 Rs. 0.00
Rate for 8.00 MT Rs. 327.32
Rate for 1.00 MT Rs. 40.92
0.00 add overheads and contractors profit at 0% 40.92 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 40.92

6 Lead for every Km from 5 to 30 Km:


Out put = 8.00 MT Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 27.26
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 14.35
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 7.49
0.00 add area allowance at 0% on Rs. 7.49 Rs. 0.00
Rate for 8.00 MT Rs. 49.10
Rate for 1.00 MT Rs. 6.14
0.00 add overheads and contractors profit at 0% 6.14 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 6.14

7 Lead for every Km beyond 30 Km:


Out put = 8.00 MT Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 22.72
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 11.96
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 6.24
0.00 add area allowance at 0% on Rs. 6.24 Rs. 0.00
Rate for 8.00 MT Rs. 40.92
Rate for 1.00 MT Rs. 5.12
0.00 add overheads and contractors profit at 0% 5.12 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 5.12

D) For PCC Slabs/Shabad Slabs/CC & Laterite Blocks/Wood (per Cum):


1 Lead up to 1 Km:
Out put = 3.40 Cum Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 68.16
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 35.87
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 18.72
0.00 add area allowance at 0% on Rs. 18.72 Rs. 0.00
Rate for 3.40 Cum Rs. 122.75
Rate for 1.00 Cum Rs. 36.1
0.00 add overheads and contractors profit at 0% 36.10 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 36.10

2 Lead up to 2 Km:
Out put = 3.40 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 95.42
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 50.21
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 26.21
0.00 add area allowance at 0% on Rs. 26.21 Rs. 0.00
Rate for 3.40 Cum Rs. 171.84
Rate for 1.00 Cum Rs. 50.54
0.00 add overheads and contractors profit at 0% 50.54 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 50.54

3 Lead up to 3 Km:
Out put = 3.40 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 127.23
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 66.95
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 34.94
0.00 add area allowance at 0% on Rs. 34.94 Rs. 0.00
Rate for 3.40 Cum Rs. 229.12
Rate for 1.00 Cum Rs. 67.39
0.00 add overheads and contractors profit at 0% 67.39 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 67.39

4 Lead up to 4 Km:
Out put = 3.40 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 154.50
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 81.29
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 42.43
0.00 add area allowance at 0% on Rs. 42.43 Rs. 0.00
Rate for 3.40 Cum Rs. 278.22
Rate for 1.00 Cum Rs. 81.83
0.00 add overheads and contractors profit at 0% 81.83 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 81.83

5 Lead up to 5 Km:
Out put = 3.40 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 181.76
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 95.64
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 49.92
0.00 add area allowance at 0% on Rs. 49.92 Rs. 0.00
Rate for 3.40 Cum Rs. 327.32
Rate for 1.00 Cum Rs. 96.27
0.00 add overheads and contractors profit at 0% 96.27 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 96.27

6 Lead for every Km from 5 to 30 Km:


Out put = 3.40 Cum Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 27.26
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 14.35
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 7.49
0.00 add area allowance at 0% on Rs. 7.49 Rs. 0.00
Rate for 3.40 Cum Rs. 49.10
Rate for 1.00 Cum Rs. 14.44
0.00 add overheads and contractors profit at 0% 14.44 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 14.44

7 Lead for every Km beyond 30 Km:


Out put = 3.40 Cum Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 454.40 Hour Rs. 22.72
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 239.10 Hour Rs. 11.96
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 124.80 Hour Rs. 6.24
0.00 add area allowance at 0% on Rs. 6.24 Rs. 0.00
Rate for 3.40 Cum Rs. 40.92
Rate for 1.00 Cum Rs. 12.04
0.00 add overheads and contractors profit at 0% 12.04 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 12.04

E) For Water (per 1000 Ltrs):


1 Lead up to 1 Km:
Out put = 8000 Ltrs Rate Per Amount
0.15 Hrs. hire charges of water tanker 8000 ltrs 408.80 Hour Rs. 61.32
capacity @ Rs.
0.15 Hrs. fuel charges of water tanker 8000 ltrs 239.10 Hour Rs. 35.87
capacity @ Rs.
0.15 Hrs. crew charges of water tanker 8000 ltrs 117.00 Hour Rs. 17.55
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 17.55 Rs. 0.00
Rate for 8000 Ltrs Rs. 114.74
Rate for 1000 Ltrs Rs. 14.34
0.00 add overheads and contractors profit at 0% 14.34 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 14.34

2 Lead up to 2 Km:
Out put = 8000 Ltrs Rate Per Amount
0.21 Hrs. hire charges of water tanker 8000 ltrs 408.80 Hour Rs. 85.85
capacity @ Rs.
0.21 Hrs. fuel charges of water tanker 8000 ltrs 239.10 Hour Rs. 50.21
capacity @ Rs.
0.21 Hrs. crew charges of water tanker 8000 ltrs 117.00 Hour Rs. 24.57
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 24.57 Rs. 0.00
Rate for 8000 Ltrs Rs. 160.63
Rate for 1000 Ltrs Rs. 20.08
0.00 add overheads and contractors profit at 0% 20.08 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 20.08

3 Lead up to 3 Km:
Out put = 8000 Ltrs Rate Per Amount
0.28 Hrs. hire charges of water tanker 8000 ltrs 408.80 Hour Rs. 114.46
capacity @ Rs.
0.28 Hrs. fuel charges of water tanker 8000 ltrs 239.10 Hour Rs. 66.95
capacity @ Rs.
0.28 Hrs. crew charges of water tanker 8000 ltrs 117.00 Hour Rs. 32.76
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 32.76 Rs. 0.00
Rate for 8000 Ltrs Rs. 214.17
Rate for 1000 Ltrs Rs. 26.77
0.00 add overheads and contractors profit at 0% 26.77 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 26.77

4 Lead up to 4 Km:
Out put = 8000 Ltrs Rate Per Amount
0.34 Hrs. hire charges of water tanker 8000 ltrs 408.80 Hour Rs. 138.99
capacity @ Rs.
0.34 Hrs. fuel charges of water tanker 8000 ltrs 239.10 Hour Rs. 81.29
capacity @ Rs.
0.34 Hrs. crew charges of water tanker 8000 ltrs 117.00 Hour Rs. 39.78
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 39.78 Rs. 0.00
Rate for 8000 Ltrs Rs. 260.06
Rate for 1000 Ltrs Rs. 32.51
0.00 add overheads and contractors profit at 0% 32.51 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 32.51

5 Lead up to 5 Km:
Out put = 8000 Ltrs Rate Per Amount
0.40 Hrs. hire charges of water tanker 8000 ltrs 408.80 Hour Rs. 163.52
capacity @ Rs.
0.40 Hrs. fuel charges of water tanker 8000 ltrs 239.10 Hour Rs. 95.64
capacity @ Rs.
0.40 Hrs. crew charges of water tanker 8000 ltrs 117.00 Hour Rs. 46.80
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 46.80 Rs. 0.00
Rate for 8000 Ltrs Rs. 305.96
Rate for 1000 Ltrs Rs. 38.25
0.00 add overheads and contractors profit at 0% 38.25 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 38.25

6 Lead for every Km from 5 to 30 Km:


Out put = 8000 Ltrs Rate Per Amount
0.06 Hrs. hire charges of water tanker 8000 ltrs 408.80 Hour Rs. 24.53
capacity @ Rs.
0.06 Hrs. fuel charges of water tanker 8000 ltrs 239.10 Hour Rs. 14.35
capacity @ Rs.
0.06 Hrs. crew charges of water tanker 8000 ltrs 117.00 Hour Rs. 7.02
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 7.02 Rs. 0.00
Rate for 8000 Ltrs Rs. 45.90
Rate for 1000 Ltrs Rs. 5.74
0.00 add overheads and contractors profit at 0% 5.74 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 5.74

7 Lead for every Km beyond 30 Km:


Out put = 8000 Ltrs Rate Per Amount
0.05 Hrs. hire charges of water tanker 8000 ltrs 408.80 Hour Rs. 20.44
capacity @ Rs.
0.05 Hrs. fuel charges of water tanker 8000 ltrs 239.10 Hour Rs. 11.96
capacity @ Rs.
0.05 Hrs. crew charges of water tanker 8000 ltrs 117.00 Hour Rs. 5.85
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 5.85 Rs. 0.00
Rate for 8000 Ltrs Rs. 38.25
Rate for 1000 Ltrs Rs. 4.78
0.00 add overheads and contractors profit at 0% 4.78 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 4.78

F) For Bricks (per 1000 Nos):


1 Lead up to 1 Km:
Out put = 3000 Nos Rate Per Amount
0.15 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 63.68
capacity @ Rs.
0.15 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 35.87
capacity @ Rs.
0.15 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 17.55
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 17.55 Rs. 0.00
Rate for 3000 Nos Rs. 117.10
Rate for 1000 Nos Rs. 39.03
0.00 add overheads and contractors profit at 0% 39.03 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 39.03

2 Lead up to 2 Km:
Out put = 3000 Nos Rate Per Amount
0.21 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 89.15
capacity @ Rs.
0.21 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 50.21
capacity @ Rs.
0.21 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 24.57
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 24.57 Rs. 0.00
Rate for 3000 Nos Rs. 163.93
Rate for 1000 Nos Rs. 54.64
0.00 add overheads and contractors profit at 0% 54.64 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 54.64

