FIRE AND JOCKEY PUMP SCHEDULE

F. P. GENERAL NOTES F. P. LEGENDS & SYMBOLS


1. ALL WORKS HEREIN INCLUDED SHALL BE EXECUTED ACCORDING
DATA DESIGNATION FP-1 JP-1
TO THE PROVISION OF THE NATIONAL FIRE PROTECTION RISER NIPPLE (RN)
SERVICE FIRE PUMP ( Non UL/FM) JOCKEY PUMP
ASSOCIATION (USA) AND FIRE CODE OF THE PHILIPPINES.
FLEXIBLE COUPLING LOCATION PUMP ROOM PUMP ROOM
2. THE WORKS SHALL BE EXECUTED IN CLOSE COORDINATION
WITH ALL TRADES. FEEDMAIN (FM) QUANTITY 1-UNIT 1-UNIT
3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE
CROSSMAIN (CM) TYPE END SUCTION VERTICAL In-Line
EXACT LOCATION AND DIMENSIONS OF ALL REQUIRED WALL
AND FLOOR OPENINGS. BRANCHLINE (BL) CAPACITY/TDH 300 GPM, @ 90PSI 30 GPM, @ 90 PSI

4. THE EXACT LOCATION OF ALL SPRINKLER HEADS SHALL BE DRIVE ELECTRIC MOTOR ELECTRIC MOTOR
FIRE DEP'T. CONN. (FDC)
COORDINATED WITH THE ARCHITECTURAL CEILING LAYOUT
AND SHALL BE SUBJECTED TO BOTH THE ARCHITECTS AND MOTOR TYPE DIRECT COUPLED-TEFC DIRECT-COUPLED-TEFC
GATE VALVE (GV)
FIRE PROTECTION ENGINEERS APPROVAL.
MOTOR CONTROL WYE-DELTA SIMPLEX TYPE FVNR/DOL SIMPLEX TYPE
ELBOW TURNED DOWN
5. LOCATION OF DRAIN PIPES AND OF THE BACK-UP SUPPLY LINES
ELBOW TURNED UP HP 25 HP APPROX. 2.5 HP APPROX.
SHALL BE COORDINATED WITH THE PLUMBING CONTRACTOR.

CHECK VALVE RPM 3500 RPM 3500


6. LOCATION AND MOUNTING OF FIRE HOSE CABINETS SHALL BE
COORDINATED WITH ARCHITECTURAL FINISHES AND BE SUBJECTED V, 0, HZ 230 V, 3o, 60 HZ 230 V, 3o, 60 HZ
FLUSHING CONNECTION
TO BOTH THE ARCHITECTS AND FIRE PROTECTION ENGINEERS APPROVAL.
FLANGE CONNECTION MODEL/BRAND PACO BY GRUNDFOS OR EQUIVALENT
7. SIZE OF RISER NIPPLES SHALL CONFORM TO PIPE SCHEDULES
AS DELINEATED IN NFPA 13. CUT-IN AND CUT-OFF PRESSURE SWITCH SETTINGS FOR THE
INSPECTOR TEST JOCKEY PUMP SETTINGS
JOCKEY PUMP SHALL BE 80 PSI AND 125 PSI, RESPECTIVELY.
CONNECTION (ITC)
8. PIPE SUPPORTS, HANGERS AND BRACING SHALL BE OF THE
CU-IN PRESSURE SWITCH SETTING FOR THE FIRE PUMP
APPROVED TYPE AND SHALL BE INDEPENDENT FROM CEILING 10 LBS. ABC DRY CHEMICAL FIRE PUMP SETTING
PORTABLE FIRE SHALL BE AT 50 PSI AND SHALL BE STOPED MANUALLY
AND DUCT SUPPORTS. PFE ABC
EXTINGUISHER THROUGH THE FIRE PUMP MOTOR CONTROLLER.
9. LOAD SIDE POWER SUPPLY CONDUIT, ROUGH-INS, AND WIRING TO THE
ALARM CHECK VALVE (ACV)
FIRE PROTECTION EQUIPMENT SHALL BE BY THE FIRE SPRINKLER
CONTRACTOR. BLIND FLANGE

