Quotation Ma'am Jane

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 15

January 24, 2020

Project: Renovation of 2-Storey Residential House


Location: San Pablo City, Laguna
Subject: Quotation for total renovation
Contact Person: Ms. Bermie Jane Albuyog

ITEM DESCRIPTION QTY UNIT MATERIAL COST LABOR COST UNIT COST AMOUNT
ROOFING AND FRAMING WORKS Angle Bar 2"x2"x4.5mm 10.00 pcs. 1,180.00 472.00 1,652.00 16,520.00
Purlins 2"x4"x1.35mm 15.00 pcs. 580.00 232.00 812.00 12,180.00
10mmØ Sagrods 7.00 pcs. 160.00 64.00 224.00 1,568.00
Rib type roofing 28.80 l.m 380.00 152.00 532.00 15,321.60
Bended Accessories 5.00 pc 1,000.00 400.00 1,400.00 7,000.00
Consumables 2,629.48
CEILING WORKS Ficem Board 6mm 22.00 pcs. 400.00 160.00 560.00 12,320.00
Theaded rod and washers 40.00 pcs. 65.00 26.00 91.00 3,640.00
Metal Furrings 50.00 pcs. 120.00 48.00 168.00 8,400.00
C-Channel 32.00 pcs. 80.00 32.00 112.00 3,584.00
Consumables 1,397.20
PAINTING WORKS Skimcoat 25.00 bags 560.00 224.00 784.00 19,600.00
Flat Latex 8.00 gal. 470.00 188.00 658.00 5,264.00
Topcoat 8.00 gal. 900.00 360.00 1,260.00 10,080.00
Consumables 1,747.20
WALL PARTITIIONS Metal Studs 20.00 pcs. 400.00 160.00 560.00 11,200.00
Gypsum Board 20.00 pcs. 70.00 28.00 98.00 1,960.00
Consumables 658.00
KITCHEN CABINET Overhead Cabinet 1.00 l.s. - 18,000.00 18,000.00
Lavatory Storage 1.00 l.s. - 25,000.00 25,000.00
PLUMBING WORKS Re-Installation/Additional fixtures 1.00 lot. - 20,000.00 20,000.00
ELECTRICAL WORKS Re-Installation/Additional fixtures 1.00 lot. - 20,000.00 20,000.00
STRIPPING Stripping/ Termination of Termites 1.00 lot. 35,000.00 35,000.00
WINDOWS Aluminum Fix Window with 6mm Glass 4.36 sq.m 8,750.00 38,150.00
TOTAL 291,219.48
Floor Area
30.66 sq.m

Considerations for Painting Works


Ceiling by sq.m
61.32
Wall
77.5632
Total for Painting
138.8832
6

24.5
31.5
SCOPE OF WORK DESCRIPTION
ROOFING AND FRAMING WORKS Angle Bar 2"x2"x4.5mm
Purlins 2"x4"x1.35mm
10mmØ Sagrods
Rib type roofing
Bended Accessories
Consumables
CEILING WORKS Ficem Board 6mm
Theaded rod and washers
Metal Furrings
C-Channel
Consumables
PAINTING WORKS Skimcoat
Flat Latex
Topcoat
Consumables
WALL PARTITIIONS Metal Studs
Gypsum Board
Consumables
FIRE WALL EXTENSION Construction of Reinforced Concrete Fire Wall
KITCHEN CABINET Overhead Cabinet
Lavatory Storage
PLUMBING WORKS Re-Installation/Additional fixtures
ELECTRICAL WORKS Re-Installation/Additional fixtures
INTERIOR MAINTENANCE Stripping/ Termination of Termites/ Clean-up
WINDOWS Aluminum Fix Window with 6mm Glass
QTY UNIT MATERIAL COST LABOR COST UNIT COST AMOUNT
10.00 pcs. 1,180.00 472.00 1,652.00 16,520.00
15.00 pcs. 580.00 232.00 812.00 12,180.00
7.00 pcs. 160.00 64.00 224.00 1,568.00
28.80 l.m 380.00 152.00 532.00 15,321.60
5.00 pc 1,000.00 400.00 1,400.00 7,000.00
2,629.48
22.00 pcs. 400.00 160.00 560.00 12,320.00
40.00 pcs. 65.00 26.00 91.00 3,640.00
50.00 pcs. 120.00 48.00 168.00 8,400.00
32.00 pcs. 80.00 32.00 112.00 3,584.00
1,397.20
25.00 bags 560.00 560.00 14,000.00 0
8.00 gal. 470.00 470.00 3,760.00 0
8.00 gal. 900.00 900.00 7,200.00 0
1,248.00
20.00 pcs. 400.00 160.00 560.00 11,200.00
20.00 pcs. 380.00 152.00 532.00 10,640.00
1,092.00
10.34 sq.m 662.00 6,845.08
1.00 l.s. - 18,000.00 18,000.00
1.00 l.s. - 25,000.00 .
1.00 lot. - 20,000.00 20,000.00
1.00 lot. - 20,000.00 20,000.00
1.00 lot. 35,000.00 35,000.00
4.36 sq.m 8,750.00 38,150.00
TOTAL 271,695.36
Floor Area
30.66 sq.m