3 Lead up to 3 Km:
Out put = 3000 Nos Rate Per Amount
0.28 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 118.86
capacity @ Rs.
0.28 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 66.95
capacity @ Rs.
0.28 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 32.76
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 32.76 Rs. 0.00
Rate for 3000 Nos Rs. 218.57
Rate for 1000 Nos Rs. 72.86
0.00 add overheads and contractors profit at 0% 72.86 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 72.86

4 Lead up to 4 Km:
Out put = 3000 Nos Rate Per Amount
0.34 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 144.33
capacity @ Rs.
0.34 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 81.29
capacity @ Rs.
0.34 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 39.78
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 39.78 Rs. 0.00
Rate for 3000 Nos Rs. 265.40
Rate for 1000 Nos Rs. 88.47
0.00 add overheads and contractors profit at 0% 88.47 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 88.47
5 Lead up to 5 Km:
Out put = 3000 Nos Rate Per Amount
0.40 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 169.80
capacity @ Rs.
0.40 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 95.64
capacity @ Rs.
0.40 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 46.80
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 46.80 Rs. 0.00
Rate for 3000 Nos Rs. 312.24
Rate for 1000 Nos Rs. 104.08
0.00 add overheads and contractors profit at 0% 104.08 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 104.08

6 Lead for every Km beyond 5 Kms up to 30 Kms:


Out put = 3000 Nos Rate Per Amount
0.06 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 25.47
capacity @ Rs.
0.06 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 14.35
capacity @ Rs.
0.06 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 7.02
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 7.02 Rs. 0.00
Rate for 3000 Nos Rs. 46.84
Rate for 1000 Nos Rs. 15.61
0.00 add overheads and contractors profit at 0% 15.61 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 15.61

7 Lead for every Km beyond 30 Kms:


Out put = 3000 Nos Rate Per Amount
0.05 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 21.23
capacity @ Rs.
0.05 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 11.96
capacity @ Rs.
0.05 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 5.85
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 5.85 Rs. 0.00
Rate for 3000 Nos Rs. 39.04
Rate for 1000 Nos Rs. 13.01
0.00 add overheads and contractors profit at 0% 13.01 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 13.01

LOADING & UNLOADING CHARGES BY MANUAL MEANS (EXCLUDING IDLE HIRE


CHARGES OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 285.00 day Rs. 2.85
0.25 day Mazdoor 250.00 day Rs. 62.50
Rs. 65.35
0.00 add area allowance at 0% on Rs. 65.35 Rs. 0.00
Total labour charges Rs. 65.35
Rate for 5.50 Cum Rs. 65.35
Rate for 1.00 Cum Rs. 11.88
0.00 add overheads and contractors profit at 0% 11.88 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 11.88

(ii) Unloading charges:


Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.005 day Head mazdoor 285.00 day Rs. 1.43
0.125 day Mazdoor 250.00 day Rs. 31.25
Rs. 32.68
0.00 add area allowance at 0% on Rs. 32.68 Rs. 0.00
Total labour charges Rs. 32.68
Rate for 5.50 Cum Rs. 32.68
Rate for 1.00 Cum Rs. 5.94
0.00 add overheads and contractors profit at 0% 5.94 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 5.94

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish,
Crushed slag, Stone for masonry work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.02 day Head mazdoor 285.00 day Rs. 5.70
0.50 day Mazdoor 250.00 day Rs. 125.00
Rs. 130.70
0.00 add area allowance at 0% on Rs. 130.70 Rs. 0.00
Total labour charges Rs. 130.70
Rate for 5.50 Cum Rs. 130.70
Rate for 1.00 Cum Rs. 23.76
0.00 add overheads and contractors profit at 0% 23.76 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 23.76

(ii) Unloading charges:


Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 285.00 day Rs. 2.85
0.25 day Mazdoor 250.00 day Rs. 62.50
Rs. 65.35
0.00 add area allowance at 0% on Rs. 65.35 Rs. 0.00
Total labour charges Rs. 65.35
Rate for 5.50 Cum Rs. 65.35
Rate for 1.00 Cum Rs. 11.88
0.00 add overheads and contractors profit at 0% 11.88 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 11.88

C) For Cement (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.06 day Head mazdoor 285.00 day Rs. 17.10
1.50 day Mazdoor 250.00 day Rs. 375.00
Rs. 392.10
0.00 add area allowance at 0% on Rs. 392.10 Rs. 0.00
Total labour charges Rs. 392.10
Rate for 10.00 MT Rs. 392.10
Rate for 1.00 MT Rs. 39.21
0.00 add overheads and contractors profit at 0% 39.21 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 39.21

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.06 day Head mazdoor 285.00 day Rs. 17.10
1.50 day Mazdoor 250.00 day Rs. 375.00
Rs. 392.10
0.00 add area allowance at 0% on Rs. 392.10 Rs. 0.00
Total labour charges Rs. 392.10
Rate for 10.00 MT Rs. 392.10
Rate for 1.00 MT Rs. 39.21
0.00 add overheads and contractors profit at 0% 39.21 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 39.21

D) For Structural steel, Steel bars (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 285.00 day Rs. 19.95
1.80 day Mazdoor 250.00 day Rs. 450.00
Rs. 469.95
0.00 add area allowance at 0% on Rs. 469.95 Rs. 0.00
Total labour charges Rs. 469.95
Rate for 10.00 MT Rs. 469.95
Rate for 1.00 MT Rs. 47.00
0.00 add overheads and contractors profit at 0% 47.00 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 47.00

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 285.00 day Rs. 19.95
1.80 day Mazdoor 250.00 day Rs. 450.00
Rs. 469.95
0.00 add area allowance at 0% on Rs. 469.95 Rs. 0.00
Total labour charges Rs. 469.95
Rate for 10.00 MT Rs. 469.95
Rate for 1.00 MT Rs. 47.00
0.00 add overheads and contractors profit at 0% 47.00 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 47.00

E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):


(i) Loading charges:
Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.01 day Head mazdoor 285.00 day Rs. 2.85
0.25 day Mazdoor 250.00 day Rs. 62.50
Rs. 65.35
0.00 add area allowance at 0% on Rs. 65.35 Rs. 0.00
Total labour charges Rs. 65.35
Rate for 2000 Nos Rs. 65.35
Rate for 1000 Nos Rs. 32.68
0.00 add overheads and contractors profit at 0% 32.68 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 32.68

(ii) Unloading & Stacking charges:


Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.01 day Head mazdoor 285.00 day Rs. 2.85
0.25 day Mazdoor 250.00 day Rs. 62.50
Rs. 65.35
0.00 add area allowance at 0% on Rs. 65.35 Rs. 0.00
Total labour charges Rs. 65.35
Rate for 2000 Nos Rs. 65.35
Rate for 1000 Nos Rs. 32.68
0.00 add overheads and contractors profit at 0% 32.68 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 32.68

LOADING & UNLOADING CHARGES BY MANUAL MEANS (INCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 285.00 day Rs. 2.85
0.25 day Mazdoor 250.00 day Rs. 62.50
Rs. 65.35
0.00 add area allowance at 0% on Rs. 65.35 Rs. 0.00
Total labour charges Rs. 65.35
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 212.25
capacity @ Rs.
0.50 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 119.55
capacity @ Rs.
0.50 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 58.50
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 58.50 Rs. 0.00
Total machinery charges Rs. 390.30
Total labour and machinery charges Rs. 455.65
Rate for 5.50 Cum Rs. 455.65
Rate for 1.00 Cum Rs. 82.85
0.00 add overheads and contractors profit at 0% 82.85 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 82.85

(ii) Unloading charges:


Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.005 day Head mazdoor 285.00 day Rs. 1.43
0.125 day Mazdoor 250.00 day Rs. 31.25
Rs. 32.68
0.00 add area allowance at 0% on Rs. 32.68 Rs. 0.00
Total labour charges Rs. 32.68
b) Machinery:
0.166 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 70.47
capacity @ Rs.
0.166 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 39.69
capacity @ Rs.
0.166 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 19.42
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 19.42 Rs. 0.00
Total machinery charges Rs. 129.58
Total labour and machinery charges Rs. 162.26
Rate for 5.50 Cum Rs. 162.26
Rate for 1.00 Cum Rs. 29.5
0.00 add overheads and contractors profit at 0% 29.50 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 29.50

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish,
Crushed slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.02 day Head mazdoor 285.00 day Rs. 5.70
0.50 day Mazdoor 250.00 day Rs. 125.00
Rs. 130.70
0.00 add area allowance at 0% on Rs. 130.70 Rs. 0.00
Total labour charges Rs. 130.70
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 212.25
capacity @ Rs.
0.50 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 119.55
capacity @ Rs.
0.50 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 58.50
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 58.50 Rs. 0.00
Total machinery charges Rs. 390.30
Total labour and machinery charges Rs. 521.00
Rate for 5.50 Cum Rs. 521.00
Rate for 1.00 Cum Rs. 94.73
0.00 add overheads and contractors profit at 0% 94.73 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 94.73

(ii) Unloading charges:


Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 285.00 day Rs. 2.85
0.25 day Mazdoor 250.00 day Rs. 62.50
Rs. 65.35
0.00 add area allowance at 0% on Rs. 65.35 Rs. 0.00
Total labour charges Rs. 65.35
b) Machinery:
0.25 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 106.13
capacity @ Rs.
0.25 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 59.78
capacity @ Rs.
0.25 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 29.25
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 29.25 Rs. 0.00
Total machinery charges Rs. 195.16
Total labour and machinery charges Rs. 260.51
Rate for 5.50 Cum Rs. 260.51
Rate for 1.00 Cum Rs. 47.37
0.00 add overheads and contractors profit at 0% 47.37 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 47.37

C) For Cement (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.06 day Head mazdoor 285.00 day Rs. 17.10
1.50 day Mazdoor 250.00 day Rs. 375.00
Rs. 392.10
0.00 add area allowance at 0% on Rs. 392.10 Rs. 0.00
Total labour charges Rs. 392.10
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 424.50
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 239.10
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 117.00
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 117.00 Rs. 0.00
Total machinery charges Rs. 780.60
Total labour and machinery charges Rs. 1172.70
Rate for 10.00 MT Rs. 1172.70
Rate for 1.00 MT Rs. 117.27
0.00 add overheads and contractors profit at 0% 117.27 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 117.27

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 285.00 day Rs. 19.95
1.80 day Mazdoor 250.00 day Rs. 450.00
Rs. 469.95
0.00 add area allowance at 0% on Rs. 469.95 Rs. 0.00
Total labour charges Rs. 469.95
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 424.50
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 239.10
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 117.00
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 117.00 Rs. 0.00
Total machinery charges Rs. 780.60
Total labour and machinery charges Rs. 1250.55
Rate for 10.00 MT Rs. 1250.55
Rate for 1.00 MT Rs. 125.06
0.00 add overheads and contractors profit at 0% 125.06 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 125.06

D) For Structural steel, Steel bars (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 285.00 day Rs. 19.95
1.80 day Mazdoor 250.00 day Rs. 450.00
Rs. 469.95
0.00 add area allowance at 0% on Rs. 469.95 Rs. 0.00
Total labour charges Rs. 469.95
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 424.50
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 239.10
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 117.00
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 117.00 Rs. 0.00
Total machinery charges Rs. 780.60
Total labour and machinery charges Rs. 1250.55
Rate for 10.00 MT Rs. 1250.55
Rate for 1.00 MT Rs. 125.06
0.00 add overheads and contractors profit at 0% 125.06 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 125.06

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 285.00 day Rs. 19.95
1.80 day Mazdoor 250.00 day Rs. 450.00
Rs. 469.95
0.00 add area allowance at 0% on Rs. 469.95 Rs. 0.00
Total labour charges Rs. 469.95
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 424.50
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 239.10
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 117.00
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 117.00 Rs. 0.00
Total machinery charges Rs. 780.60
Total labour and machinery charges Rs. 1250.55
Rate for 10.00 MT Rs. 1250.55
Rate for 1.00 MT Rs. 125.06
0.00 add overheads and contractors profit at 0% 125.06 Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 125.06

E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):


(i) Loading charges:
Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.01 day Head mazdoor 285.00 day Rs. 2.85
0.25 day Mazdoor 250.00 day Rs. 62.50
Rs. 65.35
0.00 add area allowance at 0% on Rs. 65.35 Rs. 0.00
Total labour charges Rs. 65.35
b) Machinery:
0.33 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 140.09
capacity @ Rs.
0.33 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 78.90
capacity @ Rs.
0.33 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 38.61
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 38.61 Rs. 0.00
Total machinery charges Rs. 257.60
Total labour and machinery charges Rs. 322.95
Rate for 2000 Nos Rs. 322.95
Rate for 1000 Nos Rs. 161.48
0.00 add overheads and contractors profit at 0% 161.48 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 161.48

(ii) Unloading & Stacking charges:


Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.06 day Head mazdoor 285.00 day Rs. 17.10
1.50 day Mazdoor 250.00 day Rs. 375.00
Rs. 392.10
0.00 add area allowance at 0% on Rs. 392.10 Rs. 0.00
Total labour charges Rs. 392.10
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 424.50 Hour Rs. 424.50
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 239.10 Hour Rs. 239.10
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 117.00 Hour Rs. 117.00
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 117.00 Rs. 0.00
Total machinery charges Rs. 780.60
Total labour and machinery charges Rs. 1172.70
Rate for 2000 Nos Rs. 1172.70
Rate for 1000 Nos Rs. 586.35
0.00 add overheads and contractors profit at 0% 586.35 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 586.35

LOADING & UNLOADING CHARGES BY MECHANICAL MEANS (INCLUDING IDLE HIRE


CHARGES OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Machinery:
0.11 Hrs. hire charges of Tipper 10 Tonnes 424.50 Hour Rs. 46.70
capacity @ Rs.
0.11 Hrs. fuel charges of Tipper 10 Tonnes 239.10 Hour Rs. 26.30
capacity @ Rs.
0.11 Hrs. crew charges of Tipper 10 Tonnes 117.00 Hour Rs. 12.87
capacity @ Rs.
0.06 Hrs. hire charges of FE loader 1.00 Cum 424.50 Hour Rs. 25.47
bucket capacity @ 45 Cum @ Rs.
0.06 Hrs. fuel charges of FE loader 1.00 Cum 239.10 Hour Rs. 14.35
bucket capacity @ 45 Cum @ Rs.
0.06 Hrs. crew charges of FE loader 1.00 Cum 117.00 Hour Rs. 7.02
bucket capacity @ 45 Cum @ Rs.
0.00 add area allowance at 0% on Rs. 19.89 Rs. 0.00
Total machinery charges Rs. 132.71
Rate for 5.50 Cum Rs. 132.71
Rate for 1.00 Cum Rs. 24.13
0.00 add overheads and contractors profit at 0% 24.13 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 24.13
(ii) Unloading charges:
Out put = 5.50 Cum Rate Per Amount
a) Machinery:
0.08 Hrs. hire charges of Tipper 10 Tonnes 424.50 Hour Rs. 33.96
capacity @ Rs.
0.08 Hrs. fuel charges of Tipper 10 Tonnes 239.10 Hour Rs. 19.13
capacity @ Rs.
0.08 Hrs. crew charges of Tipper 10 Tonnes 117.00 Hour Rs. 9.36
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 9.36 Rs. 0.00
Total machinery charges Rs. 62.45
Rate for 5.50 Cum Rs. 62.45
Rate for 1.00 Cum Rs. 11.35
0.00 add overheads and contractors profit at 0% 11.35 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 11.35

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish,
Crushed slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Machinery:
0.17 Hrs. hire charges of Tipper 10 Tonnes 424.50 Hour Rs. 72.17
capacity @ Rs.
0.17 Hrs. fuel charges of Tipper 10 Tonnes 239.10 Hour Rs. 40.65
capacity @ Rs.
0.17 Hrs. crew charges of Tipper 10 Tonnes 117.00 Hour Rs. 19.89
capacity @ Rs.
0.12 Hrs. hire charges of FE loader 1.00 Cum 424.50 Hour Rs. 50.94
bucket capacity @ 45 Cum @ Rs.
0.12 Hrs. fuel charges of FE loader 1.00 Cum 239.10 Hour Rs. 28.69
bucket capacity @ 45 Cum @ Rs.
0.12 Hrs. crew charges of FE loader 1.00 Cum 117.00 Hour Rs. 14.04
bucket capacity @ 45 Cum @ Rs.
0.00 add area allowance at 0% on Rs. 33.93 Rs. 0.00
Total machinery charges Rs. 226.38
Rate for 5.50 Cum Rs. 226.38
Rate for 1.00 Cum Rs. 41.16
0.00 add overheads and contractors profit at 0% 41.16 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 41.16
13 Painting to New walls with two coats of Snowcem cement paint of superior quality of approved brand
and shade over base coat of cement primer grade -I making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered materials, including cost and
conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for External Walls.(APSS No. 912)

Material
Cement Primer Grade I 0.1 Kgs 117.00 1 Kgs 11.70
Snowcem Paint 0.35 Kgs 38.36 1 Kgs 13.43
Labour for Priming Coat
1st class painter 0.021 Nos. 350.00 1 Each 7.35
2nd class painter 0.049 Nos. 300.00 1 Each 14.70
Labour for Two Coats
1st class painter 0.015 Nos. 350.00 1 Each 5.25
2nd class painter 0.035 Nos. 300.00 1 Each 10.50
Man and women mazdoor 0.15 Nos. 250.00 1 Each 37.50
100.43
Add 14% over heads 0.14 100.43 14.06
Rater per 1 Sqmt. Total 114.50

14 Forming embankment with borrowed useful earth from outside road boundary with 5 Km extra lead by
mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal
of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes
PRR Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and
operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H
specification 305 (4th revision)

