Geotechnical Structure Failure
Geotechnical Structure Failure
BS in Civil Engineering
FOUNDATION ENGINEERING
RESEARCH
FEBRUARY 20,2020
The collapse of Lotus Riverside Block 7 ( 13-story appartment) in Minhang District, Shanghai, China in 2009 is an
accident that killed one person, the building is under construction. In the
investigation said that it has improper construction method that result the
building collapse. The news said due to the construction company’s
ignorance, rather than the flaws in the design or building materials cause
the building to collapse.
Recommendation
This collapse could have been prevented if inclinometers were installed on the foundation slab which would
measure a small inclination before a final collapse. Also they must use better quality of materials in constructing of
structure.
Reference
https://youtu.be/DS14ysmr6gA
https://en.m.wikipedia.org/wiki/Collapse_of_Lotus_Riverside_Block_7
https://www.wsj.com/amp/articles/BL-CJB-2867?responsive=y
Road collapsed in Nanning City in Guangxi China, the road is near a construction site foundation pit of
a new building office. The failure of the foundation causes the road to collapse. The collapse area was about
60m long and 15m wide with a volume of 4500 cu.meter.
In my research, ive searched that before the road collapse, the road has been reported for having a
40cm cracked but the construction company works continued after the expert considered that the situation
was still safe. In the report the causes of the road to collapse was the retaining wall of the side of construction
has been deformed due to the movement of the soil. There are some important factors that could have
affected the occurrence of this incident. Some are the insufficient of the anchor supporting the retaining wall.
The potential failure surfaces due to active failure and shear failure. Some are the leakage from the pipe
caused the increase in pore water pressure acting on the back of the wall, which reduced the safety factor of
the retaining wall.
Recommendation
Risk assessment should be conducted initially. Monitoring and supervision of works should be
prioritized to ensure that every incident or anomaly is reported so that the appropriate action can be taken by
the person incharge. An effective monitoring system involving by engaging third party health and safety
inspector could increase monitoring efficeincy.