Dimensions of Quality
Dimensions of Quality
Dimensions of Quality
6) Serviceability: As end users become more focused on total cost of ownership than
simple procurement costs, serviceability (as well as reliability) is becoming an
increasingly important dimension of quality and criteria for product selection.
8) Perception:' Perception is· reality. The product or service may possess adequate
or even superior dimensions of quality, but still fall victim to negative customer or
public perceptions.
As an example, a high quality product may get the reputation for being low quality
based on poor service by installation or field technicians.
Any serious attempt to deal with quality issues must take into account the costs
associated with quality. Those costs can be classified into three categories:
appraisal, prevention, and failure.
1) Appraisal Costs: Appraisal costs relate to inspection, testing, and other activities
intended to uncover defective products or services, or to assure that there are none.
They include the cost of inspectors, testing, test equipment, labs, quality audits, and
field testing.
3) Failure Costs: Failure costs are incurred by defective parts or products or by faulty
services. Failure cost can be classified into internal and external failures.
i) Internal Failures: Internal failures are those discovered during the production
process.Ex: defective material from vendors, incorrect machine settings,
faulty equipment, incorrect methods.The costs of internal failures include
lost production time, scrap and rework ,investigation ·costs, possible
equipment damage, and possible employee injury.
ii) Extemal failures are those discovered after delivery to the customer. External
failures are defective products or poor services that go undetected by the
producer. Resulting costs include warranty work, handling of complaints,
replacements, iabilitynitigation, payments to customers or discounts used
to offset the inferior quality, loss of customer goodwill etc. External failure
costs are typically much greater than internal failure costs
2) Quality Planning: This planning activity includes discovering customer needs and
developing products and processes to meet those needs.
Quality planning involves the following steps:
i) Identify the Customers
ii) Determine Customer Needs
iii) Translate the Needs :Translate customer needs into the language of the
organization.
iv) Develop Product Features: Develop product features that optimally respond to
customer needs.
DEMING’S 14 PRINCIPLES
1. Create constancy of purpose for improvement of product and service
2. Adopt the new philosophy for economic stability
3. Cease dependence on inspection to achieve quality
4. End the practice of awarding business on the basis of price tag alone….
5. Improve constantly and forever every process for planning, production, and
service,
6. Institute training on the job.
7. Drive out fear.
8. Adopt and institute leadership
9. Break down barriers between department and individuals.
10. Eliminate the use of slogans, exhortations for the work force
11. Eliminate work standards and numerical quotas
12. Remove barriers that rob people of pride of workmanship
13. Institute a vigorous program of education and retraining
14. Define top management’s permanent commitment to ever improving quality.
PLAN
DO
Carry out the process as per the plan. (preferably on a small scale
• Implement the change you decided on in the plan phase.
Review the gathered data to determine if the planned and implemented change has
created the quality improvement intended.
This is a crucial step in the PDCA cycle. After you have implemented the change for
a short time, you must determine how well it is working. Is it really leading to
improvement in the way you had hoped? You must decide on several measures with
which you can monitor the level of improvement. Run Charts can be helpful with this
measurement.
ACT
After planning a change, implementing and then monitoring it, you must
decide whether it is worth continuing that particular change. If it consumed too much
of your time, was difficult to adhere to, or even led to no improvement, you may
consider aborting the change and planning a new one. However, if the change led to
a desirable improvement or outcome, you may consider expanding the trial to a
different area, or slightly increasing your complexity. This sends you back into the
Plan phase and can be the beginning of the ramp of improvement.
If the experiment was not successful, skip the Act stage and go back to the
Plan stage to come up with some new ideas for solving the problem and go through
the cycle again. Plan-Do-Check-Act describes the overall stages of improvement
activity, but how is each stage carried out? This is where other specific quality
management, or continuous improvement, tools and techniques come into play.
4) Circle Leader: Leaders may be from lowest level workers or supervisors. A circle
leader organizes and conducts circle activities
.
5) Circle Members: They may be staff workers. Without circle members the
programmes cannot exist. They are the lifeblood of quality circles. They should
attend all meetings as far as possible, offer suggestions and ideas, participate
actively in group process and take training seriously with a receptive attitude.
