PC1570+386.31
R-1 REFERENCE POINT K1570+343.70
CUT/FILL SECTION EXTEND EXISTING 1 - BARREL 3.00m X 4.00m BOX CULVERT BY 7.00m BOTH SIDES,
WIDENING EDGE PROVIDE APRON AT BOTH ENDS
I.E. = 290.766m
EXISTING LANE EDGE
.00
0
PI
5. 0
.00
296
0
0
EXISTING PAVEMENT
298.00
4.0
292.0
0
1
0
297
29
3.0
8.0
297.00
29
295.00
.00
29
293
29
.00 = 15.00m92.0 2
00
RROW LIMIT
296
4.0
0
.
29
299
RROW LIMIT = 15.00m
R-2
1570+400
1570+300
.00
1570+200
1570+100
300
1569+974 1570+000
1570
+500
RROW LIMIT = 15.00m
BM-1
RROW LIMIT = 15.00m
297
R-1
295.00
296
295
0
297.00
.00
294
.00
.00
296.0
.00
293
.00
.00
292
.00
294
298
.00
293
.00
292
.00
KM
POST
1570
15
70
+6
00 RR
.00
OW
LIM
IT
300
=1
5.0
95° 50' 36.47" REFERENCE POINTS
0m
NAMRIA REFERENCE 29
00
412.76m 8.
0.
COORDINATE BKN NO. NORTHING/ EASTING/ REF. # DISTANCE AZIMUTH REMARKS 00
ELEVATION REMARKS
66
SYSTEM LONGITUDE LATITUDE
0+
PRS-92 848449.795 496786.07 BRGY. COMPOUND, R-1 13.95 185° 50' 18.05" KM POST 1570 RR
OW
BEG. OF PROJECT
57
BENCHMARKS 3628 294.685 SAN NICOLAS, DON CARLOS, LIM
R-2 29.97 77° 07' 23.29" ELECTRIC POST - LEFT SIDE IT
K1
WGS-84 124°58'20.601" 7°40'21.367" BUKIDNON =1
5.0
K1570+000.00 NO. NORTHING EASTING ELEVATION REMARKS
0m
NE
1 848834.12 497147.07 298.461 EDGE OF EXISTING PAVEMENT
N 848827.642 TO
LI
KA
CH
E 497145.698
P L A N DI
NG 0
AT
9.0
ELEV. = 298.462m
P IL 15 29
M
ELEMENTS OF CURVES AN7
29 0+
9 70
PI # P.I. STATION NORTHING EASTING I (∆) Dc R T E LC BBC ECC DESIGN SPEED SUPERELEVATION WIDENING .0 0
0
PI
1
1570+568.13 848885.4842 496580.5162 130.4475 4.3645 393.922 181.820 39.936 340.685 1570+386.31 1570+727.00 80 KPH 6.00 % 0.00 m
1 5 SCALE 1 : 2000 m
305
PIVC 4
PVI STA: 1570+570.00
PVI ELEV: 300.81 m
PIVC 2 Mo: 0.934 m
PVI STA: 1570+110.00 LVC: 177.76 m
PVI ELEV: 299.40 m K: 42.283
N
Mo: 0.810 m
LVC: 186.43 m
K: 53.610
EVCS: 1570+397.80
300
BVCS: 1570+278.19
O
EVCE: 295.24
BVCE: 294.90
I
g = 0.80268%
EVCS: 1570+658.90
EVCE: 299.96
%
756
3.23
T
g=-
2.67 g=
BVCS: 1570+016.77
BVCE: 298.65
489%
BVCS: 1570+481.14
BVCE: 297.94
295
A
EVCE: 296.91
EVCS: 1570+203.20
V
E
K1570+343.70
EXTEND EXISTING 1 - BARREL 3.00m X 4.00m BOX CULVERT
290 BY 7.00m BOTH SIDES,
L
PIVC 3
PVI STA: 1570+338.00 PROVIDE APRON AT BOTH ENDS
PVI ELEV: 293.30 I.E. = 290.766m
Mo: 0.884
E
LVC: 119.61
K: 20.230
1 : 200
1 : 2000
285
