TABLE OF CONTENTS
DIVISION 2 SITEWORKS/EARTHWORKS
DIVISION 8 FENESTRATIONS
DIVISION 9 FINISHES
DIVISION 1.0
GENERAL REQUIREMENTS
1. SCOPE OF WORK
The work consist of furnishing all materials, equipment, supplies, labor,
supervision and transportation necessary to construct the New
Construction of Four(4)-Storey Bldg.,in strict accordance with the contract
drawings and described by or referred in these specification in every
respect to the reasonable satisfaction of the City Engineer and the
Owner/Procuring Entity.
1. SITE WORKS/EARTHWORKS
- Site preparation/layout
- Excavation
- Fill and backfill
- Soil poisoning
3. METALS/STRUCTURAL WORKS
- Handrails, mouldings
7. FENESTRATIONS
8. FINISHES
- Floor finishes
- Interior and Exterior finishes
- Ceiling Finishes
- Painting works
9. SANITARY/PLUMBING WORKS
- Roughing-in
- Sanitary and Storm drainage system
- Fixtures supply and installation
- Water distribution
- Roughing-in
- Power & Lighting system
- Fixture supply and installation
2. WORKMANSHIP
All works shall be done by skilled and competent men who regularly engage or
specialize in the type of works specified.
3. EXAMINATION OF SITE
3.1 Examine site premises and all conditions therein. Consider all such conditions
that may affect work.
3.2 Measure any existing work/structures at site. Verify all given dimensions.
4.1 Provide adequate and competent watchmen to guard the site premises from
commencement of operations until the project is fully completed.
4.2 Provide adequate protection for the following existing elements.
4.3 Protect adjoining structures and properties.
6. SUBMITTALS
6.1 The Contractor shall submit the following documents to the City Engineer and
Owner.
a. List of estimated quantities & corresponding values
b. Schedule of construction work
c. Shop drawings for details and corrections not shown on the drawings but
required for the works.
d. Sample of finishes and contractor furnished materials.
7. TESTS
8. MATERIALS
All materials to be used and equipments be installed shall be brand new and of the
approved type of their location and purpose.
9.1 The Contractor is required to submit to the City Engineer or his duly
authorized representative the following prior to the final acceptance of the
work:
a. As-built drawings.
b. Guarantees and bonds for all materials and equipment
9.2 Clean the premises and remove all stains, blemishes, dirt and oil from all
finished works.
DIVISION 2.0
SITE WORKS/EARTH WORKS
1. CLEARING
1.1 GENERAL
The work shall include the removal of all superficial obstruction on the site
within the boundaries as shown in the drawings.
1.2 MATERIALS
All materials and equipment required execute specified works on this section
as approved by the City Engineer or duly authorized representative.
1.3 EXECUTION
2.1 GENERAL
The contractor is required to perform all excavations, regardless of the
character of materials within the limits of the work, correct to the specified
lines and grade.
2.2 MATERIALS
a. Topsoil – separate and deposit in piles all excavated materials suitable for
topsoil uniformly over finished surface grade.
b. Common Fill - site excavated material free from roots, stumps and other
perishable or objectionable matter.
c. Select Fill – crushed gravel, crushed rock or combination thereof.
d. Placing Fill – before placing fill materials, the surface upon which it will be
place shall be cleared of all bushes, scrubs and roots and thoroughly wetted
to insure good bonding between the ground and the fill materials.
e. Compaction – fills shall be fully spread in horizontal layers of not more than
150 mm in thickness. Each layer shall be wetted and compacted by approved
mechanical compaction machine, roller or portable, to a density of at least
95% of its maximum density for non cohesive soils as determined by AST
Method D-1557 or AASHTO Method T-120.
3. SOIL POISONING
3.1 GENERAL
Immediately after back filling, soil poisoning shall be applied as herein
specified.
3.2 MATERIALS
Use approved soil poison as recommended by the Architect.
3.3 EXECUTION
Soil poisoning treatment shall be applied in accordance with the precautions
and instructions on the label or as directed by the Architect or Engineer.
4. PILE DRIVING
Any excess materials resulting from the finish graping operations, not required or
unsuitable for fill or back fill shall be disposed of by the Contractor at his
expense.
