Construction of Open Stadium
Construction of Open Stadium
ACKNOWLEDGEMENTS:
The completion of this work would not have been possible without the kind
I am highly grateful to Engineer Nazir, for guiding me with the internship all
gaining practical experience in various fields during the training. His valuable
2|Page
3|Page
4|Page
5|Page
6|Page
7|Page
8|Page
9|Page
10 | P a g e
11 | P a g e
12 | P a g e
13 | P a g e
14 | P a g e
15 | P a g e
16 | P a g e
17 | P a g e
18 | P a g e
19 | P a g e
20 | P a g e
21 | P a g e
22 | P a g e
23 | P a g e
24 | P a g e
25 | P a g e
26 | P a g e
CONCLUSION:
Under the kind guidance of Engineer NAZIR, we learnt many technical and
practical aspects of construction. The main aim of studies within this project
etc. We cleared our many doubts regarding building construction. During the
period of ONE month, all people on the site helped us a lot to provide all the
information about any query. So, we are grateful to THE ROAD AND BUILDING
DEPARTMENT LEH.
THANKS