STATION 1570+000 1570+100 1570+200 1570+300 1570+400 1570+500 1570+600
FINISHED GRADE
298.345 298.462 298.664 298.649 298.826 298.773 298.708 298.490 298.174 297.858 297.465 297.047 296.482 295.917 295.351 294.867 294.423 294.269 294.221 294.371 294.769 295.222 295.948 296.621 297.234 297.823 298.379 298.888 299.335 299.725 300.006 300.189 300.261 300.149
ELEVATION
ORIGINAL GROUND 298.345 298.462 298.664 298.649 298.826 298.773 298.708 298.490 298.174 297.858 297.465 297.047 296.482 295.917 295.351 294.867 294.423 294.269 294.221 294.371 294.769 295.222 295.948 296.621 297.234 297.823 298.379 298.888 299.335 299.725 300.006 300.189 300.261 300.149
ELEVATION
+341.40
+353.65
+365.90
+402.65
L
CL
SUPERELEVATION
6.00%
R
WIDENING
R
SURVEYED: DESIGNED:
Republic of the Philippines PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDED APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X LOUDIE M. MAGANTE JOMARIE D. CABISAY
WIDENING ALONG ENGINEER I ENGINEER II
DON CARLOS-KADINGILAN ROAD P 14
BUKIDNON SECOND K1570+000.00 - K1573+000.00
PLAN AND PROFILE DRAFTED: REVIEWED: NORMA A. OGABANG MANUEL D. VARIAS, JR. LIBERATO S. TAN, JR.
K1570+000.00 - K1570+660.00 CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DISTRICT ENGINEERING OFFICE 1 5
77
Pinamaloy, Don Carlos, Bukidnon DON CARLOS, BUKIDNON ZEN LLOYD M. TALDE JOCELYN T. ECHALICO DATE: DATE: DATE:
ENGINEER II ENGINEER II
BENCHMARKS
NO. NORTHING EASTING ELEVATION REMARKS
+727.00
2 849519.46 496148.32 295.880 EDGE OF HEADWALL, RIGHT
0
300.0
PT1570
299.0
MATCHLINE K1570+660.00
0
298.0
IT = 15.00m
297.00
RROW LIM
TO DON CARLOS
71+000.00 BK
AH
1570+700
71+012.40
1570+8
STA. 15
STA. 15
IT = 15.00m 00
RROW LIM
RROW
LIMIT =
15. 00m
297.00
1570+900
299
.00
.00
0
7
0
6.0
29
299.00
295.00
295.0
299.00
299.00
298.00
29
0
1571+000
1571+0
295.0
00
297.00
RROW
LIMIT =
LEGEND: 15.00m
1571+1
R-1 REFERENCE POINT 00
+300.00
CUT/FILL SECTION
KM RROW
LIMIT =
WIDENING EDGE POST 1571+2
15.00m
1571 00
EXISTING LANE EDGE
71
NE K15
EXISTING PAVEMENT
1571+3
00 TO
KADIN GILAN
BM-2
LI
P L A N RROW
MATCH
LIMIT =
15.00m
P
296.00
2 5 SCALE 1 : 2000 m
29
0
5.0
.0
5
29
0
STA. 1571+000.00 AH
STA. 1571+012.40 BK
Elev. 305
BVCS: 1570+766.06
BVCE: 298.92
N
EVCS: 1570+793.93
EVCE: 298.56
BVCS: 1570+803.46
O
EVCS: 1570+876.55
BVCE: 298.41
I
EVCE: 297.73
T
PIVC 7
Elev. 300 PVI STA: 1571+100.00