CHECK SHEET
• It is simple document is used to collect data in real time.
• Data can be collected easily and concisely.
• The right data could be captured with all necessary facts included.
E.g 1. As when it happened?
2. How many?
3. What customers?
HISTOGRAM
• Information from the checklist of tally chart is used to construct histograms.
These are basic forms that help standardize data collection.
• It summarizes data measured on a continuous scale, showing the frequency
distribution of some quality characteristic.
• Often the mean of the data is indicated on the histogram.
Weight of Soap(GMS)
GRAPHS
• Graphs are perhaps the most widely used but least but talked about tools in
business.
• Graphs are convenient ways to clearly show your data.
• They represent data in a variety of formats.
• There are 3 basic graphs forms
Bar graph
Line graph
Pie graph
BAR GRAPHS
• A bar graph is used to show relationship between groups.
• A series of bars representing the frequency of occurrence of data
characteristic measured on a yes or no basis are shown in the chart.
• The bar height indicates the number of times a particular quality characteristic
was observed.
LINE GRAPHS
• It represents data sequentially with data points connected by line segments to
highlight trends in the data.
• Line graphs are used to show continuing data, how one thing is affected by
another.
PIE CHARTS
• It represents quality factors as slices of a pie: the size of each slice is in
proportion to the number of occurrence of the factor.
• It is used to show how a part of something relates to the whole.
CONTROL CHART
• Quality control charts are graphs on which the quality of the product is plotted as
manufacturing or servicing is actually proceeding.
• It graphically represents the output of the process and uses statistical limits and
patterns of plot for decision making.
• Enables corrective actions to be taken at the earliest possible moment and
avoiding unnecessary corrections.
PARETO CHART
• It is used to graphically summarize and display the relative importance of the
differences between groups of data.
• This is often referred as the 80-20 rule that is , 80 percent of problems are
caused by 20 percent of the potential sources.
• The pareto analysis technique is used primarily to identify and evaluate non
conformities, it can summarize all types of data.
DELAYED
MATERIALS PROCEDURES
FLIGHT
From the above diagram analyzing delays in flight departure. The main problem is
represented by the box at the head of the diagram and is also called ‘fish head’.
The major categories of the potential causes are labeled as structural bones and
likely specific causes as ribs.
SCATTER DIAGRAM
• It is a plot of two variables plotted along two axis used to determine whether
the variables are related.
• Each point on scatter diagram represents one data observation.
• It could be constructed by plotting the number of defective castings found for
each diameter of casting produced.
• After the diagram is completed, any relationship between and number of
defects for shafts of different diameters and the casting process can become
apparent.
• It can be used to examine both variables and attribute data.
7 New QC Tools
Seven new QC tools are fundamental instruments to improve the quality of
the product. They are used to analyze the production process identify the major
problems, Control fluctuations of product quality, and solution to avoid future defect.
Statistical to avoid future defects, Statistical literacy is necessary t0 actively use the
'seven QC tools. These tools use statistical techniques and knowledge to
accumulate data and analyze them.
1) Relations Diagram
2) Affinity Diagram
3) Systematic Diagram
4) Matrix Diagram.
5) Matrix Data Analysis
6) Process Decision Program Chart
7) Arrow Diagram.
State Problem
Matrix Diagram
According to Mizuno, "the matrix diagram method clarifies problematic spots
through multidimensional thinking".
1. The matrix diagram method identifies corresponding elements involved in a
problem situation or event
2. These elements are arranged in rows and columns on a chart that shows the
presence or absence of relationships among collected pairs of elements.
3. Effective problem solving is facilitated at the intersection points, also referred
to as the idea conception points.
Arrow Diagram
According to Mizuno, "the arrow diagram method establishes the most
suitable daily plan is monitors progress efficiently".
The arrow diagram method utilized by PERT or CPM, is a network of lines
that connect all the elements related to plan execution. It is typically represented
graphically either a horizontal or vertical tree structure connecting the elements.
1) Management Responsibility
i) The quality policy shall be defined, documented, understood, implemented, and
maintained.
ii) Responsibilities and authorities for all personnel specifying, achieving and
monitoring quality shall be defined. In-house verification resources shall be defined,
trained and funded.