Considerations for Painting Works


Ceiling by sq.m
61.32
Wall
77.5632
Total for Painting
138.8832
6

24.5
31.5
Angle Bar 2"x2"x4.5mm 10 pcs. 1180
Purlins 2"x4"x1.35mm 15 pcs. 580
10mmØ Sagrods 7 pcs. 160
Rib type roofing 28.8 l.m 380
Bended Accessories 5 pc 1000
Consumables
Ficem Board 6mm 22 pcs. 400
Theaded rod and washers 40 pcs. 65
Metal Furrings 50 pcs. 120
C-Channel 32 pcs. 80
Consumables 0
Skimcoat 25 bags 560
Flat Latex 8 gal. 470
Topcoat 8 gal. 900
Consumables
Metal Studs 20 pcs. 400
Gypsum Board 20 pcs. 380
Consumables
Construction of Reinforced Concrete Fire Wall 10.34 sq.m
Overhead Cabinet 1 l.s.
Lavatory Storage 1 l.s.
Re-Installation/Additional fixtures 1 lot.
Re-Installation/Additional fixtures 1 lot.
Stripping/ Termination of Termites/ Clean-up 1 lot.
Aluminum Fix Window with 6mm Glass 4.36 sq.m

Roofing Quantity Unit Unit Cost Total


Roof Gutter 4 pcs 600 2400
Flashing 3 pcs 600 1800
Consumbales 1 l.s 2000 2000
Labor 1 l.s 5000 5000

Ceiling
Metal Furring 50 pcs 93 4650
C-channel 32 pcs 110 3520
Labor 1 l.s 8000 8000
Consumbales 1 l.s 2000 2000

Painting Works
Skimcoat 25 bags 400 10000
Flat Latex 8 gals 600 4800
Topcoat 8 gals 600 4800
Consumbales 1 l.s 2000 2000
Labor 200 sq.m 138.8832 27,776.64

Wall Partitions
Metal Studs 45 pcs 190 8550
C-Channel 12 pcs 220 2640
Labor 16 sq.m 220 3520

Firewall
CHB 10 sq.m 20 200
Rebar 12mm 3 pcs 288 864
Labor 1 l.s 1500 1500

Cabinet 1 l.s 10000 10000


Lavatory 1 l.s 10000 10000
Windows 1 l.s 20000 20000

Stripping/Maintenance/warehousing 1 l.s 39800 39800


Electrical/Plumbing 1 l.s 15000 15000

190820.64
Project Renovation of Two Storey House
Location Brgy. II-F San Pablo City Laguna

Item Scope of Works Quantity Unit


I. Mobilization/Demobilization 1.00 lot
II. Roofing and Framing Works 40.00 sq.m
III. Ceiling Works 78.00 sq.m
IV. Painting Works 166.00 sq.m
V. Wall Partitions 61.00 sq.m
VI. FireWall extension 10.00 sq.m
VII. Aluminum Windows and Fixed Glass 1.00 lot
VIII. Aluminum Cabinets/Storage 1.00 lot
IX. Plumbing Works 1.00 lot
X. Electrical Works 1.00 lot
XI. Interior Maintenance/Stripping 1.00 lot
XII. Demolition of Existing Structure 1.00 lot
XIII.
XIV.
III.
I.
VII.

*All prices are not subject to tax and vat.


*This Qoutation is valid for 15 days only.
*This Qoutation is based only on the given measurement and scope of works of the owner,hence all changes is sub

Submitted By:
_____________________________________________
ENGR. JOHN ALBERT P. MERCADO
Subject
Date March 03, 2020

Amount
Unit Cost Total
Labor Materials Equipment
40,000.00 40,000.00
1,425.00 57,000.00
411.00 32,058.00
427.00 70,882.00
660.00 40,260.00
850.00 8,500.00
39,000.00 39,000.00
-
20,000.00 20,000.00
20,000.00 20,000.00
35,000.00 35,000.00
18,000.00 18,000.00
wala pa dito yung estimate ng dirty kitc

TOTAL 380,700.00

s of the owner,hence all changes is subjected to change order and variation.