Unit : Cum
Taking out put = 100 Cum Page 68,69 of MoRT&H SDB
(A) Labour
Mate 0.04 day 188.00 1 day 7.52
Mazdoor unskilled 1.00 day 146.00 1 day 146.00
153.52
(B) Machinery
Rate as per G.O. Ms No 10, Dt 26/7/2005 100 cum 13.00 1 cum 1300.00
Tipper
Add 10%(forof5cost
Km =of160x5 = 800)
carriage to cover cost of 800 t.km 4.50 1 t.km 3600.00
loading and unloading 360.00
Dozer 80 HP for spreading @ 200 cum p/hr 0.50 hr 2760.00 1 hr 1380.00
Water tanker 6 KL 4.00 hr 345.00 1 hr 1380.00
PRR 8-10T Roller 4.00 hr 540.00 1 hr 2160.00
10180.00
© Over head charges @5% (10%-VAT) on (A) + (B) 516.68
(D) Total of (A) + (B)+( C) 10850.20
(F) Add Contractors Profit at 10% on (E) 1085.02
Cost per 100 cum (E) + (F) 11935.22
Rate per Cum 119.35
Basic Rate per Cum. Total 119.00

Asst.Executive Engineer(R&B) Dy.Executive Engineer(R&B)


Section::Madhira Sub-Division::Madhira

Executive Engineer(R&B) Superintending Engineer(R&B)


Division::Khammam: Circle::Khammam:
Lead Chart
Name of Work:-
Construction of Phylon on Khammam-Bonakal Road

Yellandu
Warangal Devarapally

1.00 Kms 1.13 Kms


Suryapet S.A road H-K road
6.70 Kms

B-P road
Crusher at Km.6/7 Km 27/2-4
of K-K road
Working Reach Km 2/3-6
Satupally Vizag
Bonakal

Jaggiahpet Km 25/2-4 Wyra at Km 48/9

Metal Lead Sand Lead (Wyra River)


K-K road 6.70 Kms M-T road from Km 10/6 to 17/1 6.5 Kms
S-A road 1.00 Kms J-W road from Km 33/0 to 41/0 8 Kms
H-K road 1.13 Kms K-B road from 28/030 to 27/6 0.43 Kms
Khammam town 1.00 Kms 14.93
Khammam-Bonakal road from 0/0 to 27/6-8 27.60 Kms Say 15 Kms
37.43
Say 37 Kms

Assistant Exe Engineer, Dy. Executive Engineer,


(R&B) Section :: Madhira (R&B) Sub Division :: Madhira

Executive Engineer, Superintending Engineer,


(R&B) Division :: Khammam (R&B) Circle :: Khammam
CONVEYANCE CHARGES AS PER COMMON SSR 2009 - 2010

