SCOPE :- This proposal envisages for replacement of 2 Nos Corroded RCC Poles
in Andiramapuram - V - D.T in AE / O&M / Konulampallam Section of
AEE / O&M / North / Sub-Division, Kumbakonam North Division.
ESTIMATE COST :- This Estimate works out to a cost of Rs. 10198 (G) &
Rs. 9758 (N).
CONCLUSION :- This Estimate has been prepared under improvement scheme to avoid
accidents and to maintain Un-interrupted supply to the consumers.
CREDIT ESTIMATE
Amount
Description Qty Rate Per
Sl.No Rs Pe
1 7.5 Mts RCC Pole 2 10 20 Kg 400
LABOUR STATEMENT
Sl Amount
Description QTY Per Rate
No Rs Pe
1 Surveying L.S 150
2 Tree Cutting L.S 198
3 Transport of Pole and other Line
Materials from Store to Site 2 E 123 246
4 Excavation of Pole Pit 2 E 71 142
5 Fixing of Insulators and Cross Arms 3 E 72 216
6 Erection of Pole 2 E 118 236
7 Erection of Stay set Complete 1 E 195 195
8 Paving and Stringing of Conductor 0
including Transport. Km 570 0
9 Resagging of Lines L.S 150
10 Earthing Loc 218 0
Gross Rs 10198
Less Credit 440
Net Rs 9758
PART - II Transfer to Provision for Depreciation of Old Asset
( Credit to A/C No : 12-6 )
SUMMARY OF ESTIMATE
LOC. NO
E2
E1
1
1
7.5 Mts RCC pole
L.T.3 Ф X Arm
L.T TI Fitting
Back Clamp
1
Stay set Complete
1
Guy Shackle
L.T. Shackle
L.T Pin
L.T. POLE SCHEDULE
Alu Knob
No: 8, G.I.Wire
Span Length
No. of Run
L.T.S Ф X Arm
L.T Pin
CREDIT