DIVISION 3.0
CONCRETE AND MASONRY WORKS
1. CONCRETING
1.1 GENERAL
1.2 PRODUCTS
1.2.1 MATERIALS
a. Portland cement conforming to ASTRA C-150 “Standard Specifications for
Portland Cement”.
b. COARSE AGGREGATES
Well graded, clean, hard particles of crushed or rock not larger than ¾ of
minimum clear spacing between reinforcing bars, bundle bars, and in no
case larger than 33 mm in diameter.
c. FINE AGGREGATE
Clear washed natural sand.
d. WATER
Clean and free from oil, alkali, organic materials or other substances
deleterious to concrete or steel.
e. STEEL REINFORCEMENT
Structural grade deformed bars - sizes as indicated on the drawings.
a. PROPORTIONS
Shall be in general following the ACI Standard Recommendation for
Selection of Proportions. For concrete (ACI 613), the mixture shall have the
adequate workability and proper consistency to permit concrete to be
worked properly into the forms and around reinforcement.
1.3 EXECUTION
1.3.3 Floor system shall be convention slab & beams with removable steel form.
After removal of steel from finishing and retouching of concrete slab shall be
undertaken.
1.3.4 CURING
a. Keep concrete continuously wet for at least 7 days after placing.
b. Begin curing as soon as concrete has attained initial set.
c. Spray horizontal and vertical surfaces with an approved curing
composed.
1.4 INSPECTIONS
Proportions, mix, and place concrete only in the presence of the engineer.
Notify the engineer in advance to provide ample time for inspection of
reinforcing steel bars before any mixing and placing of concrete is commenced.
2.0 MASONRY
2.1 GENERAL
Scope: furnishing of all masonry works, complete as shown and specified
in the drawings.
2.2 PRODUCTS
a. Masonry Units 100mm x 200mm x 400mm and 150mm x 200mm x 400mm
steam cured 700 psi minimum.
b. Mortar: One part Portland Cement to 3 part sand.
c. Reinforcement: Intermediate grade bars conforming to ASTM specification
A15 and of size shown in plans.
d. Wire Ties: 16 Ga. GI wire
2.3 EXECUTIONS
Lay all masonry units, plumb, true to line, and with accurately spaced course,
build solidly each course in Portland Cement mortar. Wedge units terminating
against beam suffets tightly with mortar and reinforcement properly secured to
dowels.
DIVISION 5
WOOD AND CARPENTRY
1. GENERAL
1.1 Scope of work – Furnish all materials necessary to complete wood and
carpentry requirements, as indicated in the drawings and or specifications
herein (Please see detailed plans)
1.2 Material Handling – All materials shall be delivered and handled as to protect
them from damage and deformation, they shall be stored in carpentry work
area.
1.3 All wood materials shall be of good quality and free from any or all kinds of
defects.
2. MATERIALS
2.1 Use 3” x 4” Narra wood for all handrail requirements, see detailed stair plan.
2.2 Use lumber kiln dried, selected with same shade, color, and grain
configuration for Edgings and Mouldings, and shall be with 15% maximum
moisture content only at the time of dressing.
2.3 Adhesive – Use water resistant glue for all lamination and joints.
2.4 Use of 2” x 3” lumber kiln dried for ceiling joists & hangers.
3. EXECUTIONS
3.1 All woodworks shall be true to details, clean in profile and sharply defined.
3.2 Finished woodworks shall be dressed and sanded with joints tight and so
formed to conceal shrinkage.
DIVISION 6
GLASS AND GLAZING
1. GENERAL
2. PRODUCT
a. Use 6mm thk. Clear glass by “Chain glass” or approved equal for all steel
casement windows.
3. INSTALLATION
3.1 All installation shall be referred to the manufacturer’s recommendation and
instructions.
3.2 Provide allowance for thermal expansion.
3.3 Set glass accurate fit using spacer blocks and resilient sealant.
3.4 Remove glazing compound from glaze and clean both sides after glazing has
been placed.
DIVISION 7
ROOFING WORKS AND MOISTURE PROTECTION
1.1 GENERAL
The works include furnishing of all materials, labor, tool plant facilities and
performing labor to install sheet metal roofing and accessories as shown on the
drawings and specified herein complete.
1.2 SUBMITTALS
a. Submit color sample chip for architect’s approval
b. Warranty
c. Submit shop drawings
1.3 PRODUCT STORAGE AND HANDLING
Follow strictly manufacturer’s instructions and recommended safety tools and
accessories.