10. CONTROL WIRING AND TERMINATION FROM FLOW SWITCHES TO


SPRINKLER SUPERVISORY ALARM CONTROL PANEL SHALL BE BY THE
FLOOR CONTROL VALVE (FCV) DESIGN COMPUTATION:
FIRE SPRINKLER CONTRACTOR.
FIRE HOSE CABINET (FHC-R)
RECESSED FOR FIRE PUMP: ( HP RATING)
11. SUPPLY, INSTALLATION AND COMMISSIONING OF SUPERVISORY
FIRE HOSE CABINET (FHC-S) 300 GPM x 8.33 lbs/Gal x 210ft.
ALARM CONTROL PANEL SHALL BE BY FIRE SPRINKLER CONTRACTOR. SURFACED HP RATING =
33,000 ft-lbs / min
12. ACCESS FOR CONTROL VALVES SHOULD BE LOCATED AT COMMON AREAS. PENDENT SPRINKLER HEAD
HP RATING = 15.90hp

13. SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR FOR UPRIGHT SPRINKLER HEAD
USING 75% MECHANICAL EFFICIENCY:
FIRE PUMP LAYOUT, PIPE HANGER AND OTHER INSTALLATION AS
15.90HP
REQUIRED AND INDICATED IN THE SPECIFICATION. HP =
0.75
14. ALL PIPES PASSING THRU WALLS AND FLOORS, PROVIDE PIPE SLEEVES. HP = 21 HP
PIPE SLEEVE SHOULD HAVE PLASTIC WATERPROOF HEAT RESISTANT
WATER TANK SCHEDULE USE : 1 unit 25 HP, 3 PHASE, 230 VOLTS, 60 Hz. VOLUME OF CISTERN TANK :
CAULKING COMPOUND WITH OAKUM MASTIC PACKING.
300 GALLONS / min.
15. PROVIDE PIPE HANGER @ EVERY 2 METERS, SWAY BRACE AND VOLUME = x 30 min.
DATA DESIG. FOR JOCKEY PUMP: 7.48 GALLONS / ft.³
CLEVIS SUPPORT @ EVERY 12 METERS.
30 GPM x 8.33 lbs/Gal x 210 ft. VOLUME = 1,203.20 ft.³
16. PROVIDE FLANGE CONNECTION EVERY 12 METERS, AND ONE SIDE SERVICE SURFACE WATER TANK HP RATING =
OF EVERY FITTING CONNECTION. FIRE RESERVE 33,000 ft-lbs / min
VOLUME = 34 m.³
HP RATING = 1.59 hp
LOCATION GROUND FLOOR
USING 75% MECHANICAL EFFICIENCY:

1.59 HP
QUANTITY TWO (2) UNITS @ 15000 L PER TANK HP =
0.75

30 CU. METER HP = 2.12HP


CAPACITY
USE : 1 unit 2.5 HP, 3 PHASE, 230 VOLTS, 60 Hz.

REMARKS MADE OF FRP OR STAINLESS TANK

PROJECT: SHEET TITLE REPUBLIC ACT 9266 SECTION 20 (5) REVISIONS DESIGNED BY: JOB NO.

CD
SHEET NO.
PROPOSED COMMERCIAL SPACE Drawing and Specifications duly signed, stamped or sealed,
DATES REMARKS TYPE

GENERAL NOTES
& REX R. DOMINGUEZ LOCATION:
as instrument of services, are the intellectual properties and AUTOCAD BY:

M-01
documents of the architect, whether the objects for which they
PROFESSIONAL MEHANICAL ENGINEER EQUIPMENT SCHEDULE are made is executed or not. It shall be unlawful for any person,
CATALUNAN GRANDE, DAVAO CITY without the consent of the architect or author of said documents
CHECKED BY:
PTR NO: 1629370 PRC NO: 004511
OWNER:
LEGEND to duplicate or to make copies of said documents for use in the
ENGINEERING repetition of and for other projects or buildings, whether executed
ISSUED ON: 01/03/2019 HYDRAULIC COMPUTATION partly or in whole.
TRACED BY: DATE:
ISSUED AT: DAVAO CITY TIN NO: 939-289-711 JIREH LAND DEVELOPMENT CORPORATION/ DENISE ARQUIZA