PCC
Rubble/Size Cement/Steel/RC
Earth/Sand/ Slabs/Shabad
Sl. Lead in Stone/Cut C poles/A.C & G.I
Gravel/Murru Slabs/CC & Water Bricks
No Kms Stone/Coarse Sheets/Packed
m/Lime/Surki Laterite
aggregates materials
Blocks/Wood
### 1 1.00 0.00 0.00 0.00 0.00 0.00 0.00
2 2.00 9.82 9.82 6.14 14.44 5.74 15.61
3 3.00 21.27 21.27 13.30 31.29 12.43 33.83
4 4.00 31.09 31.09 19.44 45.73 18.17 49.44
5 5.00 40.91 40.91 25.58 60.17 23.91 65.05
6 6.00 50.73 50.73 31.72 74.61 29.65 80.66
7 7.00 60.55 60.55 37.86 89.05 35.39 96.27
8 8.00 70.37 70.37 44.00 103.49 41.13 111.88
9 9.00 80.19 80.19 50.14 117.93 46.87 127.49
10 10.00 90.01 90.01 56.28 132.37 52.61 143.10
11 11.00 99.83 99.83 62.42 146.81 58.35 158.71
12 12.00 109.65 109.65 68.56 161.25 64.09 174.32
13 13.00 119.47 119.47 74.70 175.69 69.83 189.93
14 14.00 129.29 129.29 80.84 190.13 75.57 205.54
15 15.00 139.11 139.11 86.98 204.57 81.31 221.15
16 16.00 148.93 148.93 93.12 219.01 87.05 236.76
17 17.00 158.75 158.75 99.26 233.45 92.79 252.37
18 18.00 168.57 168.57 105.40 247.89 98.53 267.98
19 19.00 178.39 178.39 111.54 262.33 104.27 283.59
20 20.00 188.21 188.21 117.68 276.77 110.01 299.20
21 21.00 198.03 198.03 123.82 291.21 115.75 314.81
22 22.00 207.85 207.85 129.96 305.65 121.49 330.42
23 23.00 217.67 217.67 136.10 320.09 127.23 346.03
24 24.00 227.49 227.49 142.24 334.53 132.97 361.64
25 25.00 237.31 237.31 148.38 348.97 138.71 377.25
26 26.00 247.13 247.13 154.52 363.41 144.45 392.86
27 27.00 256.95 256.95 160.66 377.85 150.19 408.47
28 28.00 266.77 266.77 166.80 392.29 155.93 424.08
29 29.00 276.59 276.59 172.94 406.73 161.67 439.69
30 30.00 286.41 286.41 179.08 421.17 167.41 455.30
31 31.00 294.59 294.59 184.20 433.21 172.19 468.31
32 32.00 302.77 302.77 189.32 445.25 176.97 481.32
33 33.00 310.95 310.95 194.44 457.29 181.75 494.33
34 34.00 319.13 319.13 199.56 469.33 186.53 507.34
35 35.00 327.31 327.31 204.68 481.37 191.31 520.35
36 36.00 335.49 335.49 209.80 493.41 196.09 533.36
37 37.00 343.67 343.67 214.92 505.45 200.87 546.37
38 38.00 351.85 351.85 220.04 517.49 205.65 559.38
39 39.00 360.03 360.03 225.16 529.53 210.43 572.39
40 40.00 368.21 368.21 230.28 541.57 215.21 585.40
41 41.00 376.39 376.39 235.40 553.61 219.99 598.41
42 42.00 384.57 384.57 240.52 565.65 224.77 611.42
43 43.00 392.75 392.75 245.64 577.69 229.55 624.43
44 44.00 400.93 400.93 250.76 589.73 234.33 637.44
45 45.00 409.11 409.11 255.88 601.77 239.11 650.45
46 46.00 417.29 417.29 261.00 613.81 243.89 663.46
47 47.00 425.47 425.47 266.12 625.85 248.67 676.47
48 48.00 433.65 433.65 271.24 637.89 253.45 689.48
49 49.00 441.83 441.83 276.36 649.93 258.23 702.49
50 50.00 450.01 450.01 281.48 661.97 263.01 715.50
51 51.00 458.19 458.19 286.60 674.01 267.79 728.51
52 52.00 466.37 466.37 291.72 686.05 272.57 741.52
53 53.00 474.55 474.55 296.84 698.09 277.35 754.53
54 54.00 482.73 482.73 301.96 710.13 282.13 767.54
55 55.00 490.91 490.91 307.08 722.17 286.91 780.55
56 56.00 499.09 499.09 312.20 734.21 291.69 793.56
57 57.00 507.27 507.27 317.32 746.25 296.47 806.57
58 58.00 515.45 515.45 322.44 758.29 301.25 819.58
59 59.00 523.63 523.63 327.56 770.33 306.03 832.59
60 60.00 531.81 531.81 332.68 782.37 310.81 845.60
61 61.00 539.99 539.99 337.80 794.41 315.59 858.61
62 62.00 548.17 548.17 342.92 806.45 320.37 871.62
63 63.00 556.35 556.35 348.04 818.49 325.15 884.63
64 64.00 564.53 564.53 353.16 830.53 329.93 897.64
65 65.00 572.71 572.71 358.28 842.57 334.71 910.65
66 66.00 580.89 580.89 363.40 854.61 339.49 923.66
67 67.00 589.07 589.07 368.52 866.65 344.27 936.67
68 68.00 597.25 597.25 373.64 878.69 349.05 949.68
69 69.00 605.43 605.43 378.76 890.73 353.83 962.69
70 70.00 613.61 613.61 383.88 902.77 358.61 975.70
71 71.00 621.79 621.79 389.00 914.81 363.39 988.71
72 72.00 629.97 629.97 394.12 926.85 368.17 1001.72
73 73.00 638.15 638.15 399.24 938.89 372.95 1014.73
74 74.00 646.33 646.33 404.36 950.93 377.73 1027.74
75 75.00 654.51 654.51 409.48 962.97 382.51 1040.75
76 76.00 662.69 662.69 414.60 975.01 387.29 1053.76
77 77.00 670.87 670.87 419.72 987.05 392.07 1066.77
78 78.00 679.05 679.05 424.84 999.09 396.85 1079.78
79 79.00 687.23 687.23 429.96 1011.13 401.63 1092.79
80 80.00 695.41 695.41 435.08 1023.17 406.41 1105.80
81 81.00 703.59 703.59 440.20 1035.21 411.19 1118.81
82 82.00 711.77 711.77 445.32 1047.25 415.97 1131.82
83 83.00 719.95 719.95 450.44 1059.29 420.75 1144.83
84 84.00 728.13 728.13 455.56 1071.33 425.53 1157.84
85 85.00 736.31 736.31 460.68 1083.37 430.31 1170.85
86 86.00 744.49 744.49 465.80 1095.41 435.09 1183.86
87 87.00 752.67 752.67 470.92 1107.45 439.87 1196.87
88 88.00 760.85 760.85 476.04 1119.49 444.65 1209.88
89 89.00 769.03 769.03 481.16 1131.53 449.43 1222.89
90 90.00 777.21 777.21 486.28 1143.57 454.21 1235.90
91 91.00 785.39 785.39 491.40 1155.61 458.99 1248.91
92 92.00 793.57 793.57 496.52 1167.65 463.77 1261.92
93 93.00 801.75 801.75 501.64 1179.69 468.55 1274.93
94 94.00 809.93 809.93 506.76 1191.73 473.33 1287.94
95 95.00 818.11 818.11 511.88 1203.77 478.11 1300.95
96 96.00 826.29 826.29 517.00 1215.81 482.89 1313.96
97 97.00 834.47 834.47 522.12 1227.85 487.67 1326.97
98 98.00 842.65 842.65 527.24 1239.89 492.45 1339.98
99 99.00 850.83 850.83 532.36 1251.93 497.23 1352.99
100 100.00 859.01 859.01 537.48 1263.97 502.01 1366.00
101 101.00 867.19 867.19 542.60 1276.01 506.79 1379.01
102 102.00 875.37 875.37 547.72 1288.05 511.57 1392.02
103 103.00 883.55 883.55 552.84 1300.09 516.35 1405.03
104 104.00 891.73 891.73 557.96 1312.13 521.13 1418.04
105 105.00 899.91 899.91 563.08 1324.17 525.91 1431.05
106 106.00 908.09 908.09 568.20 1336.21 530.69 1444.06
107 107.00 916.27 916.27 573.32 1348.25 535.47 1457.07
108 108.00 924.45 924.45 578.44 1360.29 540.25 1470.08
109 109.00 932.63 932.63 583.56 1372.33 545.03 1483.09
110 110.00 940.81 940.81 588.68 1384.37 549.81 1496.10
111 111.00 948.99 948.99 593.80 1396.41 554.59 1509.11
112 112.00 957.17 957.17 598.92 1408.45 559.37 1522.12
113 113.00 965.35 965.35 604.04 1420.49 564.15 1535.13
114 114.00 973.53 973.53 609.16 1432.53 568.93 1548.14
115 115.00 981.71 981.71 614.28 1444.57 573.71 1561.15
116 116.00 989.89 989.89 619.40 1456.61 578.49 1574.16
117 117.00 998.07 998.07 624.52 1468.65 583.27 1587.17
118 118.00 1006.25 1006.25 629.64 1480.69 588.05 1600.18
119 119.00 1014.43 1014.43 634.76 1492.73 592.83 1613.19
120 120.00 1022.61 1022.61 639.88 1504.77 597.61 1626.20
121 121.00 1030.79 1030.79 645.00 1516.81 602.39 1639.21
122 122.00 1038.97 1038.97 650.12 1528.85 607.17 1652.22
123 123.00 1047.15 1047.15 655.24 1540.89 611.95 1665.23
124 124.00 1055.33 1055.33 660.36 1552.93 616.73 1678.24
125 125.00 1063.51 1063.51 665.48 1564.97 621.51 1691.25
126 126.00 1071.69 1071.69 670.60 1577.01 626.29 1704.26
127 127.00 1079.87 1079.87 675.72 1589.05 631.07 1717.27
128 128.00 1088.05 1088.05 680.84 1601.09 635.85 1730.28
129 129.00 1096.23 1096.23 685.96 1613.13 640.63 1743.29
130 130.00 1104.41 1104.41 691.08 1625.17 645.41 1756.30
131 131.00 1112.59 1112.59 696.20 1637.21 650.19 1769.31
132 132.00 1120.77 1120.77 701.32 1649.25 654.97 1782.32
133 133.00 1128.95 1128.95 706.44 1661.29 659.75 1795.33
134 134.00 1137.13 1137.13 711.56 1673.33 664.53 1808.34
135 135.00 1145.31 1145.31 716.68 1685.37 669.31 1821.35
136 136.00 1153.49 1153.49 721.80 1697.41 674.09 1834.36
137 137.00 1161.67 1161.67 726.92 1709.45 678.87 1847.37
