Professional Documents
Culture Documents
REFER
REFER
0 INTRODUCTION 5
1.3 Abbreviation 8
2.1 Erosion-corrosion 9
5.0 CONCLUSION 63
6.0 APPENDICES 64
7.0 REFERENCES 67
FIGURES
Figure 2.1: Pump in Abrasive Service 10
Figure 3.1:: Tripeller 13
Figure 3.2: Front Shroud with Slots to be Inserted with Vanes 15
Figure 3.3: Vanes Protrusion Design 15
Figure 3.4: TIG Welding Jig for Tripeller 16
Figure 3.5: Tripeller Joint Area for Welding 16
Figure 3.6: Example Severe damaged area (P-1320 A) 18
Figure 3.7: Example Severe damaged at Back Shroud (P-1320 A) 19
Figure 3.8: Example of Stellite 6 Cladding on Impeller 19
Figure 3.9: Safety Factor of Weldment at the front Shroud 21
Figure 3.10: Location of simulated area for flow analysis in estimating pump performance curve
based on P-1320 A 22
Figure 3.11: Pump performance curve for multistage pump (Total of 4 stages) 23
Figure 3.12: Wear Ring Location in Sumandak Pump P-1320 A 36
Figure 3.13: Design of Center Bushing with Center Sleeve 38
Figure 3.14: Damage area at Throat Bushing at Pump P-1320 A 40
Figure 3.15: Coating Area of the Internal Volute 47
Figure 3.16: Balance pipeline at the bottom casing for P-1320 A 48
Figure 3.17: Certain painted area on pipeline is scrapped and cleaned for NDT 49
Figure 3.18: Crackspotted on the straight line of the pipe. 50
Figure 3.19: 3D Model of Proposed Pipeline 51
Figure 3.20: List of items in the proposed design 52
Figure 3.21: Section view of the proposed pipeline 52
Figure 3.22: Location of simulated area for erosion analysis 54
Figure 3.23: An example of abrasive attack on both wear ring impeller eye wear ring case eye 54
Figure 3.24: Velocity distribution near WRIE and WRCE area 55
Table 1 1: Overview of Proposed Improvement & Rectification on Pump Parts 6
Table 1 2: P-1320 B COTP Technical Data 7
Table 2 1: Explanation on Figure 2.1 11
Table 3 1: Stellite 6 Chemical Composition 17
Table 3 2: Stellite 6 Chemical Composition 18
Table 3 3: Simulation results of head increase at various flow rate for each stage 22
Table 3 4: Simulation Data 23
Table 3 5: Velocity profile and vector on stage 4 impeller and volute 24
Table 3 6: Fluid Flow at impeller trailing edge of stage 4 25
Table 3 7: Pressure distribution on impeller blade and volute 26
Table 3 8: Material Properties Comparison between A276 SS & Super Duplex (UNS S32760) 29
Table 3 9: : Comparison between Original Design and Proposal Design 30
Table 3 10: Stellite 1 Chemical Composition 32
Table 3 11: Stellite 1 Physical Properties 32
Table 3 12: Material Properties Comparison A747 Grade CB7CU-1 &Duplex Alloy (UNS S32205) 32
Table 3 13: Comparison between Original Design and Proposal Design 33
Table 3 14: Explanation on Figure 23 35
Table 3 15: Comparison between Current Design and Proposal Design 39
Table 3 16: Material properties comparison between A743 CA15 and Duplex Alloy (UNS S32205) 39
Table 3 17: Comparison between Original design and Proposal Design 41
Table 3 18: Material Comparison A747 Grade CB7CU-1 & Duplex Alloy (UNS S32205)) 43
Table 3 19: Material Comparison A276 SS 410 HT429 & Duplex Alloy (UNS S32205) 43
Table 3 20: Comparison between Current Design and Proposal Design 44
Table 3 21: Material Properties Comparism between AISI 410 and UNS S32760 46
Table 3 22: Material Properties for Belzona 1341 (Supermetalglide) 47
Table 3 23: NDT on the balance pipeline 50
Table 3 24: List of material of current and proposed pipeline 53
Table 3 25: Comparison between Current Design and Proposal Design for WR Impeller Eye 56
Table 3 26: Comparison between Current Design and Proposal Design for WR Case Eye 58
Table 4 1: General R&R Scope of Work 61