PIONEER CEMENT LTD

ine-1 & 2 / Department : Electrical & Instrument Root Cause Analysis Report - Period: from 28/08/2018 to 28/09/2018

Production Loss
Unit Code From To Time Lost hr. Reason of Stoppage/Break Down
ton
Raw Mill -1

R1M03-M23 (Raw
15:10 15:25 00 .15 44 R1U13 Root Blower tripped with unit fault
Mill-1 main drives)

Kiln -1

W1Kilin 10:00 10:30 0:00 86.68 PLC breaker tripped

Cement Mill-1

Cement Mill-1 5:00 6:00 01 .00 125


Z1M14 Oil Lubrication pump motor tripped on over
current
Cement Mill-1 6:30 8:45 02 .15 313
om 28/08/2018 to 28/09/2018

Root Cause

STG & STE Malfunction

Due to High Temprature at cooler of Kiln 1, one of


proxy switch cables' insulaton damaged.

During inspection insulation resisitance of one coil was


found weak .