1.4 PRODUCT
1.4.1 Pre-formed, Pre-painted single length span cold rolled metal roof sheets –
0.6 mm thk. (GA 24)
1.4.2 Pre-formed, Pre-painted cold rolled metal sheets, 0.8 mm thk. for ridge
rolls, gutters, flushing and counter flushings, same color as roofing sheets.
1.4.3 Easteners – Self drilling metal screws w/neoprene washers, size as
recommended.
1.5 EXECUTION
Install roofing sheets and accessories strictly as per standard sheet laying
procedure by the manufacturer.
4. WATERPROOFING/MOISTURE PROTECTION
4.1 GENERAL
4.2 MATERIALS
4.2.1 For toilet walls/suspended toilet slabs, use GER-Eurobit 810 Liquid
applied, elastomeric waterproofing membrane or it’s approved equal.
4.2.2 For slabs on fill/. Use GER Eurobit 810 or approved equal.
4.3 EXECUTION
DIVISION 8
FENESTRATIONS
1. DOORS
1.1 GENERAL
1.1.1 Furnish all the materials, labor and tools necessary to install steel
doors/frames as specified and shown in the drawings.
1.1.2 Submittals
a. Submit shop drawings and secure Architect’s approval
b. Submit actual sample of door jamb for Architect’s approval
1.2 PRODUCT
1.2.1 Doors complete with jambs and design as indicated in the plans
@ Class rooms - 0.9 x 2.1, Hollow-flush type doors
@ Toilets - 0.8 x 2.1, Panel doors
1.2.2 Flush hollow core wooden door – ¼” thk. marine plywood
1.3 EXECUTION
1.3.2 Installation
2. DOOR HARDWARE
2.1 GENERAL
2.1.1 Scope
The work shall include furnishing of all door hardware requirements.
Complete as functionally indicated on the drawings and specified
herein.
2.1.2 Submittals
Submit door hardware and key schedule.
2.2 PRODUCT
2.3 INSTALLATION
3. WINDOWS
3.1 GENERAL
Furnish all the materials, labor and tools necessary to install window
requirements.
3.2 PRODUCT
3.2.1 Use Aluminum type fixed louver windows at the hallway side of all
classrooms specified in the detailed window plan.
3.2.2 Jalousie-type windows at the classroom areas fronting the corridors.
3.2.3 Use aluminum type fixed glass window at the hallway side of all
laboratories.
DIVISION 9
FINISHES
1. Plain Cement finish for all the areas except the toilet’s areas.
1.1 GENERAL
1.1.1 Scope – Furnish all materials, labor, tools necessary to install Vinyl tiles
as specified in the drawings and by the Architect.
1.2 EXECUTION
2. CERAMIC TILES
2.1 GENERAL
2.1.1 Scope – Furnish all materials, tools and labor necessary to install all
ceramic tile requirements as specified and as shown on the drawings.
2.1.2 Submit samples for Architect’s approval.
2.2 PRODUCT
2.2.1 @ Toilet walls, use 200 x 200 x 6mm Glazed ceramic tiles by
“Mariwasa” or approved equal. Color is WHITE.
2.2.2 @ Toilet floors, use 200 x 200 x06mm Unglazed ceramic tiles by
“Mariwasa” or approved equal. Color is WHITE.
2.2.3 Setting Materials
a. Floor – Portland cement mortar, 1:6 proportion
b. Wall – Ceramic tile adhesive by “3M” or equal
2.2.4 Grouting - Colored tile grout by ABC, color as selected by the Architect.
2.3 EXECUTION
3.1 GENERAL
3.1.1 Scope – Finish all materials, labor, and tools necessary to complete all
skimcoating and plastering works required as indicated on drawing
complete.
3.1.2 Submit field sample of test panel for Architect’s approval before execution
of work.
3.2 MATERIALS
3.3 EXECUTION
3.3.1 Preparation
a. Surfaces to receive plaster shall be cleaned and wetted thoroughly
b. Previously plastered surfaces to receive corrective plaster coats of
more than 25mm thk. shall be reinforced with metal lath laid firm and
true to plumb and alignment required prior to application of additional
coats.
3.3.2
3.4 WORKMANSHIP
4. PAINTING
4.1 GENERAL
4.1.1 Scope – Painting contractor shall furnish all materials, tools, equipment,
staging, and labor necessary to perform all painting and finishing work in
connection with the following: all exposed exterior and interior pre-cast walls,
steel windows, metal and wood doors, wood partitions, all metal works,
railings brackets, pipe railing, concrete hollowblock walls, plywood wall,
closets and shelf, and all necessary areas to completely paint the entire
structure.
