EMPLOYMENT EXPERIENCE
Page 1 of 3
POST EMPLOYER /
PERIOD PROJECT COMPLETED/EXPERIENCE
HELD SUPERVISOR
2017 - 2019 Civil Site Capital Development Project Name : Prime Minister’s Education Reform
Engineer Authority (C.D.A) Program (Islamabad)
Islamabad, Pakistan Completed Construction Projects of School Buildings and
(Engr. Waqas Farid related Civil Works from Estimation, Foundation,
Contact # +92 - 321 - Shuttering, Roof Slab Concrete, Steel Works,
551 - 5500) Measurements and Billings.
2015 - 2017 Project Warranty Home Project Name : Jazan Economic City Besha (Aramco
Manager International Co. LTD, Project) (K.S.A.)
KSA - Jazan Economic Erection and Completion of Grid Station Structures and
city Beash (Aramco Building including Land Survey, Levelling, Procurement
Project) of Stores, T & P, Materials and Equipment, Esimation, Pile
(Engr Azam Hashmi Foundation on cornash and Concrete Works. Performed
Contact #: +966 - 50 - regular job site observations to provide direction for
460 - 9613) general contractor personnel and subcontractor labours.
2011 - 2012 Project Desert Wave Project Name : Modification& Renovation Umm-Ul-
Engineer Contacting Co. LTD Qurah University Makkah (K.S.A.)
(Muhammad Ashraf Supervioused, Repair, Maintance, Modification and
Contact: 00966-676 - Renovation of umm-ul-Qurah university including
4854) Estimation and billing, Installation of Emergency Alarm
System, Fire Fighting System
2007 - 2011 Constructio Saudi-Bin-Ladan Project Name : Improvement of Jamarat Bridge &
n Site Group, Makkah, Saudi Surrounding Area in Mina, Makkah, Saudi Arabia
Engineer Arabia Co-ordinated and ficilitated onsite Consultant, Regulatory
(Mounir Dabdound and Client representative inspections Inchuding,
Contact: + 966 -2640 - Improvement of Jammarat Bridge and surrounding ares in
0004) Mina, Raft foundation, Steel Cutting, Bending, Fixing.
Page 2 of 3
2006 - 2007 Project Al-Maward Saudi Project Name : General Hospital, Najran Saudi Arabia
Engineer EST, Najran, KSA. (200 Beds)
(Sami Abrahim Bagis Performed constructability reviews consisting of
Contact: +966 - 2661 independent, structured assessment of construction bid
-5046) document to promote coordination, eliminate ambiguity anf
minimize project issuses, Including all finishing work
(plastering, flooring, tile work, doors and windows
installation) of 250 beds government hospital.
2005 - 2006 Quality Saudi-bin-Ladan Project Name : MOI (Central Security Buildings)
Assurance Group, Jeddah, KSA. worked under Bahara Precast Factory, Jeddah Saudi
and Quality (Sheikh Sajjad Arabia
Control Hussain Collecion of data on integration issues and vulnerabilities
Engineer Contact: +966 - 2591- and reported all findings including improvement
4444) recmmendations of MOI (Central Security Buildings)
worked under Bahara Precast Factory.
2002 - 2003 Constructio Ali Abdullah Al-Qarni Project Name : Telecom Network in Jeddah
n Site EST, Jeddah, KSA. Set work schedules, coordinated site facilities and
Engineer (Abdullah Ali Al- monitored progress of Telecom Network such as Land
Qarni survey, Asphalit cutting, Excavation of trenches,
Contact: +966 - 5459 Undergrounding Fiber Optics.
-6268)
REFERENCES
Available on Request.
Page 3 of 3