138 138.00 1169.85 1169.85 732.04 1721.49 683.65 1860.38
139 139.00 1178.03 1178.03 737.16 1733.53 688.43 1873.39
140 140.00 1186.21 1186.21 742.28 1745.57 693.21 1886.40
141 141.00 1194.39 1194.39 747.40 1757.61 697.99 1899.41
142 142.00 1202.57 1202.57 752.52 1769.65 702.77 1912.42
143 143.00 1210.75 1210.75 757.64 1781.69 707.55 1925.43
144 144.00 1218.93 1218.93 762.76 1793.73 712.33 1938.44
145 145.00 1227.11 1227.11 767.88 1805.77 717.11 1951.45
146 146.00 1235.29 1235.29 773.00 1817.81 721.89 1964.46
147 147.00 1243.47 1243.47 778.12 1829.85 726.67 1977.47
148 148.00 1251.65 1251.65 783.24 1841.89 731.45 1990.48
149 149.00 1259.83 1259.83 788.36 1853.93 736.23 2003.49
150 150.00 1268.01 1268.01 793.48 1865.97 741.01 2016.50
151 151.00 1276.19 1276.19 798.60 1878.01 745.79 2029.51
152 152.00 1284.37 1284.37 803.72 1890.05 750.57 2042.52
153 153.00 1292.55 1292.55 808.84 1902.09 755.35 2055.53
154 154.00 1300.73 1300.73 813.96 1914.13 760.13 2068.54
155 155.00 1308.91 1308.91 819.08 1926.17 764.91 2081.55
156 156.00 1317.09 1317.09 824.20 1938.21 769.69 2094.56
157 157.00 1325.27 1325.27 829.32 1950.25 774.47 2107.57
158 158.00 1333.45 1333.45 834.44 1962.29 779.25 2120.58
159 159.00 1341.63 1341.63 839.56 1974.33 784.03 2133.59
160 160.00 1349.81 1349.81 844.68 1986.37 788.81 2146.60
161 161.00 1357.99 1357.99 849.80 1998.41 793.59 2159.61
162 162.00 1366.17 1366.17 854.92 2010.45 798.37 2172.62
163 163.00 1374.35 1374.35 860.04 2022.49 803.15 2185.63
164 164.00 1382.53 1382.53 865.16 2034.53 807.93 2198.64
165 165.00 1390.71 1390.71 870.28 2046.57 812.71 2211.65
166 166.00 1398.89 1398.89 875.40 2058.61 817.49 2224.66
167 167.00 1407.07 1407.07 880.52 2070.65 822.27 2237.67
168 168.00 1415.25 1415.25 885.64 2082.69 827.05 2250.68
169 169.00 1423.43 1423.43 890.76 2094.73 831.83 2263.69
170 170.00 1431.61 1431.61 895.88 2106.77 836.61 2276.70
171 171.00 1439.79 1439.79 901.00 2118.81 841.39 2289.71
172 172.00 1447.97 1447.97 906.12 2130.85 846.17 2302.72
173 173.00 1456.15 1456.15 911.24 2142.89 850.95 2315.73
174 174.00 1464.33 1464.33 916.36 2154.93 855.73 2328.74
175 175.00 1472.51 1472.51 921.48 2166.97 860.51 2341.75
176 176.00 1480.69 1480.69 926.60 2179.01 865.29 2354.76
177 177.00 1488.87 1488.87 931.72 2191.05 870.07 2367.77
178 178.00 1497.05 1497.05 936.84 2203.09 874.85 2380.78
179 179.00 1505.23 1505.23 941.96 2215.13 879.63 2393.79
180 180.00 1513.41 1513.41 947.08 2227.17 884.41 2406.80
181 181.00 1521.59 1521.59 952.20 2239.21 889.19 2419.81
182 182.00 1529.77 1529.77 957.32 2251.25 893.97 2432.82
183 183.00 1537.95 1537.95 962.44 2263.29 898.75 2445.83
184 184.00 1546.13 1546.13 967.56 2275.33 903.53 2458.84
185 185.00 1554.31 1554.31 972.68 2287.37 908.31 2471.85
186 186.00 1562.49 1562.49 977.80 2299.41 913.09 2484.86
187 187.00 1570.67 1570.67 982.92 2311.45 917.87 2497.87
188 188.00 1578.85 1578.85 988.04 2323.49 922.65 2510.88
189 189.00 1587.03 1587.03 993.16 2335.53 927.43 2523.89
190 190.00 1595.21 1595.21 998.28 2347.57 932.21 2536.90
191 191.00 1603.39 1603.39 1003.40 2359.61 936.99 2549.91
192 192.00 1611.57 1611.57 1008.52 2371.65 941.77 2562.92
193 193.00 1619.75 1619.75 1013.64 2383.69 946.55 2575.93
194 194.00 1627.93 1627.93 1018.76 2395.73 951.33 2588.94
195 195.00 1636.11 1636.11 1023.88 2407.77 956.11 2601.95
196 196.00 1644.29 1644.29 1029.00 2419.81 960.89 2614.96
197 197.00 1652.47 1652.47 1034.12 2431.85 965.67 2627.97
198 198.00 1660.65 1660.65 1039.24 2443.89 970.45 2640.98
199 199.00 1668.83 1668.83 1044.36 2455.93 975.23 2653.99
200 200.00 1677.01 1677.01 1049.48 2467.97 980.01 2667.00
201 201.00 1685.19 1685.19 1054.60 2480.01 984.79 2680.01
202 202.00 1693.37 1693.37 1059.72 2492.05 989.57 2693.02
203 203.00 1701.55 1701.55 1064.84 2504.09 994.35 2706.03
204 204.00 1709.73 1709.73 1069.96 2516.13 999.13 2719.04
205 205.00 1717.91 1717.91 1075.08 2528.17 1003.91 2732.05
206 206.00 1726.09 1726.09 1080.20 2540.21 1008.69 2745.06
207 207.00 1734.27 1734.27 1085.32 2552.25 1013.47 2758.07
208 208.00 1742.45 1742.45 1090.44 2564.29 1018.25 2771.08
209 209.00 1750.63 1750.63 1095.56 2576.33 1023.03 2784.09
210 210.00 1758.81 1758.81 1100.68 2588.37 1027.81 2797.10
211 211.00 1766.99 1766.99 1105.80 2600.41 1032.59 2810.11
212 212.00 1775.17 1775.17 1110.92 2612.45 1037.37 2823.12
213 213.00 1783.35 1783.35 1116.04 2624.49 1042.15 2836.13
214 214.00 1791.53 1791.53 1121.16 2636.53 1046.93 2849.14
215 215.00 1799.71 1799.71 1126.28 2648.57 1051.71 2862.15
216 216.00 1807.89 1807.89 1131.40 2660.61 1056.49 2875.16
217 217.00 1816.07 1816.07 1136.52 2672.65 1061.27 2888.17
218 218.00 1824.25 1824.25 1141.64 2684.69 1066.05 2901.18
219 219.00 1832.43 1832.43 1146.76 2696.73 1070.83 2914.19
220 220.00 1840.61 1840.61 1151.88 2708.77 1075.61 2927.20
221 221.00 1848.79 1848.79 1157.00 2720.81 1080.39 2940.21
222 222.00 1856.97 1856.97 1162.12 2732.85 1085.17 2953.22
223 223.00 1865.15 1865.15 1167.24 2744.89 1089.95 2966.23
224 224.00 1873.33 1873.33 1172.36 2756.93 1094.73 2979.24
225 225.00 1881.51 1881.51 1177.48 2768.97 1099.51 2992.25
226 226.00 1889.69 1889.69 1182.60 2781.01 1104.29 3005.26
227 227.00 1897.87 1897.87 1187.72 2793.05 1109.07 3018.27
228 228.00 1906.05 1906.05 1192.84 2805.09 1113.85 3031.28
229 229.00 1914.23 1914.23 1197.96 2817.13 1118.63 3044.29
230 230.00 1922.41 1922.41 1203.08 2829.17 1123.41 3057.30
231 231.00 1930.59 1930.59 1208.20 2841.21 1128.19 3070.31
232 232.00 1938.77 1938.77 1213.32 2853.25 1132.97 3083.32
233 233.00 1946.95 1946.95 1218.44 2865.29 1137.75 3096.33
234 234.00 1955.13 1955.13 1223.56 2877.33 1142.53 3109.34
235 235.00 1963.31 1963.31 1228.68 2889.37 1147.31 3122.35
236 236.00 1971.49 1971.49 1233.80 2901.41 1152.09 3135.36
237 237.00 1979.67 1979.67 1238.92 2913.45 1156.87 3148.37
238 238.00 1987.85 1987.85 1244.04 2925.49 1161.65 3161.38
239 239.00 1996.03 1996.03 1249.16 2937.53 1166.43 3174.39
240 240.00 2004.21 2004.21 1254.28 2949.57 1171.21 3187.40
241 241.00 2012.39 2012.39 1259.40 2961.61 1175.99 3200.41
242 242.00 2020.57 2020.57 1264.52 2973.65 1180.77 3213.42
243 243.00 2028.75 2028.75 1269.64 2985.69 1185.55 3226.43
244 244.00 2036.93 2036.93 1274.76 2997.73 1190.33 3239.44
245 245.00 2045.11 2045.11 1279.88 3009.77 1195.11 3252.45
246 246.00 2053.29 2053.29 1285.00 3021.81 1199.89 3265.46
247 247.00 2061.47 2061.47 1290.12 3033.85 1204.67 3278.47
248 248.00 2069.65 2069.65 1295.24 3045.89 1209.45 3291.48
249 249.00 2077.83 2077.83 1300.36 3057.93 1214.23 3304.49
250 250.00 2086.01 2086.01 1305.48 3069.97 1219.01 3317.50
251 251.00 2094.19 2094.19 1310.60 3082.01 1223.79 3330.51
252 252.00 2102.37 2102.37 1315.72 3094.05 1228.57 3343.52
253 253.00 2110.55 2110.55 1320.84 3106.09 1233.35 3356.53
254 254.00 2118.73 2118.73 1325.96 3118.13 1238.13 3369.54
255 255.00 2126.91 2126.91 1331.08 3130.17 1242.91 3382.55
256 256.00 2135.09 2135.09 1336.20 3142.21 1247.69 3395.56
257 257.00 2143.27 2143.27 1341.32 3154.25 1252.47 3408.57
258 258.00 2151.45 2151.45 1346.44 3166.29 1257.25 3421.58
259 259.00 2159.63 2159.63 1351.56 3178.33 1262.03 3434.59
260 260.00 2167.81 2167.81 1356.68 3190.37 1266.81 3447.60
261 261.00 2175.99 2175.99 1361.80 3202.41 1271.59 3460.61
262 262.00 2184.17 2184.17 1366.92 3214.45 1276.37 3473.62
263 263.00 2192.35 2192.35 1372.04 3226.49 1281.15 3486.63
264 264.00 2200.53 2200.53 1377.16 3238.53 1285.93 3499.64
265 265.00 2208.71 2208.71 1382.28 3250.57 1290.71 3512.65
