NAVI MUMBAI METRO LINE 1

Mast Calculation - Panchanand Depot


Loc.No: 2001 Mast: 8 X 8 BFB(9.0m)
1.Specifications:
Cables & Wires
nominal tension with
section diam weight
Description material tension wind
2
mm mm kg kg(35' ) kg(35' )
Earth cable Steel 93.3 12.5 0.437 500 738
Catenary wire Cu Cd 65 10.5 0.597 1200 1200
Contact wire Hard Copper 150 14.5 1.34 1200 1200
Anticreep cable Cu Cd 65 10.5 0.597 1000 594

2 Mast:8 X 8 BFB(9.0m)
Width of moment of moment of Section of Section of
Weight Depth of sec. Area of sec.
sec. 2
Inertia X-X Inertia Y-Y modulus X-X modulus Y-Y
(kg/m) (mm) (cm ) 4 4 3 3
(mm) (cm ) (cm ) (cm ) (cm )
52 203.2 203 66.5 5263 1770 510 174

3 Layout:

4 Schematic drawing :

0.195

Heights are with


respect to
Foundation level
Hopc

- + Hcw 6.00
Hm

stagger Hm 7.65
2.50 HOPC 7.46
Stagger 1 -0.200
Hcw

0.203 Stagger 2 -
0.5
1.35

1/3
Loc.No: 2001

Ref.Line: Centre Line of Track(Considered as Tangent) + ve - ve

1.Radial Tension
Deviation from left side Deviation from right side
Radial Tension = X Tension of the
Left Span Right Span conductor

Left Span = 40.00 Avg Span = 40.25


Right Span = 40.50

Track Left Centre Right

OHE
0.200 -0.200 0.000
0.200 -0.200 0.000
0.400 0.200
((0.4/ 40) + (0.2 /40.5)) X 2400 = 36 kg

OPC -2.500 -2.500 -3.000

-0.203 -0.203 -0.203

-2.703 -2.703 -3.203

0.000 -0.500
((0/40) + (-0.5/40.5)) X 738 = -9 kg

2.Wind Load (Perpendicular to Track)

OHE = 0.67X150X(25)/1000 X1.05X40.25= 106 kg Conductor = 0.67


OPC = 0.67X150X12.5/1000X40.25= 50 kg Mast(Safety Factor) = 1
Mast = 1 X 150 X 0.203 X 7.65= 233 kg Wind Pressure = 150
2
kg/m

3.Lever Arm

IR 2.5+(.203/2)+0.200 = 2.802 m

4.Vertical Load
OHE (1.34+0.597) X 40.25 = 78 kg
Bracket = 60 kg
Mast 7.65 X 52 = 398 kg
OPC 0.437X40.25 = 18 kg

5. Wind load parallel to track


Mast = 1 X 150 X 0.203 X 7.65 = 233 kg
Bracket( for each) = 60 kg

2/3
Design of OHE Mast
Loc.No: 2001 Displacement of Bracket OHE
Type of Mast 8 X 8 BFB(9.0m) d=L T 0.291 Avg.span(m) 40.25 Implantation 2.50
Wind Perpendicular to track Wind parallel to track
Type of Load Lever arm X - axis Y - axis Type of load Lever arm X - axis Y - axis Y - axis
(m) Load (Kg) BM (Kg-m) BM (Kg-m) (m) Load (Kg) BM (Kg-m) BM (Kg-m) Load (Kg) BM (Kg-m)
Permanent (Horiz. point load) Lp d*BM / i Temporary Wind load Lw d*BM / i load Lw
OHE 6.50 36 234 27 OHE 6.50 106 689 80
OPC 7.46 -9 -67 OPC 7.46 50 373
Total 27 167 27 Mast 3.83 233 891 233 891
H1 M1 M3 Bracket 6.45 60 387

Vertical load
X-axis Y-axis
Lever arm Load BM BM (Kg-m)
(m) (kg) (kgm) d*BM / i
OHE+B/2+M
an+kit 2.802 188 527 61 Total 389 M5= 1953 M7= 80 H3= 293 M6= 1278
H2 M1= 166.9 M3= 27 X-axis M3= 27
1/2*Bracket 30 M2= 527 M4= 61 M1= 167 M4= 61
Mast 398 M2= 527
OPC 18 Wind Perpendicular to track Wind parallel to track
x-axis y-axis x-axis y-axis
Total 634 527 61 Total BM at top of Foundation 2647 168 694 1366
V1 M2 M4
Proposed FBM Code : 135