Effluent Drainage Design: Panasonic India New Factory Project

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

EFFLUENT DRAINAGE DESIGN

PANASONIC INDIA NEW FACTORY PROJECT.


AT JHAJJAR , HARYANA. Date: 10/2/2011

Manning 's Formula


n = 0.015 , 0.013
V=1/n ( R ) 2/3 ( S ) 1/2 .

Total Self Total Flow Total Flow G.L. at Invert Full Flow Invert
Flow Contribution from In Line In Line Line start Full Flow Level at G.L. at Level at Level at
Velocity Fall Depth at Depth at
S.No. Line No. (M3/Hr.) other Area/ Line (M3/Hr.) (M3/Sec) Length Pipe Size & Slope (m) Level at Start start (m) end (m) end (m) end (m)
(m/sec.) (m) Start (m) end (m)
(M3/Hr.) (M) (m)

Formula d= √(f.4) /
(0.8 x π )
From To c d= Total privous e=c+d f=e/3600 g h = design I =design j= k= l m n = as o (design) p=o- q=as in r = o-m s=r- t=p-n u=q-s
flow of line pipe size slope considered Cosidered =g/l in site (j/1000) site (j/1000)
(mm) (1 in ) Pipe Size Slope plan plan
(mm) (1 in)
1 A1 A3 0.48 0.00 0.48 0.000 102.0 59.789 1813 100 3600 0.09 0.028 0.00 -0.500 -0.600 0.00 -0.528 -0.628 0.60 0.628
2 A2 A3 3.24 0.00 3.24 0.001 81.0 56.941 31 100 65 0.71 1.246 0.00 -0.600 -0.700 0.00 -1.846 -1.946 0.70 1.946
3 A3 A5 0.00 3.72 3.72 0.001 78.0 60.792 33 150 110 0.71 0.709 0.00 -1.846 -1.996 0.00 -2.555 -2.705 2.00 2.705
4 A4 A5 4.80 0.00 4.80 0.001 46.0 69.307 40 100 65 0.71 0.708 0.00 -1.500 -1.600 0.00 -2.208 -2.308 1.60 2.308
5 A5 A6 0.00 8.52 8.52 0.002 66.0 92.002 57 150 110 0.71 0.600 0.00 -2.555 -2.705 0.00 -3.155 -3.305 2.71 3.305
6 A6 A7 0.00 8.52 8.52 0.002 58.0 92.002 57 150 110 0.71 0.527 0.00 -3.155 -3.305 0.00 -3.683 -3.833 3.31 3.833
7 A7 A8 0.00 8.52 8.52 0.002 22.0 92.002 57 150 110 0.71 0.200 0.00 -3.683 -3.833 0.00 -3.883 -4.033 3.83 4.033

*
453.0 Assuming Water Table at 5 meter From GL.

SMCC CONSTRUCTION INDIA LTD. Page 1