GAD FINAL 4+541 - No.3
300
ALONG - X 6300
2.5%
315
2.5%
SLAB-BOTTOM a2 250
R=50 250 12 175 12330 37 456.21 405
2 ALONG - Y 11900
SLAB-SIDE a3 10 - 11900 2 23.80 15
3 ALONG - Y 11900
280 C/C - b4
SLAB-TOP 6300
4 a4 325 R=40 325 10 220 6890 51 351.39 217
ALONG - X
0 5800
580
145
SLAB-TOP a5 10 220 11600 30 348.00 215
CL SPAN 5 ALONG - Y
20
300 210
SLOPE WITH FRAM 210x210
(FIXED TYPE)
40
6 60
50
A
150
CL SPAN
550
DRAIN PIPE
20 MM
150
EXPANSION JOINT BOTTOM OF
220 C/C - a5
DECK SLAB
2.5 %
175 C/C - a2
12000
10900
C
L CARRIAGEWAY R.C.C RAILING LINE
B B
6 THICK GALVANISED
2.5 %
SLOPE
PLATE (CONFORMING TO
300
I.S. 226)
SLOPE
12 THICK X 40 1. GRADE OF CONCRETE - M:25.
DRAINAGE
SPOUT GALVANISED FLATS 2. STEEL - HYSD BARS AS PER IS - 1786-Fe-500.
SLOPE
(CONFORMING TO I.S.226)
Y 3. AGGREGATE - 20 mm & DOWN GRADED.
300