Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

GANNON DUNKERLEY & CO. LTD.

Quality Management System


Construction of 2x660 MW Thermal Power Plant at
Jawaharpur-Uttar Pradesh,
Date- 05.06.2018 Rev-00

METHOD STATEMENT FOR ANTI-TERMITE

1-Objective- The purpose of this method statement is to give the step wise
methodology to carry out the anti termite works in planned and controlled manner with
reference to the technical specification and standards.

2-Scope- This specification covers the general requirement for pre constructional anti
termite treatment to the building to protect against attack by subterranean termite by
suitable chemical treatment measures.

3-RESPONSIBILITY

This is the responsibility of construction manager, Section in-charge, site engineer and
ultimate responsibility of Project in charge.

4-SPECIFICATION &STANDARDS

Contract Document, IS 6313 & Project Technical Specification.

5-RESOURCE REQUIRED

A- Equipment & Tools. Spray Machine, Bucket, Measuring Jar , General tools and
equipment with Safety PPE.

B- Man Power

Skilled Technician, Skilled Helper.

6-Procedure

SL Checked
Procedure Responsibility Records
NO By
A- Safety
GANNON DUNKERLEY & CO. LTD.
Quality Management System
Construction of 2x660 MW Thermal Power Plant at
Jawaharpur-Uttar Pradesh,
Date- 05.06.2018 Rev-00

MSDS (Material Safety Data Sheet)


shall be submitted for all chemical Site Engineer Safety
1
to be used to EHS department. Engineer

B Procedure
MATERIAL
The chemicals shall be used as insecticides for the treatment shall
Imidacloprid 30.50 % SC bearing ISI certification or approved equivalent
confirming to the requirement and concentration laid down in the latest
revision of IS 6313 Part II
Chemical Preparation

Dilute 1 part of Imidacloprid 30.50


Site Engineer Section In
1 % SC in the ratio of 1:474 for the charge
soil Treatment.

A Treatment of Backfilled Soil :


We shall treat the soil in immediate
contact with the RCC surface of
Plinth beams and columns , starting
at 500 mm from the ground level
Site Engineer Section In
1. till the ground level is reached. The charge
insecticide solution shall be applied
with the help of a spray pump @
7.50 ltrs per sq.m of the vertical
surface area.
Treatment of Top Surface of Plinth Filling
B

Once the soil has been filled up


the plinth level and compaction is
over , we shall grout holes at 150 Section In
1 Site Engineer
mm centre to centre and 50 mm – charge
75 mm deep in entire carpet area.
Insecticide solution shall then be
GANNON DUNKERLEY & CO. LTD.
Quality Management System
Construction of 2x660 MW Thermal Power Plant at
Jawaharpur-Uttar Pradesh,
Date- 05.06.2018 Rev-00

applied under pressure @ 5 ltrs


per sq.m of the horizontal surface
area. Please ensure that there is
no cutting or filling of soil after
the treatment.

C Treatment before plinth protection :

Once the soil, which the plinth


1
protection is to be laid, has been
compacted, we shall treat that soil Section In
with insecticide solution @ 5 Ltr Site Engineer charge
per sqm of the horizontal surface
area.

D Treatment of soil Along External Perimeter of Building

The trenches carrying the


sanitary and conduits lines shall
be treated up to a distance 2 m
1
from the point of contact with Site Engineer Section In
the building. charge

INSPECTION
C
Engineer shall carry out all field
QA/QC
1 inspection and ensure the Site Engineer
Engineer
dilution and rate of spray.

7- OUT PUT RECORD

a. MTC & Checklist


GANNON DUNKERLEY & CO. LTD.
Quality Management System
Construction of 2x660 MW Thermal Power Plant at
Jawaharpur-Uttar Pradesh,
Date- 05.06.2018 Rev-00