g = -0.96644%
A
K: 1116.770
g = -0.27627%
E
EVCS: 1570+658.90
EVCE: 299.96
PIVC 5
PVI STA: 1570+780.00
L
BVCS: 1570+963.92
BVCE: 297.49
Mo: 0.120
K: 44.332 LVC: 73.09
K: 55.419
EVCS: 1571+248.47
EVCE: 296.27
1 : 200
1 : 2000
Elev. 290
STATION 1570+700 1570+800 1570+900 1571+000 1571+000 1571+100 1571+200 1571+300
FINISHED GRADE
299.959 299.707 299.521 299.344 299.207 299.015 298.746 298.428 298.148 297.948 297.800 297.717 297.622 297.547 297.492 297.430 297.377 297.338 297.338 297.314 297.278 297.184 297.079 296.977 296.893 296.807 296.723 296.625 296.519 296.415 296.310 296.221 296.134 296.048
ELEVATION
ORIGINAL GROUND 299.959 299.707 299.521 299.344 299.207 299.015 298.746 298.428 298.148 297.948 297.800 297.717 297.622 297.547 297.492 297.430 297.377 297.338 297.338 297.314 297.278 297.184 297.079 296.977 296.893 296.807 296.723 296.625 296.519 296.415 296.310 296.221 296.134 296.048
ELEVATION
+710.67
+747.42
+759.67
+771.92
L
CL
SUPERELEVATION
6.00%
R
WIDENING
R
SURVEYED: DESIGNED:
Republic of the Philippines PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDED APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X LOUDIE M. MAGANTE JOMARIE D. CABISAY
WIDENING ALONG ENGINEER I ENGINEER II
DON CARLOS-KADINGILAN ROAD P 15
BUKIDNON SECOND K1570+000.00 - K1573+000.00
PLAN AND PROFILE: DRAFTED: REVIEWED: NORMA A. OGABANG MANUEL D. VARIAS, JR. LIBERATO S. TAN, JR.
K1570+660.00 - K1571+300.00 CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DISTRICT ENGINEERING OFFICE 2 5
77
Pinamaloy, Don Carlos, Bukidnon DON CARLOS, BUKIDNON ZEN LLOYD M. TALDE JOCELYN T. ECHALICO DATE: DATE: DATE:
ENGINEER II ENGINEER II
00
3.
00
29
+0
72
K1571+935.70
15
N
M
LEGEND: LA
EXTEND EXISTING 1 - LINE 910mm Ø RCPC BY 7.00m AT LEFT SIDE AND 6.00m AT RIGHT SIDE, 0 GI
AT
.00
00 IN
C
R-1 REFERENCE POINT PROVIDE HEADWALL AND APRON AT BOTH ENDS 2+ AD
295
7
HL
15O K
KM
I.E. = 293.269m ST 2
IN
CUT/FILL SECTION T
0m
PO 57
E
5.0
=1 1
K1
WIDENING EDGE LIM
IT
57
O W
EXISTING LANE EDGE RR
29
+9
294.00
5.
EXISTING PAVEMENT
00
0.
00
PC1571+791.97
0m
5.0
295.00 IT
=1
0
LIM
295.0
OW
RR
0
5.0
0
0
294.0
295.0
29
294 0
+90
MATCHLINE K1571+300.00 2
.00 1
157
29
5.
00
1571+300 1571+400 1571+500 1571+600 1571+700 1571+800
29
5.
PI
RROW LIMIT = 15.00m RROW LIMIT = 15.00m
00
2
29
.00
5.
295.0
00
00
5
294.0
0 0
29
5.
294.0
9
29
5.