4.1.2 All types of paints and color to be used shall be subject to the approval of the
Architect and/or the Owner. Samples shall be submitted to the Architect for
approval.
4.2 PRODUCT
4.2.1 all paint and paint materials called for under these specifications shall be
“BOYSEN”, “SINCLAIR” brand or approved equal.
EXTERIOR WALLS
Use Boysen Acrytex Semi-gloss for top coat and Boysen Acrytex primer for
1st coat or approved equal
Painting Schedule – Plain finish, 1st coat Boysen Acrytex Primer, 2nd and 3rd
coat Boysen Acrytex Topcoat (Semi-gloss)
INTERIOR WALLS
Painting Schedule – Use Permacoat Latex for 1st coat, and Permacoat semi-
gloss latex for 2nd and 3rd coat
CEILING FINISHES
Painting schedule – for 1st coat use Boysen Permacoat Latex # 201, and for 2nd
and 3rd coat use Boysen Permacoat Latex - flat
Application and Spreading rate – by brush, roller or airless spray, 25-30 sqm.
per 4 liter can.
METAL SURFACES
Painting schedule – for 1st coat use epoxy primer and for 2nd and 3rd coat use
Boysen epoxy enamel
Application and Spreading rate – by brush or spray, 20-30 sqm. per 4 liter per
coat
4.2.2 All materials for painting shall be delivered at the construction site in
unbroken package, bearing the manufacturer’s brand and name.
4.3 EXECUTION
4.3.1 Before any painting is done all surfaces to be painted shall be clean, smooth
and free from dust, dirt, grease, mortar, rust and other foreign substances. No
coat of paint shall be applied on wet or damp surface and in no case until
preceding coat is dry and hard.
4.3.2 Treat all new masonry with Masonry neutralizer – Boysen Masonry
Neutralizer #44 or approved equal. Leave overnight before rinsing with water
and allow to dry. Refer to manufacturer’s instructions.
4.3.3 Follow strictly all painting schedule, application and spreading rate
instructions, and observe adequate drying time. Refer to manufacturer’s guide.
4.3.4 Cleaning – upon completion of the building, the painting contractor shall
remove all paint spots from all finished work, and leave the entire premises
free from rubbish caused by the work. The works shall be presented clean and
free from blemish. Washing and cleaning of all glazing is incorporated in this
article.
DIVISION 10
SANITARYJ AND PLUMBING WORKS
1. GENERAL
1.1 Furnish drainage, waste and ventilation system, cold water line in accordance with the
plans and specifications – complete.
1.2 Submittals – Submit samples and secure Engineer’s approval.
1.3 All plumbing works included herein shall be executed according to the provisions of
the National Plumbing Code of the Philippines and the National Building Code.
1.4 Coordinate the drawings with other related drawings and specifications.
1.5 All works shall be done under the direct supervision of a licensed plumber and in
strict accordance with these specifications and of the methods as prescribed by the
National plumbing code of the Philippines.
1.6 Any changes of the work shall be prior to the approval of the Architect and the
Engineer.
1.7 The contractor shall be responsible for all the required floor and wall openings
needed for the completion of the work.
1.8 The contractor shall conduct all test required in plumbing works, and shall furnish all
the equipment, appliance, labor, and materials including water necessary for the
satisfactory testing of plumbing works at his own expense.
1.9 The drawings shows the general arrangement of all piping, however where actual
conditions necessities a rearrangements. Because of the small scale of the drawings, it
is not possible to indicate all offsets, fittings and accessories which maybe affecting
all his work and shall arrange each works accordingly, furnishing such fittings, traps,
valves and accessories as maybe required to meet each conditions.
2. PRODUCTS
2.1 For soil, waste pipe and downspout, use Standard size PVC pipes with size as
required and indicated on the plan or as directed by the Architect or Engineer.
Use “NELTEX” PVC pipes or approved equal.
2.2 For drainage and waste pipe venting use “Studor” Air admittance valve or it’s
approved equal. See detailed sanitary plan. (Please refer to Manufacturer’s
manual for installation).
2.3 For cold water line, use POLYPROPYLENE Pipes, Polymutan PN 80 Fusion
pipes made in Germany or its approved equal.
