Professional Documents
Culture Documents
RAM 70 PM Requirements: Operation Type of Check Required Materials Interval of Check Action
RAM 70 PM Requirements: Operation Type of Check Required Materials Interval of Check Action
RAM 70 PM Requirements: Operation Type of Check Required Materials Interval of Check Action
REPLACE MAIN OIL FILTER CARTRIDGE ANNUAL NEW FILTER 2000 HRS OR 4 MONTHS REMOVE AND REPLACE
OIL ANALYSIS TAKE SAMPLE N/A AT OIL FILTER CHANGE SEND OIL SAMPLE IN FOR ANALYSIS
SE 30 MULTIPURPOSE
GREASE MAIN HYDRUALIC PUMP MOTOR MAINTAINANCE GREASE MONTHLY PUMP 2 PUMPS OF GREASE IN EACH ZERK
SE 100 GREASE
FILL GREASER RESERVOIR MAINTENANCE DAILY FILL TO FILL LINE
OILER TANK MAINTAINANCE PROFORM 858 DRAWLUBE FILL AS NEEDED FILL TANK
INSPECT TOOLS VISUAL N/A EVERY SHIFT INSPECT FOR WEAR REPLACE AS NEEDED