Professional Documents
Culture Documents
Details of Wall Footing 1 (Wf-1) Detail of Foot TIE BEAM-2 (FB-2)
Details of Wall Footing 1 (Wf-1) Detail of Foot TIE BEAM-2 (FB-2)
627
7850
235
4850 O.C.
1125
1125
WF-1 WF-1
FTB2 FTB2 GROUND FLOOR LINE
C C
3753
SEE DETAIL ON SLAB ON FILL
VARIES
O.C. AS SHOWN
VARIES
O.C.
C-1 C-1
940 min.
C-1 4-50mm, 4-100mm, 4-150mm rext @ 200mm O.C.
BAR
313
100mm THK. WELL
TAMPERED GRAVEL,
CONTINUES BAR
157
(TYPICAL)
10mm dia. BARS @ 400mm O.C.
WF-1
MIDSPAN SUPPORT
WF-1
3860
3862
3860
BOTH WAYS FOR 100mm THK.
FTB2
FTB1
FTB2
WF-1
627
WF-1 FTB-2
B
UP
3 FOOTING 1 (WF-1)
9865
9865
FTB2
FTB2
S-5
S-5 SCALE 1:10 MTS
WF-1
WF-1
3540
3538
WF-1
SOF SOF
SCALE 1:100 MTS
A A
COMPACTED
WIRE MESH O.C. B.W. 900 900
GRAVEL BEDDING
F-1
WF-1
F-2 F-1
FTB2 FTB2
C-1 C-2 C-1
BAR CUT-OFF BOTTOM BARS
BAR CUT-OFF TOP BARS
1125
1125
2465
2015
4850 3000
4-50mm, 4-100mm, 4-150mm rext @ 200mm O.C.
SLAB ON FILL
2700 2150 3000
7850
MIDSPAN SUPPORT
7850
DETAIL OF SLAB FTB-1