1. Can SMAI1 be used to take VT input if used to take CT input once before?

Yes. Clock cycle has to be different.

2. Meaning of the OUTPUTs of SMAI blocks

3. Meaning of Cycle time for SMAI function block

4. Any convention for which type of cycle (1ms/3ms/8ms...) to be used for different
protection/metering block?
All connected signal blocks should have same clock cycle. Measurement blocks should
have clock cycle of 8ms.

5. Outputs from measurement blocks are not taken anywhere, why measured then ?

6. Function of the output of SMAI namely AI3P

7. Connection between blocks L3CPDIF and LDLPSCH, as no visible connection is seen

8. Trip signal option present at L3CPDIF, why LDLPSCH is used to sent trip ?

Bhulta 400kV lines


Haripur 132kV Siddhirganj lines
Haripur 230kv sld shows no bhulta line, but Bhulta sld shows
** Haripur SS er PDB SWY er part ki PGCB take care kore?

app id for indian visa 39122235Q3TRHN7


Applicant Name : ALLAMA HASAN
Application Id : BGDDV25D7B20

bhulta 132 kv and ghorashal 230+132 kv coltrol room call


haripur 230 kv feeders
manik nagar 230+132 kv feeders

ashuganj 230kv trafo no data


ghorashal feeder confirmation from control room
no data about ashuganj 400kv
what is OAT? should ashuganj 132 OAT be inserted in ND?