00
0 293.00
293.0
ELEMENTS OF CURVES
PI #
PI
P.I. STATION
1571+932.66
NORTHING
850037.7159
EASTING
495785.5249
I (∆)
124.3326
Dc
5.9310
R
289.942
T
153.087
E
37.933
LC
281.702
BBC
1571+779.58
ECC
1572+042.79
DESIGN SPEED
80 KPH
SUPERELEVATION
7.80 %
WIDENING
0.00 m
P P L A N
2
3 5 SCALE 1 : 2000 m
305
N
BVCS: 1571+337.31
EVCS: 1571+462.70
300
BVCE: 295.79
O
EVCE: 295.48
PIVC 9
PVI STA: 1571+860.00
PVI ELEV: 295.68 m
I
Mo: 0.079 m
LVC: 211.26 m
K: 709.611
T
g = 0.04921%
295
A
PIVC 8
PVI STA: 1571+400.00 K1571+935.70
V
BVCE: 295.62
BVCS: 1571+754.37
PVI ELEV: 295.45 EXTEND EXISTING 1 - LINE 910mm Ø RCPC BY 7.00m AT LEFT SIDE AND 6.00m AT RIGHT SIDE,
EVCE: 295.41
EVCS: 1571+965.63
Mo: 0.093 PROVIDE HEADWALL AND APRON AT BOTH ENDS
LVC: 125.39 I.E. = 293.563m
K: 212.034
E
290
L
E
1 : 200
1 : 2000
285
STATION 1571+400 1571+500 1571+600 1571+700 1571+800 1571+900
FINISHED GRADE
295.939 295.822 295.704 295.609 295.541 295.499 295.499 295.500 295.498 295.511 295.521 295.529 295.538 295.547 295.556 295.566 295.576 295.586 295.623 295.661 295.696 295.699 295.701 295.692 295.688 295.672 295.668 295.597 295.538 295.489 295.464 295.448 295.390 295.396
ELEVATION
ORIGINAL GROUND 295.939 295.822 295.704 295.609 295.541 295.499 295.499 295.500 295.498 295.511 295.521 295.529 295.538 295.547 295.556 295.566 295.576 295.586 295.623 295.661 295.696 295.699 295.701 295.692 295.688 295.672 295.668 295.597 295.538 295.489 295.464 295.448 295.390 295.396
ELEVATION
+753.01
+731.47
+742.24
+798.24
L
CL
SUPERELEVATION
7.80%
R
WIDENING
R
SURVEYED: DESIGNED:
Republic of the Philippines PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDED APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X LOUDIE M. MAGANTE JOMARIE D. CABISAY
WIDENING ALONG ENGINEER I ENGINEER II
DON CARLOS-KADINGILAN ROAD P 16
BUKIDNON SECOND K1570+000.00 - K1573+000.00
PLAN AND PROFILE: DRAFTED: REVIEWED: NORMA A. OGABANG MANUEL D. VARIAS, JR. LIBERATO S. TAN, JR.
K1571+300.00 - K1571+980.00 CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DISTRICT ENGINEERING OFFICE 3 5
77
Pinamaloy, Don Carlos, Bukidnon DON CARLOS, BUKIDNON ZEN LLOYD M. TALDE JOCELYN T. ECHALICO DATE: DATE: DATE:
ENGINEER II ENGINEER II
LEGEND:
R-1 REFERENCE POINT
K1572+335.50
CUT/FILL SECTION EXTEND EXISTING 1 - LINE 4.00m X 4.00m BOX CULVERT BY 10.00m BOTH SIDES,
WIDENING EDGE
K1572+325.40 PROVIDE HEADWALL AND APRON AT BOTH ENDS
EXISTING LANE EDGE EXTEND EXISTING 2 - LINE 1,220mm Ø RCPC BY 6.00m AT LEFT SIDE AND 5.00m AT RIGHT SIDE, I.E. = 281.621m
EXISTING PAVEMENT PROVIDE HEADWALL AND APRON AT BOTH ENDS
I.E. = 280.524m
STA. 15 +018.50 BK
AH
PC1572+489.72
PT1572+073.67
PT1572+554.67
72+000.00
28
00
72
RR
1.
2.0
OW
0
292.00
STA. 15
28
290.00
28 0
LIM
980.0
293.00
291.00
2.0
28
IT =
0
28
292.00
289.00
3 .0
28
290
288
15.0
288.00
28
28 0
289
287.00
3.0
0m
4.0
291
5.0
286.00
6.
7.
