A1 A2

6400
75 THK R.C.C
WEARING COAT

(EXP. GAP)
FRL - 158.820

HFL - 157.395

A1
NOTES :-
6400
1. TYPE OF BRIDGE - HIGH LEVEL
2. SPAN ARRANGEMENT - 1 X 6.0 M (TOTAL LENGTH OF BRIDGE 6.4 M)
3. OVERALL WIDTH - 12.0 M
500

500
4. CARRIAGEWAY WIDTH - 10.9 M
5. FORMATION LEVEL - 158.820 M

TO RAMGARH
6. SOFFIT LEVEL - 158.145 M
7. H.F.L. - 157.395 M
8. L.W.L. -
P.C.C 9. FOUNDATION LEVEL - VARIABLE
10. TYPE OF FOUNDATION - OPEN FOUNDATION
ABUTMENT 11. TYPE OF SUBSTRUCTURE
U/S D/S A) ABUTMENT - P.C.C. (M-20)
B) ABUTMENT CAP, - R.C.C. (M-25)

TO AMARWARA
& DIRT WALL
C) RETURN WALL - P.C.C. (M-20)
12. TYPE OF SUPERSTRUCTURE - R.C.C. SOLID SLAB (M-25)
13. WEARING COAT - 75 MM R.C.C. WEARING COAT
14. APPROACH SLAB - R.C.C. M-30
15. R.C.C. RAILING - R.C.C. M-30
16. DESIGN LOADING - ONE LANE OF CLASS 70R FOR EVERY TWO
LANES WITH ONE LANE OF CLASS A FOR THE
REMAINING LANES, IF ANY, OR ONE LANE OF
CLASS A FOR EACH LANE.
500

500

17. SOIL BEARING CAPACITY - ABUTMENT - 30 T/ SQ.M.


18. SEISMIC ZONE - III
19. ALL DIMENSIONS ARE GIVEN IN MM UNLESS SPECIFIED.
20. THE FOUNDATION DEPTH IF INCREASES UP TO 1.0M THE SAME DESIGN MAY
BE FOLLOWED AND IF MORE THAN 1.0M THAN REFER THE DESIGNER.
21. DRAWING NOT TO SCALE.

CLIENT :-
AMARWADA - RAMGARH ROAD
Executive Engineer M/s RAJARAM CONSTRUCTION
ISSUED ON 04-01-2020
MP PWD Division GENERAL ARRANGEMENT DRAWING
CHHINDWARA APPD : REVISION - CH.- 3+340
SAWYTECH ENGINEERING SERVICES
Scale : NTS DRAWN BY A.A.R Dwg No. : MPPWDC / AR / 01 SUB ENG. SUB DIV. OFFICER EXECUTIVE ENG.