Bhabhua Grinding Unit, Bihar

Emami Cement Limited


Gas Cutting Set Inspection Checklist
Contractor: Date of Inspection: BGU/HSE/CL 01
Location: Floor / Level:
Gas Cutter:
Frequency: Monthly
Sr. Check Points Y/N/NA Remarks
01 Cylinders used are in upright and secured position.
02 Cylinders in use are kept away from sunlight sparks, and excessive heat.
03 Oxygen and acetylene cylinders are kept safe apart.
04 Cylinders are "Soap solution" tested for leakage.
05 Cylinders are kept away from live electrical cables or ground wires.
06 Cylinders used in the open are provided with shelter.
07 Condition of Regulators / Hoses / Torches / Pressure Gauge.
08 Regulators and torches are in working condition.
09 Hoses are free from tape or wrapping materials used for plugging leaks.
10 Proper connections used for fastening
11 Any kinked or tangled hoses.
12 Hoses protected from mechanical damage or burning.
13 Cutting torches hanging over cylinder.
14 Flash - back arrestor provided for cylinder.
15 Gas cutting Lighter available.
16 Fire extinguisher (ABC type).
17 Area housekeeping provided.
Comments:

Checked By:

ECL HSE Officer: ECL Area Representative: ECL User Head