USED PROGRAMS

1. AUTOCAD

If AutoCAD is a fundamental piece for any architectural design in this case of the

Carmen’s hospital, the program would use for the development and preparation of

floor plans, cuts and elevations.

If the architects used AUTOCAD to design the hospital plans, they would had done

together with the civil electrical, and sanitary engineers the architectural, structures,

sanitary installations and electrical installations plans.

2. ETABS

If the civil engineers work with ETABS, the program will be able to provide an

unparalleled set of tools to model and size Carmen’s hospital since the program has

enormous capabilities and is easy to use, being also technologically advanced,

productive and intuitive software.

Also if the civil engineers use the ETABS they can perform more easily the

structural analysis and dimensioning of buildings, as well as the modeling of the

structures and the creation of designs and detail

3. S10

If civil engineers have used the S10 program, they would have prepared the metrics

and the budget based on the unit costs; handling the polynomial formula; Because

the database contains grouped items for construction, the software is also quite

useful for builders and architects.


If the S10 corresponds to the group of specialized programs for Investment Projects,

Project Management, Consultancy and / or work, development and control, this

program allows the user to manage the economic part of a project, since the work

platform can be made, consisting of budget sheets with analysis of unit costs, use of

double currency and polynomial formula, can also generate detailed reports of a

budget.

4. MS PROJECT

If the engineers have planned and controlled the development of the project, they

would have worked with the Ms Project since it is a tool for project management;

obtaining with this program the adequate and effective organization of the tasks, in

order to avoid delays and stay within the budget allocated for the project.

If with the Ms PROJECT it is possible to manage projects, and manage the

allocation of tasks and resources for any type of project, the engineers will reduce

the deadlines of work, detect the vulnerabilities of a project, improve collaboration

between different members and improve decision making, from a vision of the

entire project.