40.

02 Basic information 0212145-00

1 Basic information
Note
u Load values in the load charts are noted in tons (t), kilo pounds (kips) or pounds (lbs).
u The radius is the horizontal distance of the hook block from the rotation axis of the crane super-
structure, measured on the ground. The boom flexation is taken into account.
u In the provided loads, the weight o the hoist rope at reeving according to the load chart has been
taken into account. If higher reeved, then the load is reduced by the weight of the additional strands
of the hoist rope. The weights of the load lifting equipment and the fastening equipment must be
deducted from the given load value.
u In two-hook operation, the hoist rope on the second load position has not been taken into account.
The weight of all strands of the hoist rope on the second load position must be deduced from the
load value.
u For number values, the decimal digits are separated with a period “.” . Decimal digits are on the
right of the period “.”.

WARNING
Erroneous operation of crane!
Toppling crane, failure of crane structures.
Death or severe injuries, high property damage.
u Working outside the permissible set up configurations, boom radii and slewing ranges according to
the load chart is prohibited.
u Move the boom system even without a load only within the permissible ranges according to the
load charts or erection and take down charts.
u Move the boom systems when “assembly operation” is engaged only within the permissible ranges
according to the load charts or erection and take down charts.
u In part limits and notes with character signs (signs, numbers or letters) are given in operating mode
icons. They must be adhered to.

Note
In operating modes with ballast trailer or suspended ballast:
u Determine the optimum derrick ballast weight with the LICCON job planner.
LWE//415400-03-02/en

copyright © Liebherr-Werk Ehingen GmbH 2017


40.02 – 3/3