266 266.00 2216.89 2216.89 1387.40 3262.61 1295.49 3525.66
267 267.00 2225.07 2225.07 1392.52 3274.65 1300.27 3538.67
268 268.00 2233.25 2233.25 1397.64 3286.69 1305.05 3551.68
269 269.00 2241.43 2241.43 1402.76 3298.73 1309.83 3564.69
270 270.00 2249.61 2249.61 1407.88 3310.77 1314.61 3577.70
271 271.00 2257.79 2257.79 1413.00 3322.81 1319.39 3590.71
272 272.00 2265.97 2265.97 1418.12 3334.85 1324.17 3603.72
273 273.00 2274.15 2274.15 1423.24 3346.89 1328.95 3616.73
274 274.00 2282.33 2282.33 1428.36 3358.93 1333.73 3629.74
275 275.00 2290.51 2290.51 1433.48 3370.97 1338.51 3642.75
276 276.00 2298.69 2298.69 1438.60 3383.01 1343.29 3655.76
277 277.00 2306.87 2306.87 1443.72 3395.05 1348.07 3668.77
278 278.00 2315.05 2315.05 1448.84 3407.09 1352.85 3681.78
279 279.00 2323.23 2323.23 1453.96 3419.13 1357.63 3694.79
280 280.00 2331.41 2331.41 1459.08 3431.17 1362.41 3707.80
281 281.00 2339.59 2339.59 1464.20 3443.21 1367.19 3720.81
282 282.00 2347.77 2347.77 1469.32 3455.25 1371.97 3733.82
283 283.00 2355.95 2355.95 1474.44 3467.29 1376.75 3746.83
284 284.00 2364.13 2364.13 1479.56 3479.33 1381.53 3759.84
285 285.00 2372.31 2372.31 1484.68 3491.37 1386.31 3772.85
286 286.00 2380.49 2380.49 1489.80 3503.41 1391.09 3785.86
287 287.00 2388.67 2388.67 1494.92 3515.45 1395.87 3798.87
288 288.00 2396.85 2396.85 1500.04 3527.49 1400.65 3811.88
289 289.00 2405.03 2405.03 1505.16 3539.53 1405.43 3824.89
290 290.00 2413.21 2413.21 1510.28 3551.57 1410.21 3837.90
291 291.00 2421.39 2421.39 1515.40 3563.61 1414.99 3850.91
292 292.00 2429.57 2429.57 1520.52 3575.65 1419.77 3863.92
293 293.00 2437.75 2437.75 1525.64 3587.69 1424.55 3876.93
294 294.00 2445.93 2445.93 1530.76 3599.73 1429.33 3889.94
295 295.00 2454.11 2454.11 1535.88 3611.77 1434.11 3902.95
296 296.00 2462.29 2462.29 1541.00 3623.81 1438.89 3915.96
297 297.00 2470.47 2470.47 1546.12 3635.85 1443.67 3928.97
298 298.00 2478.65 2478.65 1551.24 3647.89 1448.45 3941.98
299 299.00 2486.83 2486.83 1556.36 3659.93 1453.23 3954.99
300 300.00 2495.01 2495.01 1561.48 3671.97 1458.01 3968.00
301 301.00 2503.19 2503.19 1566.60 3684.01 1462.79 3981.01
302 302.00 2511.37 2511.37 1571.72 3696.05 1467.57 3994.02
303 303.00 2519.55 2519.55 1576.84 3708.09 1472.35 4007.03
304 304.00 2527.73 2527.73 1581.96 3720.13 1477.13 4020.04
305 305.00 2535.91 2535.91 1587.08 3732.17 1481.91 4033.05
306 306.00 2544.09 2544.09 1592.20 3744.21 1486.69 4046.06
307 307.00 2552.27 2552.27 1597.32 3756.25 1491.47 4059.07
308 308.00 2560.45 2560.45 1602.44 3768.29 1496.25 4072.08
309 309.00 2568.63 2568.63 1607.56 3780.33 1501.03 4085.09
310 310.00 2576.81 2576.81 1612.68 3792.37 1505.81 4098.10
311 311.00 2584.99 2584.99 1617.80 3804.41 1510.59 4111.11
312 312.00 2593.17 2593.17 1622.92 3816.45 1515.37 4124.12
313 313.00 2601.35 2601.35 1628.04 3828.49 1520.15 4137.13
314 314.00 2609.53 2609.53 1633.16 3840.53 1524.93 4150.14
315 315.00 2617.71 2617.71 1638.28 3852.57 1529.71 4163.15
316 316.00 2625.89 2625.89 1643.40 3864.61 1534.49 4176.16
317 317.00 2634.07 2634.07 1648.52 3876.65 1539.27 4189.17
318 318.00 2642.25 2642.25 1653.64 3888.69 1544.05 4202.18
319 319.00 2650.43 2650.43 1658.76 3900.73 1548.83 4215.19
320 320.00 2658.61 2658.61 1663.88 3912.77 1553.61 4228.20
321 321.00 2666.79 2666.79 1669.00 3924.81 1558.39 4241.21
322 322.00 2674.97 2674.97 1674.12 3936.85 1563.17 4254.22
323 323.00 2683.15 2683.15 1679.24 3948.89 1567.95 4267.23
324 324.00 2691.33 2691.33 1684.36 3960.93 1572.73 4280.24
325 325.00 2699.51 2699.51 1689.48 3972.97 1577.51 4293.25
326 326.00 2707.69 2707.69 1694.60 3985.01 1582.29 4306.26
327 327.00 2715.87 2715.87 1699.72 3997.05 1587.07 4319.27
328 328.00 2724.05 2724.05 1704.84 4009.09 1591.85 4332.28
329 329.00 2732.23 2732.23 1709.96 4021.13 1596.63 4345.29
330 330.00 2740.41 2740.41 1715.08 4033.17 1601.41 4358.30
331 331.00 2748.59 2748.59 1720.20 4045.21 1606.19 4371.31
332 332.00 2756.77 2756.77 1725.32 4057.25 1610.97 4384.32
333 333.00 2764.95 2764.95 1730.44 4069.29 1615.75 4397.33
334 334.00 2773.13 2773.13 1735.56 4081.33 1620.53 4410.34
335 335.00 2781.31 2781.31 1740.68 4093.37 1625.31 4423.35
336 336.00 2789.49 2789.49 1745.80 4105.41 1630.09 4436.36
337 337.00 2797.67 2797.67 1750.92 4117.45 1634.87 4449.37
338 338.00 2805.85 2805.85 1756.04 4129.49 1639.65 4462.38
339 339.00 2814.03 2814.03 1761.16 4141.53 1644.43 4475.39
340 340.00 2822.21 2822.21 1766.28 4153.57 1649.21 4488.40
341 341.00 2830.39 2830.39 1771.40 4165.61 1653.99 4501.41
342 342.00 2838.57 2838.57 1776.52 4177.65 1658.77 4514.42
343 343.00 2846.75 2846.75 1781.64 4189.69 1663.55 4527.43
344 344.00 2854.93 2854.93 1786.76 4201.73 1668.33 4540.44
345 345.00 2863.11 2863.11 1791.88 4213.77 1673.11 4553.45
346 346.00 2871.29 2871.29 1797.00 4225.81 1677.89 4566.46
347 347.00 2879.47 2879.47 1802.12 4237.85 1682.67 4579.47
348 348.00 2887.65 2887.65 1807.24 4249.89 1687.45 4592.48
349 349.00 2895.83 2895.83 1812.36 4261.93 1692.23 4605.49
350 350.00 2904.01 2904.01 1817.48 4273.97 1697.01 4618.50
351 351.00 2912.19 2912.19 1822.60 4286.01 1701.79 4631.51
352 352.00 2920.37 2920.37 1827.72 4298.05 1706.57 4644.52
353 353.00 2928.55 2928.55 1832.84 4310.09 1711.35 4657.53
354 354.00 2936.73 2936.73 1837.96 4322.13 1716.13 4670.54
355 355.00 2944.91 2944.91 1843.08 4334.17 1720.91 4683.55
356 356.00 2953.09 2953.09 1848.20 4346.21 1725.69 4696.56
357 357.00 2961.27 2961.27 1853.32 4358.25 1730.47 4709.57
358 358.00 2969.45 2969.45 1858.44 4370.29 1735.25 4722.58
359 359.00 2977.63 2977.63 1863.56 4382.33 1740.03 4735.59
360 360.00 2985.81 2985.81 1868.68 4394.37 1744.81 4748.60
361 361.00 2993.99 2993.99 1873.80 4406.41 1749.59 4761.61
362 362.00 3002.17 3002.17 1878.92 4418.45 1754.37 4774.62
363 363.00 3010.35 3010.35 1884.04 4430.49 1759.15 4787.63
364 364.00 3018.53 3018.53 1889.16 4442.53 1763.93 4800.64
365 365.00 3026.71 3026.71 1894.28 4454.57 1768.71 4813.65
366 366.00 3034.89 3034.89 1899.40 4466.61 1773.49 4826.66
367 367.00 3043.07 3043.07 1904.52 4478.65 1778.27 4839.67
368 368.00 3051.25 3051.25 1909.64 4490.69 1783.05 4852.68
369 369.00 3059.43 3059.43 1914.76 4502.73 1787.83 4865.69
370 370.00 3067.61 3067.61 1919.88 4514.77 1792.61 4878.70
371 371.00 3075.79 3075.79 1925.00 4526.81 1797.39 4891.71
372 372.00 3083.97 3083.97 1930.12 4538.85 1802.17 4904.72
373 373.00 3092.15 3092.15 1935.24 4550.89 1806.95 4917.73
374 374.00 3100.33 3100.33 1940.36 4562.93 1811.73 4930.74
375 375.00 3108.51 3108.51 1945.48 4574.97 1816.51 4943.75
376 376.00 3116.69 3116.69 1950.60 4587.01 1821.29 4956.76
377 377.00 3124.87 3124.87 1955.72 4599.05 1826.07 4969.77
378 378.00 3133.05 3133.05 1960.84 4611.09 1830.85 4982.78
379 379.00 3141.23 3141.23 1965.96 4623.13 1835.63 4995.79
380 380.00 3149.41 3149.41 1971.08 4635.17 1840.41 5008.80
381 381.00 3157.59 3157.59 1976.20 4647.21 1845.19 5021.81
382 382.00 3165.77 3165.77 1981.32 4659.25 1849.97 5034.82
383 383.00 3173.95 3173.95 1986.44 4671.29 1854.75 5047.83
384 384.00 3182.13 3182.13 1991.56 4683.33 1859.53 5060.84
385 385.00 3190.31 3190.31 1996.68 4695.37 1864.31 5073.85
386 386.00 3198.49 3198.49 2001.80 4707.41 1869.09 5086.86
387 387.00 3206.67 3206.67 2006.92 4719.45 1873.87 5099.87
388 388.00 3214.85 3214.85 2012.04 4731.49 1878.65 5112.88
389 389.00 3223.03 3223.03 2017.16 4743.53 1883.43 5125.89
390 390.00 3231.21 3231.21 2022.28 4755.57 1888.21 5138.90