3. EXECUTION
PLUMBING FIXTURES
1. GENERAL
Furnish all required plumbing fixtures and accessories as indicated in the
drawings – complete.
2. PRODUCT
2.4 ACCESSORIES
2.5 FAUCETS
Note: The Technical Specifications stated herein is not yet final and still subject to
revisions. Structural Works and Electrical Works technical specifications are yet to be
incorporated in the overall technical specifications pending the completion of Structural
plans and the Electrical plans.
OWNER:
TABLE OF CONTENTS
DIVISION 8 FENESTRATIONS
DIVISION 9 FINISHES
DIVISION 1.0
GENERAL REQUIREMENTS
- Site preparation/layout
- Excavation
- Fill and backfill
- Soil poisoning
- Handrails, mouldings
17. FENESTRATIONS
18. FINISHES
- Floor finishes
- Interior and Exterior finishes
- Ceiling Finishes
- Painting works
- Roughing-in
- Power & Lighting system
- Fixture supply and installation
11. WORKMANSHIP
All works shall be done by skilled and competent men who regularly engage or
specialize in the type of works specified.
3.1 Examine site premises and all conditions therein. Consider all such conditions
that may affect work.
3.2 Measure any existing work/structures at site. Verify all given dimensions.
4.1 Provide adequate and competent watchmen to guard the site premises from
commencement of operations until the project is fully completed.
4.2 Provide adequate protection for the following existing elements.
4.3 Protect adjoining structures and properties.
15. SUBMITTALS
6.1 The Contractor shall submit the following documents to the City Engineer and
Owner.
a. List of estimated quantities & corresponding values
b. Schedule of construction work
c. Shop drawings for details and corrections not shown on the drawings but
required for the works.
d. Sample of finishes and contractor furnished materials.
16. TESTS
17. MATERIALS
All materials to be used and equipments be installed shall be brand new and of the
approved type of their location and purpose.
9.1 The Contractor is required to submit to the City Engineer or his duly
authorized representative the following prior to the final acceptance of the
work:
a. As-built drawings.
b. Guarantees and bonds for all materials and equipment
9.2 Clean the premises and remove all stains, blemishes, dirt and oil from all
finished works.
DIVISION 2.0
SITE WORKS/EARTH WORKS
6. CLEARING
6.1 GENERAL
The work shall include the removal of all superficial obstruction on the site
within the boundaries as shown in the drawings.
6.2 MATERIALS
All materials and equipment required execute specified works on this section
as approved by the City Engineer or duly authorized representative.
6.3 EXECUTION
7.1 GENERAL
The contractor is required to perform all excavations, regardless of the
character of materials within the limits of the work, correct to the specified
lines and grade.
7.2 MATERIALS
a. Topsoil – separate and deposit in piles all excavated materials suitable for
topsoil uniformly over finished surface grade.
b. Common Fill - site excavated material free from roots, stumps and other
perishable or objectionable matter.
c. Select Fill – crushed gravel, crushed rock or combination thereof.
d. Placing Fill – before placing fill materials, the surface upon which it will be
place shall be cleared of all bushes, scrubs and roots and thoroughly wetted
to insure good bonding between the ground and the fill materials.
e. Compaction – fills shall be fully spread in horizontal layers of not more than
150 mm in thickness. Each layer shall be wetted and compacted by approved
mechanical compaction machine, roller or portable, to a density of at least
95% of its maximum density for non cohesive soils as determined by AST
Method D-1557 or AASHTO Method T-120.
8. SOIL POISONING
8.1 GENERAL
Immediately after back filling, soil poisoning shall be applied as herein
specified.
8.2 MATERIALS
Use approved soil poison as recommended by the Architect.
8.3 EXECUTION
Soil poisoning treatment shall be applied in accordance with the precautions
and instructions on the label or as directed by the Architect or Engineer.
9. PILE DRIVING
Any excess materials resulting from the finish graping operations, not required or
unsuitable for fill or back fill shall be disposed of by the Contractor at his
expense.
DIVISION 3.0
CONCRETE AND MASONRY WORKS
5. CONCRETING
5.1 GENERAL
5.2 PRODUCTS
5.2.1 MATERIALS
a. Portland cement conforming to ASTRA C-150 “Standard Specifications for
Portland Cement”.
b. COARSE AGGREGATES
Well graded, clean, hard particles of crushed or rock not larger than ¾ of
minimum clear spacing between reinforcing bars, bundle bars, and in no
case larger than 33 mm in diameter.
c. FINE AGGREGATE
Clear washed natural sand.
d. WATER
Clean and free from oil, alkali, organic materials or other substances
deleterious to concrete or steel.
e. STEEL REINFORCEMENT
Structural grade deformed bars - sizes as indicated on the drawings.
