MAN-POWER REPORT

CONTRACT NO. : 20104 DAY : SATURDAY


PEOJECT NAME : SWCC- Satellite Desalination Plant Along West Coast of Saudi Arabia DATE : 2-May-2020
LOCATION OF PROJECT : Al-Wajh WEATHER/TEMP : Sunny
CLIENT : SWCC DAYS FROM NTP :
CONTRACTOR : ASRF
SUB CONTRACTORS BRC, JF and Al-Saad

INDIRECT & DIRECT MANPOWER

Main Contractor Sub-Contractors


S.N POSTION
ASRF Building Roots Jeddah Foundation Alsaad Co
1 Project Manager 1
2 Site Engineer 2
3 Civil Engineer 1
6 HSE (Safety) 3
7 QA/QC 0
8 Surveyor/ Asst Surveyor 4
9 Document Controller 0
10 Site Supervisor 1
11 Site Foreman 4
12 Office boy 0
13 Concrete Lab 2
14 Storekeeper 1
15 Carpenter 22
16 Steel Fixer 12
17 Labor/ Helper 18
18 Electricaian 8
19 Mechanic 0
20 Mason / Plastering 4
21 Mechanical Technician 0
22 Mobile crane operators 1
23 Excavator Operator 0
24 Boomtruck opertator 1
25 Forklift Operator 1
26 Bobcat Operator 1
27 Rigger / Flagman 2
28 Dump Truck 1
29 Wheel Loadar 1
30 Painter 9
31 Waterproffing / Epoxy 30
32 Welder 1
33 Door Installation Carpenters 2
34 Driver 1
34 Roller Compactor 1
35 Steel Structure 0
36 Tiles Installers 0

Total 135
NIGHT SHIFT MANPOWER

1 Site Engineer 0
2 Site Foremen 0
3 Safety 0
4 Steel Fixer 0
5 Carpenter 0
6 Bobcat Operatopr 0
7 Mobile Crane Operator 0
8 Rigger 0
9 Electrician 0
10 Labors 0
11 Painter / Epoxy 0
12 Waterproffoing 0
13 Dewatering Pump Oprator 0
14 Steel Structure 0

Total 0 0 0 0
GRAND TOTAL MANPOWER FOR MAIN-CON & SUB-CON 0