TASK CODE: - PROJECT: 9M-POS-1 ITEM NO: 11659-0016

ROUTINE WORK CARD


ÍÂÂ+azÂÂ!È63Î
A/C MSN A/C TYPE ZONES MAINT. CHECK ISSUED BY STATION RII YES NO X
Duplicate Inspection Item
RAKBAR CGK
25099 B737-400 SCMT YES NO X
Safety Critical Maintenance Task

TASK# Source Card : TEAM MH ESTIMATED: 60 MH APPROVED: 60


SKILLS CRS A&P B1
JOB DESCRIPTION
AIRCRAFT VERTICAL STABILIZER FLIGHT CONTROL BALANCING

PN: 65C25841-51
SN: 1061

ACTION

Please ensure detailed action, result and maintenance reference are recorded while applicable

PERFORMED

Reference :

Issued NRC:

11687-0082, 11687-0084
NO YES NRC No.

CONSUMABLE REFERENCE TOOLS & EQUIPMENT REFERENCE


P/N Description QTY Reference P/N Description QTY Reference

COMPONENT / MATERIAL USED


DESCRIPTION P/N OFF S/N OFF P/N ON S/N ON POS TAG NO QTY

RUDDER AY 65C25841-51 1061 65C25841-51 1061 TAIL 1

Certifies that the work specified, except as otherwise specified, was carried out in accordance with PERFORMED INSPECTED DUPLICATED
DGCA and in respect to that work the aircraft/aircraft component is considered ready for release to BY BY BY
service. PT AVIA TECHNICS DIRGANTARA AMO Approval No: 145D-950

DATE: DATE: DATE:

ATD-Form No. F002 Rev 1 Date 07 Feb 2020 Routine Work Card
Page 1 of 3
PROJECT: 9M-POS-1
CONTINUATION
SHEET ITEM NO: 11659-0016

A/C MSN A/C TYPE MAINT. CHECK ZONES ISSUED BY STATION RII YES NO
RAKBAR Independent Inspection Item

25099 B737-400 CGK SCMT YES NO


Safety Critical Maintenance Task

TASK#

CARD STEPS

Please ensure detailed corrective actions and maintenance references are recorded where applicable.

1 Description: PHASE 1

PERFORM RUDDER INSTALLATION

Action:

Certifies that the work specified, except as otherwise specified, was carried out in accordance with DGCA PERFORMED INSPECTED DUPLICATED
and in respect to that work the aircraft/aircraft component is considered ready for release to service. PT BY BY BY
AVIA TECHNICS DIRGANTARA AMO Approval No: 145D-950

DATE: DATE: DATE:


Please ensure detailed corrective actions and maintenance references are recorded where applicable.

2 Description: PHASE 2

PERFORM RUDDER SENDING OUT TO SHOP FOR BALANCING

Action:

Certifies that the work specified, except as otherwise specified, was carried out in accordance with DGCA PERFORMED INSPECTED DUPLICATED
and in respect to that work the aircraft/aircraft component is considered ready for release to service. PT BY BY BY
AVIA TECHNICS DIRGANTARA AMO Approval No: 145D-950

DATE: DATE: DATE:


Please ensure detailed corrective actions and maintenance references are recorded where applicable.

3 Description: PHASE 4

PERFORM RUDDER INSTALLATION

Action:

Certifies that the work specified, except as otherwise specified, was carried out in accordance with DGCA PERFORMED INSPECTED DUPLICATED
and in respect to that work the aircraft/aircraft component is considered ready for release to service. PT BY BY BY
AVIA TECHNICS DIRGANTARA AMO Approval No: 145D-950

DATE: DATE: DATE:

ATD-Form No. F002 Rev 1 Date 07 Feb 2020 Routine Work Card
Page 2 of 3
PROJECT: 9M-POS-1
CONTINUATION
SHEET ITEM NO: 11659-0016

A/C MSN A/C TYPE MAINT. CHECK ZONES ISSUED BY STATION RII YES NO
RAKBAR Independent Inspection Item

25099 B737-400 CGK SCMT YES NO


Safety Critical Maintenance Task

TASK#

ATD-Form No. F002 Rev 1 Date 07 Feb 2020 Routine Work Card
Page 3 of 3