Project : 3TORRE LORENZO

Location : PABLO OCAMPO SR ST. MALATE MANILA


Subject : MEPFS ACTIVITIES
As of : September 09, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PRO SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping/Riser Riser Cross Main Branches Droppings Waste Water Line Vent
FE-01 FE-02 &Power
G
2ND
3RD (LOWER)
3RD (UPPER)
4TH N/A N/A N/A
5TH N/A N/A N/A
6TH N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A
11TH N/A N/A N/A
12TH N/A N/A N/A
14TH N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A
17TH N/A N/A N/A
18TH N/A N/A N/A
19TH N/A N/A N/A
20TH N/A N/A N/A
21ST N/A N/A N/A
22ND N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A
25TH N/A N/A N/A
26TH N/A N/A N/A
27TH N/A N/A N/A
28TH N/A N/A N/A
29TH N/A N/A N/A
30TH N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A
33RD N/A N/A N/A
34TH N/A N/A N/A
35TH N/A N/A N/A
36TH N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : September 16, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PRO SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping/Riser Riser Cross Main Branches Droppings Waste Water Line Vent
FE-01 FE-02 &Power
G
2ND
3RD (LOWER)
3RD (UPPER)
4TH N/A N/A N/A
5TH N/A N/A N/A
6TH N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A
11TH N/A N/A N/A
12TH N/A N/A N/A
14TH N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A
17TH N/A N/A N/A
18TH N/A N/A N/A
19TH N/A N/A N/A
20TH N/A N/A N/A
21ST N/A N/A N/A
22ND N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A
25TH N/A N/A N/A
26TH N/A N/A N/A
27TH N/A N/A N/A
28TH N/A N/A N/A
29TH N/A N/A N/A
30TH N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A
33RD N/A N/A N/A
34TH N/A N/A N/A
35TH N/A N/A N/A
36TH N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : September 24, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PRO SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping Riser Riser Cross Main Branches Droppings Waste Water Line
FE-01 FE-02 &Power
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Vent Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : September 28, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PRO SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping Riser Riser Cross Main Branches Droppings Waste Water Line
FE-01 FE-02 &Power
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Vent Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : September 30, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PRO SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping Riser Riser Cross Main Branches Droppings Waste Water Line
FE-01 FE-02 &Power
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Vent Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : October 07, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PRO SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping Riser Riser Cross Main Branches Droppings Waste Water Line
FE-01 FE-02 &Power
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Vent Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : October 15, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main Riser Waste Water Line
FE-01 FE-02 &Power
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Vent Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : October 22, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION SANITARY
Ducting Installation Wiring Installation
LEVEL
Stair Pressurization Lightings
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main Riser Waste Water Line
FE-01 FE-02 &Power
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A
38TH N/A N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
SANITARY

Vent Riser
Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : October 29, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : November 05, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : November 05, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : November 19, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : December 04, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : December 04, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : December 04, 2019

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : January 07, 2020

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Lightings Auxiliary Water Line Inst. Looping Riser Branches Droppings Cross Main
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct FDAS
FE-01 FE-02 &Power
Fiber Int/Db PABG CCTV
G N/A
2ND N/A
3RD (LOWER) N/A
3RD (UPPER) N/A
4TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
6TH N/A N/A N/A N/A
7TH N/A N/A N/A
8TH N/A N/A N/A N/A
9TH N/A N/A N/A
10TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
14TH N/A N/A N/A N/A
15TH N/A N/A N/A
16TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
20TH N/A N/A N/A N/A
21ST N/A N/A N/A N/A
22ND N/A N/A N/A N/A
23RD N/A N/A N/A
24TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
30TH N/A N/A N/A N/A
31ST N/A N/A N/A
32ND N/A N/A N/A N/A
33RD N/A N/A N/A N/A
34TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
37TH N/A N/A N/A N/A
38TH N/A N/A N/A
RD N/A N/A

LEGEND:
Prepared by:
ON GOING
Engr. Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Engr. Ronald Iting


PMCSI - MEPFS Head
FIRE PROTECTION SANITARY

Riser Waste Water Line Vent Riser


Project : 3TORRE LORENZO
Location : PABLO OCAMPO SR ST. MALATE MANILA
Subject : MEPFS ACTIVITIES
As of : January 21, 2020

MECHANICAL ELECTRICAL/ELECTRONICS
PLUMBING FIRE PROTECTION SANITARY
Ducting Installation Wiring Installation
LEVEL Stair Pressurization
Auxiliary
Supply Duct Fresh Air Duct Kitchen Exhaust Duct Exhaust Duct Lightings &Power FDAS Water Line Inst. Looping Riser Branches Droppings Cross Main Riser Waste Water Line Vent Riser
FE-01 FE-02
Fiber Int/Db PABG CCTV
RD N/A N/A
38TH N/A N/A N/A
37TH N/A N/A N/A N/A
36TH N/A N/A N/A N/A
35TH N/A N/A N/A N/A
34TH N/A N/A N/A N/A
33RD N/A N/A N/A N/A
32ND N/A N/A N/A N/A
31ST N/A N/A N/A
30TH N/A N/A N/A N/A
29TH N/A N/A N/A N/A
28TH N/A N/A N/A N/A
27TH N/A N/A N/A N/A
26TH N/A N/A N/A N/A
25TH N/A N/A N/A N/A
24TH N/A N/A N/A N/A
23RD N/A N/A N/A
22ND N/A N/A N/A N/A
21ST N/A N/A N/A N/A
20TH N/A N/A N/A N/A
19TH N/A N/A N/A N/A
18TH N/A N/A N/A N/A
17TH N/A N/A N/A N/A
16TH N/A N/A N/A N/A
15TH N/A N/A N/A
14TH N/A N/A N/A N/A
12TH N/A N/A N/A N/A
11TH N/A N/A N/A N/A
10TH N/A N/A N/A N/A
9TH N/A N/A N/A
8TH N/A N/A N/A N/A
7TH N/A N/A N/A
6TH N/A N/A N/A N/A
5TH N/A N/A N/A N/A
4TH N/A N/A N/A N/A
3RD (UPPER) N/A
3RD (LOWER) N/A
2ND N/A
G N/A

LEGEND:
Prepared by:
ON GOING
Dzulkifli Abbas INSTALLED
PMCSI - Project Electrical Engineer INSTALLED and TESTED

Noted by:

Ferdinand M. Ramos
PMCSI - Construction Manager

You might also like