2) Quality System
i) Procedure shall be prepared.
ii) Procedure shall be implemented.
3) Contract Review .
Incoming contracts (and purchase orders) shall be reviewed to see whether the
requirements are
adequately defined, agree with the bid, and can be implemented.
4) Design Control
i) The design project shall be planned.
ii) Design input parameters shall be defined.
iii) Design output, including crucial product characteristics, shall be documented.
iv) Design output shall be verified to meet input requirements.
v) Design changes shall be controlled.
5) Document Control
i) Generation of documents shall be controlled.
ii) Distribution of documents shall be controiled.
iii) Changes to documents shall be controlled.
6) Purchasing I
1) Potential subcontractors and sub suppliers shall be evaluated for their ability to
provide stated .J.·
requirements
ii) Requirements shall be clearly defined in contracting data.
7) Customer-supplied Material
Any customer - supplied material shall be protected against loss or damage.
9) Process Control
i) Production (and installation) processes shall be defined and planned.
ii) Production· shall be carried out under controlled conditions: documented
instructions, in-process controls, approval of processes and equipment: and criteria
for workmanship.
iii) Special processes that cannot be verified after the fact shall be monitored and
controlled throughout the
processes.
10) Inspection and Testing
i) Incoming materials shall be inspected or verified before use.
. ii) In-process inspection and testing shall be performed.
iii) Final inspection and testing shall be perfoimed prior to release of finished product.
iv) Records of inspection and test shall be kept.
QS-9000 is the name given to the Ouality System Requirements of the automotive
industry which were developed by Chrysler, Ford,- General Motors and major truck
manufacturers and issued in late 1994. The influence of OS-9000 is being seen
throughout the automotive industry as it has virtually eliminated varying demands
and waste associated with redundant systems. Companies that become registered
under OS-9000 will be considered to have. higher standards and better quality
products.
OS-9000 is a quality system standard that focuses on helping automotive suppliers
ensure that they are meeting/exceeding automotive customer requirements. As
mentioned before, it uses ISO 9000 as a core (document contrOl, corrective action,
auditing, etc.), but adds quite a few additional requirements.
1) Design Better Products: Six sigma can and does help many companies to design
better products with less waste and at a lower cost.
2) Improve Quality: Six sigma methodology at its best produces organization-wide
synergy, everyone pulling' together to improve quality, cut costs and drive
profitability.
3)Top Down Approach: The top down approach of six sigma means that what is
found to be good can be capitalized on and what is found to be bad can be removed
quickly, because the very top tier of management are involved and expecting
change, not running away from it.
".
Steps Involved in the Application of Six Sigma
.The methodology of Six Sigma consists of DMAIC and DMADV Cycle. Brief
explanations of the same are as follows.
DMAIC Cycle
1) Define : The primary aim is to identify, within each sub-process, the possibilities
for defects or
quality problems which can be arrived at through the use of different statistical tools,
such as regression analysis, design of experiments and Chi-square testing. The
quality problem which requires breakthrough solution has to be defined clearly in
measurable terms.
2) Measure: The second most important step is the establishment of the metrics that
will be improved using Six Sigma. It is also necessary to identify and.rank the
improvement opportunities.
3) Analyse: This is the stage at which new goals are set, and the route-maps created
for closing the gap between current and target performance levels. It begins with
benchmarking key product performance against the best.Fishbone Diagram, Pareto
analysis, etc. may be used for carrying out the analysis.
4) Improve: The objective of this phase is
i) To confirm the key process variables, and;
ii) Identify the maximum acceptable changes of the specifications; and tackle the
capability of the
process.
iii) If the existing quality level is < 3q': efforts must be directed to improve the
processes so as to achieve at least 3q.
5) Control: The final stage of Six Sigma implementation is to hold the gains that have
been obtained from the 'improve' stage. Unless there Is a good control we are likely
to go back to the original state. Hence, in this
stage, the new process-conditions are documented, and frozen into systems so that
the gains are permanent The process is assessed once more after the setting-in
period in order to check whether the improvements are being sustained or not.