5.3 EXECUTION
1.3.3 Floor system shall be convention slab & beams with removable steel form.
After removal of steel from finishing and retouching of concrete slab shall be
undertaken.
1.3.4 CURING
a. Keep concrete continuously wet for at least 7 days after placing.
b. Begin curing as soon as concrete has attained initial set.
c. Spray horizontal and vertical surfaces with an approved curing
composed.
1.4 INSPECTIONS
Proportions, mix, and place concrete only in the presence of the engineer.
Notify the engineer in advance to provide ample time for inspection of
reinforcing steel bars before any mixing and placing of concrete is commenced.
2.0 MASONRY
2.1 GENERAL
Scope: furnishing of all masonry works, complete as shown and specified
in the drawings.
2.2 PRODUCTS
a. Masonry Units 100mm x 200mm x 400mm and 150mm x 200mm x 400mm
steam cured 700 psi minimum.
b. Mortar: One part Portland Cement to 3 part sand.
c. Reinforcement: Intermediate grade bars conforming to ASTM specification
A15 and of size shown in plans.
d. Wire Ties: 16 Ga. GI wire
2.3 EXECUTIONS
Lay all masonry units, plumb, true to line, and with accurately spaced course,
build solidly each course in Portland Cement mortar. Wedge units terminating
against beam suffets tightly with mortar and reinforcement properly secured to
dowels.
DIVISION 5
WOOD AND CARPENTRY
4. GENERAL
1.1 Scope of work – Furnish all materials necessary to complete wood and
carpentry requirements, as indicated in the drawings and or specifications
herein (Please see detailed plans)
1.2 Material Handling – All materials shall be delivered and handled as to protect
them from damage and deformation, they shall be stored in carpentry work
area.
4.3 All wood materials shall be of good quality and free from any or all kinds of
defects.
5. MATERIALS
2.1 Use 3” x 4” Narra wood for all handrail requirements, see detailed stair plan.
2.2 Use lumber kiln dried, selected with same shade, color, and grain
configuration for Edgings and Mouldings, and shall be with 15% maximum
moisture content only at the time of dressing.
2.3 Adhesive – Use water resistant glue for all lamination and joints.
2.4 Use of 2” x 3” lumber kiln dried for ceiling joists & hangers.
6. EXECUTIONS
3.1 All woodworks shall be true to details, clean in profile and sharply defined.
3.2 Finished woodworks shall be dressed and sanded with joints tight and so
formed to conceal shrinkage.
DIVISION 6
GLASS AND GLAZING
5. GENERAL
6. PRODUCT
a. Use 6mm thk. Clear glass by “Chain glass” or approved equal for all steel
casement windows.
7. INSTALLATION
3.1 All installation shall be referred to the manufacturer’s recommendation and
instructions.
3.2 Provide allowance for thermal expansion.
3.3 Set glass accurate fit using spacer blocks and resilient sealant.
3.4 Remove glazing compound from glaze and clean both sides after glazing has
been placed.
DIVISION 7
ROOFING WORKS AND MOISTURE PROTECTION
2.1 GENERAL
The works include furnishing of all materials, labor, tool plant facilities and
performing labor to install sheet metal roofing and accessories as shown on the
drawings and specified herein complete.
2.2 SUBMITTALS
a. Submit color sample chip for architect’s approval
b. Warranty
c. Submit shop drawings
2.3 PRODUCT STORAGE AND HANDLING
Follow strictly manufacturer’s instructions and recommended safety tools and
accessories.
2.4 PRODUCT
2.4.1 Pre-formed, Pre-painted single length span cold rolled metal roof sheets –
0.6 mm thk. (GA 24)
2.4.2 Pre-formed, Pre-painted cold rolled metal sheets, 0.8 mm thk. for ridge
rolls, gutters, flushing and counter flushings, same color as roofing sheets.
1.4.3 Easteners – Self drilling metal screws w/neoprene washers, size as
recommended.
2.5 EXECUTION
Install roofing sheets and accessories strictly as per standard sheet laying
procedure by the manufacturer.
