BILL NO. 1
MAIN HOUSE
ELEMENT NO. 1
E. Extra over for excavating in rock class II irrespectiveof depth 10 CM 1200 12,000
Filling
Concrete Works
1/1
Vibrated reinforced concrete class 20/20 in:-
Fabric mesh
H. Fabric mesh Ref. No. A142 (measured net) (No allowance for
laps) 136 SM 450 61,200
COLLECTION
1/2
ELEMENT NO. 2
SUPERSTRUCTURE CONCRETE
ELEMENT NO. 3
1/3
WALLING
ELEMENT NO. 4
1/4
ROOF
Roof Covering
E. Extra over for raking cutting valley and hip tiles 85 LM 50 4,250
Metal work
P. 300 x 12mm diameter 'J' bolts complete with head nuts and
washers built into concrete to hold wall plate 65 NO 120 7,800
Eaves Finishes
1/5
A. 250 x 38mm fascia and barge board 90 LM 600 54,000
C. 100 x 25mm T&G eaves boarding nailed to battens (m/s) 50 SM 1200 60,000
Rainwater goods
COLLECTION
ELEMENT NO. 5
DOORS
1/6
A. 100 x 50mm frame with 3 labours 68 LM 600 40,800
Flush Doors
F. 45 x 830 x 2075mm high solid core flush door lined with 2mm
thick beech effect veneer both sides hardwood lipped all round
including block for ironmongery 7 NO 7000 49,000
Fan lights
K. 4mm thick clear sheet glass and glazing with beads (m/s) in
panes between 0.15sm and 0.5sm 3 SM 1500 4,500
1/7
B. 4-Lever metal casement lock Ref. 22931 complete with solid
stainless steel lock furniture ref. 2000RRS31 5 NO 4000 20,000
C. 3-Lever mortice lock ref. 2270 complete with lock furniture ref.
2000RRS35 7 NO 3500 24,500
E. 38mm diameter x 59mm deep half moon rubber door stop ref.
DS100 12 NO 200 2,400
F. 25mm wide x 300mm girth metal cramp once bent, twice drilled,
one end screwed to timber frame and other split and built into
masonry 60 NO 100 6,000
Touch up primer after fixing and apply three coats gloss oil paint
to metal
COLLECTION
ELEMENT NO. 6
WINDOWS
1/8
The following in purpose made steel casement windows in 40mm
wide x 3mm thick heavy duty 'T' and 'Z' section frame including
mullions, transomes in-built mosquito proof gauze permanent
vents hood with at top, high quality heavy duty polished brass
ironmongery to M/s Kensmetal Ltd or other equal and approved
fasteners, window stays, fixing lags, and apply primer before fixing
(small panel windows) with and including intergrated burglar
proofing in 20mm thick solid bars welded horizontally and
vertically in line with opening light casement, transomes and
mullions
Glazing
B. 4mm thick clear glass and glazing with putty in panes between
0.1SM and 0.5SM 34 SM 1200 40,800
Touch up primer after fixing and spray apply three coats gloss oil
paint to metal
ELEMENT NO.7
FINISHES
1/9
A. 12mm cement/sand (1:4) render to wall, beams, columns to
receive paint 124 SM 400 49,600
F. 250 x 250mm thick patterned glazed wall tiles fixed with adhesive
to rendered surfaces (m/s) with and including rounded plastic
edge tiles (2100mm high) 74 SM 1400 103,600
Floor Finishes
G. 32mm thick to receive tiles (m/s) (wet areas only) 25 SM 400 10,000
H. 40mm thick coloured screed steel trowelled hard and smooth 157 SM 450 70,650
M. 400 x 400 x 8mm thick fixed onto prepared screed (m/s) with
manufacturer's approved adhesive 25 SM 1500 37,500
Ceiling
1/10
B. Soffits of staircase landing 2 SM 400 800
Trap door
COLLECTION
ELEMENT NO. 8
1/11
A. Plastered niches and reveals not exceeding 200mm wide 122 LM 100 12,200
ELEMENT NO. 9
Dhobi tops
1/12
A. 600 x 900mm high comprising 100mm thick concrete (1:3:6)
plinth finished in ceramic tiles, 75mm thick concrete (1:2:4)
worktop reinforced with BRC mesh No. A142 finished in granito
tiles top and 75mm fascia, 100mm thick masonry support walls
plastered and finished in ceramic wall tiles both sides, including
forming 1No. opening for dhobi sink, chase in wall and make good
disturbed areas 2 LM 12000 24,000
Vanity tops
Staircase railing
Balcony/Passage railing
Prepare and apply red oxide primer and three coats gloss oil paint
to metal
Concrete plinth
ELEMENT NO. 10
Builder's Work
1/13
The builders work shall include but not limited to
Electrical Work
Mechanical Engineering
SUMMARY
ELEMENT
1/14
2 Superstructure " " 1/3 1,053,465
BILL NO. 2
Electrical Installations
A. Provide the Provisional Sum for Electrical Installation Works Sum 150,000
Mechanical Installations
1/15
B. Provide the Provisional Sum for Mechanical Installation Works Sum 350,000
Joinery Works
Sewer Drainage
Contingency
1/16
2 Bill No. 1 Main House 1\15 5,523,305
Prepared by:-------------------------------------------------------
Signature:----------------------------------------------------------
Date:-----------------------------------------------------------------
1/17
1/18
1.4m high
1/19
1/20
1/21
1/22
4425
1/23
1/24
1/25
1/26
1/27
1/28
1/29
1/30
1/31
23014
1/32
1/33
1/34