391 391.00 3239.39 3239.39 2027.40 4767.61 1892.99 5151.91
392 392.00 3247.57 3247.57 2032.52 4779.65 1897.77 5164.92
393 393.00 3255.75 3255.75 2037.64 4791.69 1902.55 5177.93
394 394.00 3263.93 3263.93 2042.76 4803.73 1907.33 5190.94
395 395.00 3272.11 3272.11 2047.88 4815.77 1912.11 5203.95
396 396.00 3280.29 3280.29 2053.00 4827.81 1916.89 5216.96
397 397.00 3288.47 3288.47 2058.12 4839.85 1921.67 5229.97
398 398.00 3296.65 3296.65 2063.24 4851.89 1926.45 5242.98
399 399.00 3304.83 3304.83 2068.36 4863.93 1931.23 5255.99
400 400.00 3313.01 3313.01 2073.48 4875.97 1936.01 5269.00
401 401.00 3321.19 3321.19 2078.60 4888.01 1940.79 5282.01
402 402.00 3329.37 3329.37 2083.72 4900.05 1945.57 5295.02
403 403.00 3337.55 3337.55 2088.84 4912.09 1950.35 5308.03
404 404.00 3345.73 3345.73 2093.96 4924.13 1955.13 5321.04
405 405.00 3353.91 3353.91 2099.08 4936.17 1959.91 5334.05
406 406.00 3362.09 3362.09 2104.20 4948.21 1964.69 5347.06
407 407.00 3370.27 3370.27 2109.32 4960.25 1969.47 5360.07
408 408.00 3378.45 3378.45 2114.44 4972.29 1974.25 5373.08
409 409.00 3386.63 3386.63 2119.56 4984.33 1979.03 5386.09
410 410.00 3394.81 3394.81 2124.68 4996.37 1983.81 5399.10
411 411.00 3402.99 3402.99 2129.80 5008.41 1988.59 5412.11
412 412.00 3411.17 3411.17 2134.92 5020.45 1993.37 5425.12
413 413.00 3419.35 3419.35 2140.04 5032.49 1998.15 5438.13
414 414.00 3427.53 3427.53 2145.16 5044.53 2002.93 5451.14
415 415.00 3435.71 3435.71 2150.28 5056.57 2007.71 5464.15
416 416.00 3443.89 3443.89 2155.40 5068.61 2012.49 5477.16
417 417.00 3452.07 3452.07 2160.52 5080.65 2017.27 5490.17
418 418.00 3460.25 3460.25 2165.64 5092.69 2022.05 5503.18
419 419.00 3468.43 3468.43 2170.76 5104.73 2026.83 5516.19
420 420.00 3476.61 3476.61 2175.88 5116.77 2031.61 5529.20
421 421.00 3484.79 3484.79 2181.00 5128.81 2036.39 5542.21
422 422.00 3492.97 3492.97 2186.12 5140.85 2041.17 5555.22
423 423.00 3501.15 3501.15 2191.24 5152.89 2045.95 5568.23
424 424.00 3509.33 3509.33 2196.36 5164.93 2050.73 5581.24
425 425.00 3517.51 3517.51 2201.48 5176.97 2055.51 5594.25
426 426.00 3525.69 3525.69 2206.60 5189.01 2060.29 5607.26
427 427.00 3533.87 3533.87 2211.72 5201.05 2065.07 5620.27
428 428.00 3542.05 3542.05 2216.84 5213.09 2069.85 5633.28
429 429.00 3550.23 3550.23 2221.96 5225.13 2074.63 5646.29
430 430.00 3558.41 3558.41 2227.08 5237.17 2079.41 5659.30
431 431.00 3566.59 3566.59 2232.20 5249.21 2084.19 5672.31
432 432.00 3574.77 3574.77 2237.32 5261.25 2088.97 5685.32
433 433.00 3582.95 3582.95 2242.44 5273.29 2093.75 5698.33
434 434.00 3591.13 3591.13 2247.56 5285.33 2098.53 5711.34
435 435.00 3599.31 3599.31 2252.68 5297.37 2103.31 5724.35
436 436.00 3607.49 3607.49 2257.80 5309.41 2108.09 5737.36
437 437.00 3615.67 3615.67 2262.92 5321.45 2112.87 5750.37
438 438.00 3623.85 3623.85 2268.04 5333.49 2117.65 5763.38
439 439.00 3632.03 3632.03 2273.16 5345.53 2122.43 5776.39
440 440.00 3640.21 3640.21 2278.28 5357.57 2127.21 5789.40
441 441.00 3648.39 3648.39 2283.40 5369.61 2131.99 5802.41
442 442.00 3656.57 3656.57 2288.52 5381.65 2136.77 5815.42
443 443.00 3664.75 3664.75 2293.64 5393.69 2141.55 5828.43
444 444.00 3672.93 3672.93 2298.76 5405.73 2146.33 5841.44
445 445.00 3681.11 3681.11 2303.88 5417.77 2151.11 5854.45
446 446.00 3689.29 3689.29 2309.00 5429.81 2155.89 5867.46
447 447.00 3697.47 3697.47 2314.12 5441.85 2160.67 5880.47
448 448.00 3705.65 3705.65 2319.24 5453.89 2165.45 5893.48
449 449.00 3713.83 3713.83 2324.36 5465.93 2170.23 5906.49
450 450.00 3722.01 3722.01 2329.48 5477.97 2175.01 5919.50
451 451.00 3730.19 3730.19 2334.60 5490.01 2179.79 5932.51
452 452.00 3738.37 3738.37 2339.72 5502.05 2184.57 5945.52
453 453.00 3746.55 3746.55 2344.84 5514.09 2189.35 5958.53
454 454.00 3754.73 3754.73 2349.96 5526.13 2194.13 5971.54
455 455.00 3762.91 3762.91 2355.08 5538.17 2198.91 5984.55
456 456.00 3771.09 3771.09 2360.20 5550.21 2203.69 5997.56
457 457.00 3779.27 3779.27 2365.32 5562.25 2208.47 6010.57
458 458.00 3787.45 3787.45 2370.44 5574.29 2213.25 6023.58
459 459.00 3795.63 3795.63 2375.56 5586.33 2218.03 6036.59
460 460.00 3803.81 3803.81 2380.68 5598.37 2222.81 6049.60
461 461.00 3811.99 3811.99 2385.80 5610.41 2227.59 6062.61
462 462.00 3820.17 3820.17 2390.92 5622.45 2232.37 6075.62
463 463.00 3828.35 3828.35 2396.04 5634.49 2237.15 6088.63
464 464.00 3836.53 3836.53 2401.16 5646.53 2241.93 6101.64
465 465.00 3844.71 3844.71 2406.28 5658.57 2246.71 6114.65
466 466.00 3852.89 3852.89 2411.40 5670.61 2251.49 6127.66
467 467.00 3861.07 3861.07 2416.52 5682.65 2256.27 6140.67
468 468.00 3869.25 3869.25 2421.64 5694.69 2261.05 6153.68
469 469.00 3877.43 3877.43 2426.76 5706.73 2265.83 6166.69
470 470.00 3885.61 3885.61 2431.88 5718.77 2270.61 6179.70
471 471.00 3893.79 3893.79 2437.00 5730.81 2275.39 6192.71
472 472.00 3901.97 3901.97 2442.12 5742.85 2280.17 6205.72
473 473.00 3910.15 3910.15 2447.24 5754.89 2284.95 6218.73
474 474.00 3918.33 3918.33 2452.36 5766.93 2289.73 6231.74
475 475.00 3926.51 3926.51 2457.48 5778.97 2294.51 6244.75
476 476.00 3934.69 3934.69 2462.60 5791.01 2299.29 6257.76
477 477.00 3942.87 3942.87 2467.72 5803.05 2304.07 6270.77
478 478.00 3951.05 3951.05 2472.84 5815.09 2308.85 6283.78
479 479.00 3959.23 3959.23 2477.96 5827.13 2313.63 6296.79
480 480.00 3967.41 3967.41 2483.08 5839.17 2318.41 6309.80
481 481.00 3975.59 3975.59 2488.20 5851.21 2323.19 6322.81
482 482.00 3983.77 3983.77 2493.32 5863.25 2327.97 6335.82
483 483.00 3991.95 3991.95 2498.44 5875.29 2332.75 6348.83
484 484.00 4000.13 4000.13 2503.56 5887.33 2337.53 6361.84
485 485.00 4008.31 4008.31 2508.68 5899.37 2342.31 6374.85
486 486.00 4016.49 4016.49 2513.80 5911.41 2347.09 6387.86
487 487.00 4024.67 4024.67 2518.92 5923.45 2351.87 6400.87
488 488.00 4032.85 4032.85 2524.04 5935.49 2356.65 6413.88
489 489.00 4041.03 4041.03 2529.16 5947.53 2361.43 6426.89
490 490.00 4049.21 4049.21 2534.28 5959.57 2366.21 6439.90
491 491.00 4057.39 4057.39 2539.40 5971.61 2370.99 6452.91
492 492.00 4065.57 4065.57 2544.52 5983.65 2375.77 6465.92
493 493.00 4073.75 4073.75 2549.64 5995.69 2380.55 6478.93
494 494.00 4081.93 4081.93 2554.76 6007.73 2385.33 6491.94
495 495.00 4090.11 4090.11 2559.88 6019.77 2390.11 6504.95
496 496.00 4098.29 4098.29 2565.00 6031.81 2394.89 6517.96
497 497.00 4106.47 4106.47 2570.12 6043.85 2399.67 6530.97
498 498.00 4114.65 4114.65 2575.24 6055.89 2404.45 6543.98
499 499.00 4122.83 4122.83 2580.36 6067.93 2409.23 6556.99
500 500.00 4131.01 4131.01 2585.48 6079.97 2414.01 6570.00
501 501.00 4139.19 4139.19 2590.60 6092.01 2418.79 6583.01
502 502.00 4147.37 4147.37 2595.72 6104.05 2423.57 6596.02
503 503.00 4155.55 4155.55 2600.84 6116.09 2428.35 6609.03
504 504.00 4163.73 4163.73 2605.96 6128.13 2433.13 6622.04
505 505.00 4171.91 4171.91 2611.08 6140.17 2437.91 6635.05
506 506.00 4180.09 4180.09 2616.20 6152.21 2442.69 6648.06
507 507.00 4188.27 4188.27 2621.32 6164.25 2447.47 6661.07
508 508.00 4196.45 4196.45 2626.44 6176.29 2452.25 6674.08
509 509.00 4204.63 4204.63 2631.56 6188.33 2457.03 6687.09
510 510.00 4212.81 4212.81 2636.68 6200.37 2461.81 6700.10
511 511.00 4220.99 4220.99 2641.80 6212.41 2466.59 6713.11
512 512.00 4229.17 4229.17 2646.92 6224.45 2471.37 6726.12
513 513.00 4237.35 4237.35 2652.04 6236.49 2476.15 6739.13
514 514.00 4245.53 4245.53 2657.16 6248.53 2480.93 6752.14
515 515.00 4253.71 4253.71 2662.28 6260.57 2485.71 6765.15