8. WATERPROOFING/MOISTURE PROTECTION
8.1 GENERAL
8.2 MATERIALS
8.2.1 For toilet walls/suspended toilet slabs, use GER-Eurobit 810 Liquid
applied, elastomeric waterproofing membrane or it’s approved equal.
8.2.2 For slabs on fill/. Use GER Eurobit 810 or approved equal.
8.3 EXECUTION
DIVISION 8
FENESTRATIONS
4. DOORS
4.1 GENERAL
4.1.1 Furnish all the materials, labor and tools necessary to install steel
doors/frames as specified and shown in the drawings.
4.1.2 Submittals
a. Submit shop drawings and secure Architect’s approval
b. Submit actual sample of door jamb for Architect’s approval
4.2 PRODUCT
1.2.1 Doors complete with jambs and design as indicated in the plans
@ Class rooms - 0.9 x 2.1, Hollow-flush type doors
@ Toilets - 0.8 x 2.1, Panel doors
1.2.2 Flush hollow core wooden door – ¼” thk. marine plywood
4.3 EXECUTION
4.3.2 Installation
5. DOOR HARDWARE
5.1 GENERAL
5.1.1 Scope
The work shall include furnishing of all door hardware requirements.
Complete as functionally indicated on the drawings and specified
herein.
5.1.2 Submittals
Submit door hardware and key schedule.
5.2 PRODUCT
5.3 INSTALLATION
6. WINDOWS
6.1 GENERAL
Furnish all the materials, labor and tools necessary to install window
requirements.
6.2 PRODUCT
6.2.1 Use Aluminum type fixed louver windows at the hallway side of all
classrooms specified in the detailed window plan.
6.2.2 Jalousie-type windows at the classroom areas fronting the corridors.
6.2.3 Use aluminum type fixed glass window at the hallway side of all
laboratories.
DIVISION 9
FINISHES
4. Plain Cement finish for all the areas except the toilet’s areas.
4.1 GENERAL
1.1.1 Scope – Furnish all materials, labor, tools necessary to install Vinyl tiles
as specified in the drawings and by the Architect.
4.2 EXECUTION
6. CERAMIC TILES
6.1 GENERAL
2.1.1 Scope – Furnish all materials, tools and labor necessary to install all
ceramic tile requirements as specified and as shown on the drawings.
2.1.2 Submit samples for Architect’s approval.
6.2 PRODUCT
2.2.1 @ Toilet walls, use 200 x 200 x 6mm Glazed ceramic tiles by
“Mariwasa” or approved equal. Color is WHITE.
2.2.2 @ Toilet floors, use 200 x 200 x06mm Unglazed ceramic tiles by
“Mariwasa” or approved equal. Color is WHITE.
2.2.3 Setting Materials
a. Floor – Portland cement mortar, 1:6 proportion
b. Wall – Ceramic tile adhesive by “3M” or equal
2.2.4 Grouting - Colored tile grout by ABC, color as selected by the Architect.
6.3 EXECUTION
7. PLASTERING
7.1 GENERAL
3.1.1 Scope – Finish all materials, labor, and tools necessary to complete all
skimcoating and plastering works required as indicated on drawing
complete.
3.1.2 Submit field sample of test panel for Architect’s approval before execution
of work.
7.2 MATERIALS
7.3 EXECUTION
7.3.1 Preparation
a. Surfaces to receive plaster shall be cleaned and wetted thoroughly
b. Previously plastered surfaces to receive corrective plaster coats of
more than 25mm thk. shall be reinforced with metal lath laid firm and
true to plumb and alignment required prior to application of additional
coats.
3.3.2
7.4 WORKMANSHIP
8. PAINTING
8.1 GENERAL
8.1.1 Scope – Painting contractor shall furnish all materials, tools, equipment,
staging, and labor necessary to perform all painting and finishing work in
connection with the following: all exposed exterior and interior pre-cast walls,
steel windows, metal and wood doors, wood partitions, all metal works,
railings brackets, pipe railing, concrete hollowblock walls, plywood wall,
closets and shelf, and all necessary areas to completely paint the entire
structure.
8.1.2 All types of paints and color to be used shall be subject to the approval of the
Architect and/or the Owner. Samples shall be submitted to the Architect for
approval.
8.2 PRODUCT
8.2.1 all paint and paint materials called for under these specifications shall be
“BOYSEN”, “SINCLAIR” brand or approved equal.
