Turn The Power Switch On': Test Procedure Test Setup

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CRP

Test Setup Test Procedure


Test Components 1 Turn the power
switch ‘On’ 1 Draw whole blood 3 Shake the tube 6 Insert the test cartridge

10
times
ID Chip P
CR

Sample
Collector

7 Press ‘Select’

2 Insert ID Chip
4 Discard two drops

Detection
Buffer Tube

Test Cartridge 2
drops
3mins
After 3 minutes

3 Press ‘Select’
5 Load the
sample mixture
Reader 2 Assemble the sample
collector with detection 8 Read the test result
buffer tube

Result

2
4 Make a Puncture drops

Important

Rev.00.130530_CRP
Allow ‘Detection Buffer Tube’ to attain
room temperature at least for
30 minutes before performing the test

Make sure that lot number of the


‘ID Chip’ is exactly same as the lot
number of ‘Test Cartridge’ and
Detection Buffer Tube’

You might also like