pa dito yung estimate ng dirty kitchen
DETAILED BID BOQ
ITEM DESCRIPTION UNIT QTY UNIT COST AMOUNT
Mobilization/Demobilization Minidump Transfer trips 6.00 1,500.00 9,000.00
Labor Cost man-day 48.00 600.00 28,800.00
Roofing and Framing Works Angle Bar 65mmx65mmx6mm pcs 4.00 1,600.00 6,400.00
C-Purlins 100x65x20x2 pcs 10.00 500.00 5,000.00
Tilespan 7.5m x 1.2m x 0.6mm lm 45.00 655.00 29,475.00
Bended Accessories pcs 8.00 910.00 7,280.00
Tekscrew pcs 400.00 3.00 1,200.00
consumables lot 1.00 2,467.75 2,467.75
Labor Cost sqm 31.00 320.00 9,920.00
Ceiling Works Ficem Board 6mm pcs 23.00 400.00 9,200.00
Metal Furring pcs 50.00 115.00 5,750.00
Carrying Channel pcs 20.00 80.00 1,600.00
Threaded Rod with Nut & Washer pcs 20.00 65.00 1,300.00
Labor Cost sqm 64.00 220.00 14,080.00
Painting Works Skimcoat bags 25.00 420.00 10,500.00
Flat Latex gals 10.00 470.00 4,700.00
Top Coat gals 10.00 500.00 5,000.00
Labor Cost sqm 300.00 170.00 51,000.00
Wall Partitions Metal Studs pcs 40.00 220.00 8,800.00
Metal Tracks pcs 40.00 220.00 8,800.00
Fiber Cement Board 12mm pcs 12.00 920.00 11,040.00
consumables lot 1.00 880.00 880.00
Labor Cost sqm 33.00 200.00 6,600.00
FireWall extension Concreting works cu.m 1.00 5,000.00 5,000.00
Labor Cost cu.m 1.00 1,000.00 1,000.00
Aluminum Windows and Fixed Glass Subcon lot 1.00 39,000.00 39,000.00
Aluminum Kitchen Cabinet Subcon sqm 6.60 9,000.00 59,400.00
Plumbing Works lot 1.00 20,000.00 20,000.00
Electrical Works lot 1.00 20,000.00 20,000.00
Interior Maintenance/Stripping lot 1.00 35,000.00 35,000.00
Demolition of Existing Structure lot 1.00 18,000.00 18,000.00
Dirty Kitchen sqm 5.00 10,000.00 50,000.00
Stair Cabinet and Walk in Closet Subcon sqm 12.50 4,500.00 56,250.00
TOTAL 542,442.75
Project Renovation of Two Storey House Subject Qoutation
Location Brgy. II-F San Pablo City Laguna Date March 03, 2020

Amount
Item Scope of Works Quantity Unit Unit Cost Total
Labor Materials Equipment
I. Mobilization/Demobilization 1.00 lot 37,800.00 37,800.00
II. Roofing and Framing Works 32.00 sq.m 1,929.46 61,742.75
III. Ceiling Works 64.00 sq.m 498.91 31,930.00
IV. Painting Works 300.00 sq.m 237.33 71,200.00
V. Wall Partitions 33.00 sq.m 1,094.55 36,120.00
VI. FireWall extension 6.67 sq.m 899.55 6,000.00
VII. Aluminum Windows and Fixed Glass 1.00 lot 39,000.00 39,000.00
VIII. Aluminum Kitchen Cabinet 6.60 sq.m 9,000.00 59,400.00
IX. Plumbing Works 1.00 lot 20,000.00 20,000.00
X. Electrical Works 1.00 lot 20,000.00 20,000.00
XI. Interior Maintenance/Stripping 1.00 lot 35,000.00 35,000.00
XII. Demolition of Existing Structure 1.00 lot 18,000.00 18,000.00
XIII. Dirty Kitchen 5.00 sq.m 10,000.00 50,000.00
XIV. Stair Cabinet and Walk in Closet 12.50 sq.m 4,500.00 56,250.00
III. Discount 1.00 lot 2,442.75 (2,442.75)

TOTAL 540,000.00

Good day!
We are pleased to present you our formal quotation for the renovation of your two storey residential home.

*All prices are not subject to tax and vat.


*This Qoutation is valid for 15 days only.
*This Qoutation is based only on the given measurement and scope of works of the owner,hence all changes is subjected to change order and variation.

Submitted By:
_____________________________________________
ENGR. JOHN ALBERT P. MERCADO
herein attached the proposed design:
SUBCON OFFER
ITEM DESCRIPTION UNIT QTY
Mobilization/Demobilization Labor Cost lot 1.00
Roofing and Framing Works
Labor Cost sqm 31.00
Ceiling Works
Labor Cost sqm 64.00
Painting Works
Labor Cost sqm 300.00
Wall Partitions
Labor Cost sqm 33.00
FireWall extension
Labor Cost cu.m 1.00
Plumbing Works lot 1.00
Electrical Works lot 1.00
Interior Maintenance/Stripping lot 1.00
Demolition of Existing Structure lot 1.00
Dirty Kitchen lot 1.00
TOTAL
UNIT COST AMOUNT
5,000.00 5,000.00

320.00 9,920.00

200.00 12,800.00

170.00 51,000.00

200.00 6,600.00

1,000.00 1,000.00
7,500.00 7,500.00
7,500.00 7,500.00
7,500.00 7,500.00
10,000.00 10,000.00
12,500.00 12,500.00
TOTAL 131,320.00