Navi Mumbai Metro Line 1: Portal Mast Calculation - Panchanand Depot
Navi Mumbai Metro Line 1: Portal Mast Calculation - Panchanand Depot
2
1 Wind Pressure Considered 150 kg/m
13 Weight of Man 60 Kg
Input parameters
Locatio no 3018-3019
Type of portal used BFBU
2
Soil Pressure 8,000 kg/m
weight of Boom 33.55 kg/m
weight of Upright 150.382 kg/m
Wind load on Portal 28.69 kg/m
Height of portal from G.L. 8.55 m
Eff. Length of Portal 19 m
Number of bracket 4
No. of Drop Arm. (6"x6") 2
2
Unit wt of soil 1800 kg/m
2
Unit wt of concrete 2500 kg/m
Length of drop arm 3 m
width of drop arm (6"x6") 0.152 m
3
Wind pressure considered 150 kg/m
Wind Load Acting on Bracket 21 Kgs
K = H/L 0.45
N1 = K+2 2.45
N2 = 6K+1 3.7
Foundation Type
P9
P10
NAVI MUMBAI METRO LINE 1
Portal Mast Calculation - Panchanand Depot
Loc.No: 3018-3019 Mast: PORTAL BFBU
LOAD in MA MD
Description HA (Kg) HD (Kg) RA (Kg) RD (Kg)
(Kg/m) (Kgm) (Kgm)
LOAD in MA MD
Description HA (Kg) HD (Kg) RA (Kg) RD (Kg)
(Kg/m) (Kgm) (Kgm)
Hor. Load at Boom Due to OHE 417.51 -1212.7 1212.75 -242.31 242.305 60.46 60.46
VERTICAL LOAD 3 0 0 0 0 0 0 0
Gross S.B.C.
Actual base Pressure Pmax = 2
7657 7224 10176 kg/m
(2xN)/(3xBxz) < Gross S.B.C.
Hence Safe Hence Safe
Case-2