0
28
0
0
00
.00
00
.00
293.00
4.0
5.0
.00
PI
.00
0
0
571+
4.0
MATCHLINE K1572+640.00
28
28
3
29
RROW LIMIT = 15.00m
E K1
RR 1572+0
O 00
HLIN
WL
IMIT 1572+000
=1
5.0
0m 1572+100 1572+200 1572+300 1572+400 1572+500
1572+600
TO KADINGILAN
C
MAT
290.00
295.0
290.00
RROW LIMIT = 15.00m
285.00
0
0
292.00
288.00
0
286.00
0
0
0
287.00
0
.00
00
293.00
00
5.0
286.0
00
291.0
292.0
289.0
291.0
293.0
284.00
7. 8.
283.00
282.00
281.00
9.
KM
281.00
.00
282.00
28
283.00
28
285
29
28
POST
284
1572
294.00
294.00
K1572+453.10
END OF PAVED SHOULDER , BOTH SIDES
PI
P.I. STATION NORTHING EASTING I (∆) Dc R T E LC BBC ECC DESIGN SPEED SUPERELEVATION WIDENING
1572+491.32 850034.8656 495183.9178 178.6756 0.6117 2810.016 32.479 0.188 64.956 1572+458.84 1572+523.80 80 KPH NORMAL CROWN 0.00 m
3
4 5 SCALE 1 : 2000 m
300
PIVC 10
PVI STA: 1572+101.51
PVI ELEV: 295.03 m
Mo: 0.850 m PIVC 12
LVC: 137.69 m PVI STA: 1572+546.51
N
K: 29.270
I
BVCS: 1572+032.62
BVCE: 295.20
T
EVCS: 1572+608.26
EVCE: 293.94
g=
-5.
290 18
STA. 1572+000.00 AH
STA. 1572+018.50 BK
82
A
%
7% 986
4 .85
g=
EVCS: 1572+170.31
EVCE: 291.46
PIVC 11
V
BVCS: 1572+484.84
BVCE: 290.55
PVI STA: 1572+331.51
PVI ELEV: 283.10
Mo: 2.525
LVC: 200.94
E
K: 19.998
BVCS: 1572+231.05
EVCS: 1572+431.99
285
BVCE: 288.31
L
EVCE: 287.98
E
1 : 200
K1572+335.50
EXTEND EXISTING 1 - LINE 4.00m X 4.00m BOX CULVERT BY 10.00m BOTH SIDES,
PROVIDE HEADWALL AND APRON AT BOTH ENDS
1 : 2000 K1572+325.40
I.E. = 281.621m
280 EXTEND EXISTING 2 - LINE 1,220mm Ø RCPC BY 6.00m AT LEFT SIDE AND 5.00m AT RIGHT SIDE,
PROVIDE HEADWALL AND APRON AT BOTH ENDS
STATION 1572+000 1572+100 1572+200 1572+300 I.E. = 280.524m 1572+400 1572+500 1572+600
FINISHED GRADE
295.343 295.265 295.254 295.175 294.945 294.674 294.089 293.503 292.857 292.025 290.971 289.959 288.875 287.900 287.052 286.357 285.805 285.564 285.646 285.779 286.233 286.818 287.461 288.338 289.308 290.297 291.204 292.001 292.705 293.268 293.615 293.809 294.004 294.119
ELEVATION
ORIGINAL GROUND 295.343 295.265 295.254 295.175 294.945 294.674 294.089 293.503 292.857 292.025 290.971 289.959 288.875 287.900 287.052 286.357 285.805 285.564 285.646 285.779 286.233 286.818 287.461 288.338 289.308 290.297 291.204 292.001 292.705 293.268 293.615 293.809 294.004 294.119
ELEVATION
+024.13
+069.36
+080.13
+090.90
L
SUPERELEVATION
L
C
R 7.80%
WIDENING
R
SURVEYED: DESIGNED:
Republic of the Philippines PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDED APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X LOUDIE M. MAGANTE JOMARIE D. CABISAY
WIDENING ALONG ENGINEER I ENGINEER II
DON CARLOS-KADINGILAN ROAD P 17
BUKIDNON SECOND K1570+000.00 - K1573+000.00
PLAN AND PROFILE: DRAFTED: REVIEWED: NORMA A. OGABANG MANUEL D. VARIAS, JR LIBERATO S. TAN, JR.
