MIS Action Item Summary

Request
No. Module Item No. Action Item Status Section

I 1 On-Site Repair Monitoring Finished Assy

2 Line Out Enhancement Finished Assy

3 Send to Accounting Data Report Making Finished Assy

4 Variance Monitoring on-going N/A

5 Tools and Jigs Control on-going Assy

6 Attendance Monitoring Finished Assy

7 Manhour Report Making Assy

8 Tablet Inventory Enhancement N/A

9 Process Lay-out Simulator Finished Assy

10 Actual Yamazumi Analysis Assy

11 * Assembly Line Management System Assy

12 Tool Crib Management System Assy


MIS Action Item Summary
No. Module Action Item Status

1 Manhour Control Actual Yamazumi


If there are the same process no. but different div.F,
please make graph combine like stack graph.

Design Yamazumi Please add print,Edit,save and process simulator function


2 (Weighted) like in Single unit design yamazumi simulator

3 If there's no work, no need show graph


Combined Man-Hour
4 Please Add Export

5 Skill Control Status Over-All revision

6 Skill Map Additional Function on Skill Map Tablet Data (same


fuction as old skill map)

7 Transfer old Skill Map from MIS to ATS

8 If Line Code is "-RCI" and "-FIQ", No Need Assy

9 4M Manpower Status

10 Attendance Monitoring

11 Attendance Summary

12 Attendance Rate
Assembly Line Management System
Control Functions
Repair Slip

Tool Crib Management System


Tools & Jigs Control
Tools
Jigs

In-Direct Material Control


Office Supplies
Production Supplies
Kaizen Supplies
No. Activities of staff in line
1 Checking of TRP/Assembly Damage
2 Checking of lacking parts
3 Checking of leave
4 Line checking by using LSS checksheet
5 Signing of IMTE, Bit, Jigs, anti-static and torque checksheet
6 Daily checking of attendance
7 Daily inventory of stock units
8 Daily overtime schedule
9 Daily manhour report
10 Updating of MIS
11 Updating of 4M (manpower line encoding)
12 Checking of N.G. units and status in LOS
13 Monitoring of daily output
14 Updating Actual yamazumi result
15 Revise checksheet
16 Control of trainee's (update training plan, checking parallel training on ATS)
17 Line balancing
18 Manpower plan and adjustment
19 Manpower layout
20 Monitoring of SY and SS
21 Change application
22 Requesting serial label
23 Checking and request of work ticket and QR code
24 Checking of drop parts box
25 Inputting of confirmation error of tblet
26
Remarks

0.7 50 35 1.428571
0.5 50 25 2
0.2 50 10 5

1.4 50 70 0.714286

0.7 10 7 1.428571
0.5 30 15 2
0.2 20 4 5

1.4 60 26 2.307692
84 0.714286
8.428571
assy insp a+i
7 1.4 8.4
10 10 10
70 14 84
0.142857 0.714286 0.119048

Staff Checksheet
Repair Slip
Checksheet Making
Ticket Request
System Link
MIS
ATS
LOS