ANNEXURE – X

Report on failure of OCB / CT / PT

Report No. Date:

1. System 2. Division 3. Sub-station

4. Name plate details of failed OCB / CT / PT

L.PO. particulars.

Failed within / beyond guarantee period

5. Date and time of failure :

6. Associated trippings :

Time Relay indication


G.C.C.B.
L.V.C.B
Others

7. Indications on relays connected to OCB / CT / PT :

R phase O / L

B phase O / L

/conversion/tmp/scratch/478377252.doc
8. Measurements immediately after failure.

Sl.No. Details Failed OCB / CT / PT

1. Load in Amps

2. Bus voltage

3. Ambient temperature

4. Weather

9. Condition of

i) Battery ii) Relays iii) Trip circuit

10. Observation at the time of failure.

11. Operation carried out

(a) at the time of failure

(b) after the failure

/conversion/tmp/scratch/478377252.doc
12. TEST RESULTS:

CURRENT TRANSFORMER:
a) Meggering

Protection core Metering core Protection


Primary to core to
Primary to Secondary Primary to Secondary
earth metering
Secondary to Earth Secondary to Earth
core.

b) D.C. POLARITY CHECK

Secondary
Primary Deflection
Metering core Protection core

R phase

Y phase

B phase

c) RATIO CHECK

Current Standard Test C.T. Secondary current – Actual value


passed C.T. (Secondary) R phase Y phase B phase
in secondary theoretical Protec- Mete- Protec- Mete- Protec- Mete-
primary current current. tion ring tion ring tion ring
core core core core core core

POTENTIAL TRANSFORMER:

/conversion/tmp/scratch/478377252.doc
a) Meggering

Primary to earth Secondary to earth Primary to secondary

b) D.C. POLARITY CHECK:

Primary Secondary Deflection

R phase

Y phase

B phase

d) RATIO CHECK:

Voltage applied Secondary voltage Secondary voltage – Actual value


in primary. theoretical value R phase Y phase B phase

OCB:

/conversion/tmp/scratch/478377252.doc
a) Meggering
i) OCB in open position:

Y to Y Y to B B to R R to R Y to Y B to B

ii) OCB in closed position:


a) continuity:

R phase Y phase B phase

b) Opening time

c) Closing time

d) Trip coil current_ _ _ _ _ _ amps: Dip in voltage _ _ _ _ _ _ _ volts.


e) Closing coil current _ _ _ _ _amps: Dip in voltage _ _ _ _ _ _ _ volts.
f) Minimum voltage to trip
g) Trip through relay.
h) Checking of alarm.
i) Primary injection / Group test.

Current Readings in panel ammeter Relay current


passed R Y B L R Y B E/L

j) Relay pick up:

O/L . . . . .% (plug setting) _ _ _ _ _ _ amps.


E / L _ _ _ _ _% (Plug setting) _ _ _ _ _ _ _amps.
13. Whether the maintenance works were carried as per schedule.

/conversion/tmp/scratch/478377252.doc
14. Cause for failure.

15. Action proposed to replace the unit and to repair the same.

AEE/MRT AEE/SPL. EE/MRT EE/O&M

/conversion/tmp/scratch/478377252.doc
To
The Chief Engineer/Distribution/Chennai South Region/Chennai-2.
The Superintending Engineer/Planning-II/Chennai.
ANNEXURE – X

Report on failure of CT

Report No. Date:03.05.2006

1. System: C.E.D.C. 2.Division: EE/O&M/CGL 3.Sub Division: AEE/O&M/CGL

4. Name plate details of failed CT :Make:ELCONT Sl.NO:2291/54

Capacity :400/200/100/1 Amps

L.PO. particulars.

Failed within / beyond guarantee period :Beyond guarantee period

5. Date and time of failure : 30.04.06 at 14.05 Hrs

6. Associated trippings :

Time Relay indication


G.C.C.B. - -
L.V. O .C.B - -
SP.KOIL #VCB 14.05 E/L

7. Indications on relays connected to VCB / CT / PT :

R phase O / L -

B phase O / L -

/conversion/tmp/scratch/478377252.doc
8. Measurements immediately after failure.

Sl.No. Details Failed OCB / CT / PT

1. Load in Amps 70Amps

2. Bus voltage 10.8 KV

3. Ambient temperature 104 F

4. Weather NORMAL

9. Condition of

i) Battery:Normal ii) Relays :Normal ii) Trip circuit :Normal

10. Observation at the time of failure.

Heavy sound and oil spurt out observed

11 KV SP.KOIL Feeder tripped with E/L Relay indication

11. Operation carried out

(a) at the time of failure :


Incoming and Outgoing A.B. Switches of the 11KV SP.koil # VCB
was opened
(b) Informed to SE/CEDC/CGL,EE/O&M/CGL and MRT Division.

/conversion/tmp/scratch/478377252.doc
12. TEST RESULTS:

CURRENT TRANSFORMER:
a) Meggering

Protection core Metering core Protection


Primary to core to
Primary to Secondary Primary to Secondary
earth metering
Secondary to Earth Secondary to Earth
core.

e) D.C. POLARITY CHECK

Secondary
Primary Deflection
Metering core Protection core

R phase

Y phase

B phase

f) RATIO CHECK

Current Standard Test C.T. Secondary current – Actual value


passed C.T. (Secondary) R phase Y phase B phase
in secondary theoretical Protec- Mete- Protec- Mete- Protec- Mete-
primary current current. tion ring tion ring tion ring
core core core core core core

POTENTIAL TRANSFORMER:

/conversion/tmp/scratch/478377252.doc
a) Meggering

Primary to earth Secondary to earth Primary to secondary

b) D.C. POLARITY CHECK:

Primary Secondary Deflection

R phase

Y phase

B phase

g) RATIO CHECK:

Voltage applied Secondary voltage Secondary voltage – Actual value


in primary. theoretical value R phase Y phase B phase

OCB:

b) Meggering
iii) OCB in open position:

Y to Y Y to B B to R R to R Y to Y B to B

/conversion/tmp/scratch/478377252.doc
iv) OCB in closed position:
v)
a) continuity:

R phase Y phase B phase

b) Opening time

c) Closing time

d) Trip coil current_ _ _ _ _ _ amps: Dip in voltage _ _ _ _ _ _ _ volts.


e) Closing coil current _ _ _ _ _amps: Dip in voltage _ _ _ _ _ _ _ volts.
f) Minimum voltage to trip
j) Trip through relay.
k) Checking of alarm.
l) Primary injection / Group test.

Current Readings in panel ammeter Relay current


passed R Y B L R Y B E/L

j) Relay pick up:

O/L . . . . .% (plug setting) _ _ _ _ _ _ amps.


E / L _ _ _ _ _% (Plug setting) _ _ _ _ _ _ _amps.
13. Whether the maintenance works were carried as per schedule.: YES

/conversion/tmp/scratch/478377252.doc
14. Cause for failure.

15. Action proposed to replace the unit and to repair the same.

AEE/MRT AEE/SPL. EE/MRT EE/O&M

Remarks of S.E.

SUPERINTENDING ENGINEER,
CEDC/CHENGALPATTU.

To
The Chief Engineer/Distribution/Chennai South Region/Chennai-2.
The Superintending Engineer/Planning-II/Chennai.