K1571+980.00 - K1572+640.00 CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DISTRICT ENGINEERING OFFICE 4 5
77
Pinamaloy, Don Carlos, Bukidnon DON CARLOS, BUKIDNON ZEN LLOYD M. TALDE JOCELYN T. ECHALICO DATE: DATE: DATE:
ENGINEER II ENGINEER II
PC1572+764.28
5.0 0
0
2995.0
MATCHLINE K1572+640.00
PI
2
ELEMENTS OF CURVES
RROW LIMIT = 15.00m
4
PI # P.I. STATION NORTHING EASTING I (∆) Dc R T E LC BBC ECC DESIGN SPEED SUPERELEVATION WIDENING
0
4.0
29
PI
1572+882.26 850042.0500 494793.0367 148.3758 3.2704 525.652 148.864 20.673 290.132 1572+733.40 1573+012.43 80 KPH 5.60 % 0.00 m
4
.00
1572+700
293
1572+800
00
2.
29
RROW LIMIT = 15.00m
00
1.
RR
OW 29
LIM
0
157 IT =1
0.0
2+9 5.0
00 0m
.00
29
.00 K
0
289
AH
00 .10 B
4.0
.00
29
73 +011
288
0
7.0
1
0
+0
00
4.4
3.0
A. 573
28
ST 00
.
286
ST A. 1
15
29
05
5.
RR
OW
+
LIM
28
IT
73
=1
91° 03' 10.75" 5.0
.00
0m
00
15
4.
292
209.60m 28
PT
.00
15
00
73
291
+0
0
.
015
290
73
+0 0
00 3.0
0
28
9.0
.00
28
.00
288
.00
287
.00
286
282.00
.00
285
LEGEND:
284
K
PO M
15 ST .00 R-1 REFERENCE POINT
73 83
P L A N
2
0
CUT/FILL SECTION
282.0
P 15
73
+0
72 WIDENING EDGE
TO
KA EXISTING LANE EDGE
5 5 SCALE 1 : 2000 m DI
NG
ILA
EXISTING PAVEMENT
N
300 12
2°
PIVC 13 40
'3
PVI STA: 1572+846.51 7.7
8"
PVI ELEV: 295.47 m
Mo: 1.534 m
LVC: 169.56 m
N
K: 23.421
295
O
E 494678.274
BVCS: 1572+761.64
BVCE: 294.93
ELEV. = 284.650m
T
290
BVCS: 1573+008.71
A
BVCE: 284.77
g=
V
-6.
59
EVCS: 1572+931.20
EVCE: 289.89
68
5%
EVCS: 1573+063.26
E
EVCE: 281.39
285
L
E
g=
1 : 200
-3.7
1 089
PIVC 14 %
1 : 2000 PVI STA: 1573+030.41
280 PVI ELEV: 282.61
Mo: 0.237
STATION LVC: 65.65
1572+700 1572+800 1572+900 1573+000 1573+100 1573+200
K: 22.748
FINISHED GRADE 285.408
294.262 294.431 294.526 294.639 294.774 294.897 294.995 294.889 294.576 294.140 293.499 292.659 291.692 290.505 289.239 288.020 286.749 283.376 282.361 281.503
ELEVATION 284.650
ORIGINAL GROUND 285.408
294.262 294.431 294.526 294.639 294.774 294.897 294.995 294.889 294.576 294.140 293.499 292.659 291.692 290.505 289.239 288.020 286.749 283.376 282.361 281.503
ELEVATION 284.650
+049.81
+696.02
+706.73
+717.45
+746.73
+010.20
+028.38
+039.10
L
CL
SUPERELEVATION
5.60% 5.60%
R
WIDENING
R
SURVEYED: DESIGNED:
Republic of the Philippines PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDED APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X LOUDIE M. MAGANTE JOMARIE D. CABISAY
WIDENING ALONG ENGINEER I ENGINEER II
DON CARLOS-KADINGILAN ROAD P 18
BUKIDNON SECOND K1570+000.00 - K1573+000.00
PLAN AND PROFILE: DRAFTED: REVIEWED: NORMA A. OGABANG MANUEL D. VARIAS, JR. LIBERATO S. TAN, JR.
