Hourly Production Follow-up SG Engineering - Manufacturing Group Form No:-

SG/PROD/03
Rev.no./Dt. "00"/ 05-
Name and Employee ID: I. II. III.
07-19
Machine/Line
Date: Part Name Target
(on 100% OEE)
Actual Availability Losses [Minutes]
Operator
Sign
Time Pcs Cumu Pcs Cumu Level 1 Deviation Loss Time

09.00-10.00

10.00-11.00

11.00-12.00

12.00-01.00

01.30-02:00

02:00-03.00

03.00-04.00

04.00-05.00

05.00-06.00

Total shift

Perf Dailogue: Performance Dialogue between Production, Operator and Maintenance Supervisor

Name and Employee ID: I. II. III.

Machine/Line
Date: Part Name Target
(on 100% OEE)
Actual Availability Losses [Minutes]
Operator
Sign
Time Pcs Cumu Pcs Cumu Level 1 Deviation Loss Time

09.00-10.00

10.00-11.00

11.00-12.00

12.00-01.00

01.30-02:00

02:00-03.00

03.00-04.00

04.00-05.00

05.00-06.00

Total shift

Perf Dailogue: Performance Dialogue between Production, Operator and Maintenance Supervisor

Loss Level Code 1 2 3 4 5 6 7 8 9 10 11 12


Description Loss No Coolant No Automati
Level Code operat on
Description or
No Material No Tool No Air No Power No Setter Running Setting Rework Scrap Speed Loss
13 14 15 16
Preventive Mechanic Electrical New
Maint. al Maint. Maint. Setting