EXTERIOR WALLS
Use Boysen Acrytex Semi-gloss for top coat and Boysen Acrytex primer for
1st coat or approved equal
Painting Schedule – Plain finish, 1st coat Boysen Acrytex Primer, 2nd and 3rd
coat Boysen Acrytex Topcoat (Semi-gloss)
INTERIOR WALLS
Painting Schedule – Use Permacoat Latex for 1st coat, and Permacoat semi-
gloss latex for 2nd and 3rd coat
CEILING FINISHES
Painting schedule – for 1st coat use Boysen Permacoat Latex # 201, and for 2nd
and 3rd coat use Boysen Permacoat Latex - flat
Application and Spreading rate – by brush, roller or airless spray, 25-30 sqm.
per 4 liter can.
METAL SURFACES
Painting schedule – for 1st coat use epoxy primer and for 2nd and 3rd coat use
Boysen epoxy enamel
Application and Spreading rate – by brush or spray, 20-30 sqm. per 4 liter per
coat
8.2.2 All materials for painting shall be delivered at the construction site in
unbroken package, bearing the manufacturer’s brand and name.
8.3 EXECUTION
8.3.1 Before any painting is done all surfaces to be painted shall be clean, smooth
and free from dust, dirt, grease, mortar, rust and other foreign substances. No
coat of paint shall be applied on wet or damp surface and in no case until
preceding coat is dry and hard.
8.3.2 Treat all new masonry with Masonry neutralizer – Boysen Masonry
Neutralizer #44 or approved equal. Leave overnight before rinsing with water
and allow to dry. Refer to manufacturer’s instructions.
8.3.3 Follow strictly all painting schedule, application and spreading rate
instructions, and observe adequate drying time. Refer to manufacturer’s guide.
8.3.4 Cleaning – upon completion of the building, the painting contractor shall
remove all paint spots from all finished work, and leave the entire premises
free from rubbish caused by the work. The works shall be presented clean and
free from blemish. Washing and cleaning of all glazing is incorporated in this
article.
DIVISION 10
SANITARYJ AND PLUMBING WORKS
1. GENERAL
1.10 Furnish drainage, waste and ventilation system, cold water line in accordance
with the plans and specifications – complete.
1.11 Submittals – Submit samples and secure Engineer’s approval.
1.12 All plumbing works included herein shall be executed according to the provisions
of the National Plumbing Code of the Philippines and the National Building Code.
1.13 Coordinate the drawings with other related drawings and specifications.
1.14 All works shall be done under the direct supervision of a licensed plumber and in
strict accordance with these specifications and of the methods as prescribed by the
National plumbing code of the Philippines.
1.15 Any changes of the work shall be prior to the approval of the Architect and the
Engineer.
1.16 The contractor shall be responsible for all the required floor and wall openings
needed for the completion of the work.
1.17 The contractor shall conduct all test required in plumbing works, and shall furnish
all the equipment, appliance, labor, and materials including water necessary for the
satisfactory testing of plumbing works at his own expense.
1.18 The drawings shows the general arrangement of all piping, however where actual
conditions necessities a rearrangements. Because of the small scale of the drawings, it
is not possible to indicate all offsets, fittings and accessories which maybe affecting
all his work and shall arrange each works accordingly, furnishing such fittings, traps,
valves and accessories as maybe required to meet each conditions.
5. PRODUCTS
5.1 For soil, waste pipe and downspout, use Standard size PVC pipes with size as
required and indicated on the plan or as directed by the Architect or Engineer.
Use “NELTEX” PVC pipes or approved equal.
5.2 For drainage and waste pipe venting use “Studor” Air admittance valve or it’s
approved equal. See detailed sanitary plan. (Please refer to Manufacturer’s
manual for installation).
5.3 For cold water line, use POLYPROPYLENE Pipes, Polymutan PN 80 Fusion
pipes made in Germany or its approved equal.
6. EXECUTION
PLUMBING FIXTURES
1. GENERAL
Furnish all required plumbing fixtures and accessories as indicated in the
drawings – complete.
2. PRODUCT
2.2 LAVATORY
2.4 ACCESSORIES
2.5 FAUCETS
Note: The Technical Specifications stated herein is not yet final and still subject to
revisions. Structural Works and Electrical Works technical specifications are yet to be
incorporated in the overall technical specifications pending the completion of Structural
plans and the Electrical plans.