Download as pdf
Download as pdf
You are on page 1of 1
(s7er ATT) GOVERNMENT OF INDIA (29 Waa) MINISTRY OF RAILWAYS: (27 a3) (RAILWAY BOARD) No.2019/Tele Dev/Wi-Fi facility/stns Dated: 26.11.2019 PCSTE, Chairman & Managing Director All Indian Railways, RallTel Corporation of India Ltd, Plate-A, 6" Floor, Office Block Tower-2, East Kidwai Nagar, New Delhi- 110023 Sul: Maintenance of WI-FI facility at 4791 station by M/s, Tata Trust. Ref : This office letter no 2018/Tele/6(4)/3 Pt dtd 20.05.19 4. An MoU was signed between Indian Railways, Tata Trust, Vijeyavahini Charitable foundation and RailTel Corporation of india for the provision of Wi-Fi facility at 4791 stations across Indian Railways, and the same was circulated vide reference above. 2, At SL No- Ill (1) of Annex4 of Role and responsibility matiix in the said MoU, Operation & Maintenance of the entire active and passive Network infrastructure for WLFi facility at 4791 stations provided by Tata Trust, lies with Indian Railways & RaliTel There Is a need to distinguish the responsibilities of each stakeholder in light of the spirit of MoU. Accordingly, Board (MST) have approved the following: 2.1 Respective Railway shall maintain earthing, power supply & railway maintained fibre. . 2.2 RailTel shall operate & maintain the other active and passive Network Infrastructure (including OLT, ONT, Splitter, AP, EMSINMS etc.) and the ' associated accessories at each station or at NOC, ‘These equipments have ennus! maintenance service support for two years after one year warranty period. The relevant document provided by Tata Trust is enclosed. 23 RaifTel shall also maintain backend fibre (maintained by RailTel) and bandwidth, Kindly acknowledge the receipt and ensure compliance. DA: As above (uploaded along with the letter in important letters/Telecom Die, webpage of Board's website hito://tele.b.rallnet,gov.in/wiki/tele|) ce (Umesh Balofida) i Executive Director(Tele Dev) | E-mail: edtd@rb.railnet.gov.in Phone: 23383138/FAX 011-23304198

You might also like