K1572+640.00 - K1573+000.00 CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DISTRICT ENGINEERING OFFICE 5 5
77
Pinamaloy, Don Carlos, Bukidnon DON CARLOS, BUKIDNON ZEN LLOYD M. TALDE JOCELYN T. ECHALICO DATE: DATE: DATE:
ENGINEER II ENGINEER II
L A L A P O Y B R I D G E
K1582+608.00 - K1582+637.00
TEST PIT #2
K1582+000.00
END OF PROJECT
BEG. OF PROJECT
K 1583+621.00
K 1580+893.00
TEST PIT
O.G.L
H
- 0.50 m
T
P
E
- 1.00 m
D
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
A-7-6
A-7-6
A-7-6
1 : 20
1:10,000
- 1.50 m
1580+500 1581+000 1581+500 1582+000 1582+500 1583+000 1583+500
2 S O I L P R O F I L E
G-9 SCALE N D T S
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ZEN LLOYD M. TALDE
REGIONAL OFFICE X ROAD WIDENING ALONG · STRAIGHT LINE DIAGRAM
ENGINEER II
DON CARLOS - KADINGILAN ROAD (TEST PITTING LOCATIONS) G
BUKIDNON SECOND 12
2020
K1580+893.00 - K1582+608.00 · SOIL PROFILE PREPARED:
JOCELYN T. ECHALICO NORMA A. OGABANG MANUEL D. VARIAS, JR. LIBERATO S. TAN, JR.
DISTRICT ENGINEERING OFFICE K1582+637.00 - K1583+621.00
9 10 69
MARCELINO G. ANOC ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PINAMALOY, DON CARLOS, BUKIDNON
DON CARLOS, BUKIDNON ENGINEER II
DATE: DATE: DATE: DATE:
TEST PIT #1 TEST PIT #3 TEST PIT #5 TEST PIT #7 TEST PIT #9 TEST PIT #11 TEST PIT #13
K1570+000.00 K1570+500.00 K1571+000.00 K1571+500.00 K1572+000.00 K1572+500.00 K1573+000.00
TEST PIT #2 TEST PIT #4 TEST PIT #6 TEST PIT #8 TEST PIT #10 TEST PIT #12
K1570+250.00 K1570+750.00 K1571+250.00 K1571+750.00 K1572+250.00 K1572+750.00
END OF PROJECT
BEG. OF PROJECT
K 1573+000.00
K 1570+000.00
TEST PIT
O.G.L
H
- 0.50 m
T
P
E
- 1.00 m
D
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
CLAYEY SOIL
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
A-7-6
1 : 20
1:10,000
- 1.50 m
1570+000 1570+500 1571+000 1571+500 1572+000 1572+500 1573+000
2 S O I L P R O F I L E
G-9 SCALE N D T S
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ZEN LLOYD M. TALDE
REGIONAL OFFICE X · STRAIGHT LINE DIAGRAM
WIDENING ALONG ENGINEER II
(TEST PITTING LOCATIONS) G 12
BUKIDNON SECOND DON CARLOS-KADINGILAN ROAD
2020
· SOIL PROFILE PREPARED:
K1570+000.00 - K1573+000.00 JOCELYN T. ECHALICO NORMA A. OGABANG MANUEL D. VARIAS, JR. LIBERATO S. TAN, JR.
DISTRICT ENGINEERING OFFICE 9 10 77
MARCELINO G. ANOC ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PINAMALOY, DON CARLOS, BUKIDNON DON CARLOS, BUKIDNON
DATE: DATE: DATE: DATE:
ENGINEER II