Bus-Shelter nh86 PDF
Bus-Shelter nh86 PDF
KOTA STONE
490
90 410
100
90
410
500
P.C.C
4
B
3
(TYP)
2
B 2
A
1
CHAINAGE
GENERAL SPECIFICATIONS
NOTES: 600x450x20mm THK. POLISHED KOTA STONE FLOORING PLACED
FLOORING
IN C.M. 1:4 TO GIVE AN OVERALL THICKNESS OF 50mm
PAINTING FOR STEEL WORKS 2 COATS OF SYNTHETIC ENAMEL PAINT OVER ONE COAT OF PRIMER
ROOFING & CLADDING CORRUGATED GALVALUME SHEET 0.45MM THK. , 0 sy = 550 MPa
PLINTH BRICK MASONRY IN C.M. (1:6) WITH FLUSH POINTING IN C.M. (1:3)
R.S.
GENERAL ARRANGEMENT AND NUMERATION
BALANCE WORK OF 2-LANE WITH PAVED
KCP
DETAIL DRAWING FOR PASSENGER SHELTER
GEO DESIGNS & SHOULDER OF BHOPAL-SANCHI SECTION FROM
KM 0.000 TO KM 53.775 OF NH-86 (EXTN.) ON JT
PLANNING & INFRASTRUCTURAL RESEARCH (P) LTD.
DEVELOPMENT CONSULTANTS PVT.LTD. EPC MODE UNDER NHDP PHASE-III IN THE Feedback House, 15th Floor, Tower 9B
NATIONAL HIGHWAYS BACKBONE ENTERPRISES LTD STATE OF MADHYA PRADESH DLF Cyber City Phase-III, Gurgaon 122 002 SP TTS - 956 - D - MISC - 010
IN ASSOCIATION WITH
AUTHORITY OF INDIA SEGMENTAL CONSULTING & ASHISH INFRACON PVT LTD.(JV)
INFRASTRUCTURE ADVISORY (P) LTD.
Cad File No: \\Ganro-projects\projects\Detailed Design\03_Bhopal-Sanchi\01_CAD\Structures\Drawings\Misc\PASSENGER SHELTER\ TTS-710-D-MISC-010_R0_Passenger Shelter.dwg Plot Date: 10 January, 2018 - 10:09 AM
30 25 25 30
50 45 45 50
CL
50
45 30
100
BOLT HOLE
25 25
B
200
16 THK. PLATE
350
STIFFENER 10 THK. 1000
45
(TYP)
50 NB PIPE (M)
30
A C
200
400
700
CL
5700
200 2850 2850
CL OF COLUMN
CL OF COLUMN
CL OF COLUMN
45 30
400
350
25 25
BOLT
200
80 150
700
4
100
45
A A
(TYP)
400
400
30
CL OF BUS SHELTER
50
RCC PEDESTAL
850
30 25 25 30 3 2500
50 45 45 50 (TYP)
500
300
(SCALE 1:10)
800
2735
FINISHED FLOOR
LEVEL
D
FLOORING (TYP) CL OF FOOTING
FINISHED
FLOOR LEVEL
1885
50NB PIPE (M) C LOF FOOTING
TOP OF PEDESTAL 50 FGL 5
5
/ PLINTH LEVEL 250 (TYP)
1 1
a
10 THK. STIFFENER
1035
150
PCC M15
ANCHOR BOLT 5
150 80 80
115
1150 (MIN)
1
COMPACTED EARTH
115
C C
CONTROL LINE
D
FRL
6 PLINTH FILL - WELL COMPACTED EARTH
4 CHAINAGE
RCC PEDESTAL
3
FOUNDATION LAYOUT
350
3 3 (SCALE 1:25)
FOUNDING LEVEL 1 5 5 1 C 50NB PIPE (M)
L OF 50 NB PIPE
PCC -M15 16 THK BASE PLATE
LEVELLING COURSE 200X200
100 350 300 350 100 50 100 50 STIFFENER 10 THK.
1
2
1000 (SCALE 1:25) CL OF 32 NB PIPE NUT & WASHER (TYP)
FILLET WELD
COMPACTED SECTION B-B ALL AROUND
SECTION A-A EARTH (SCALE 1:25) X 32 NB PIPE (M)(HAND RAIL)
50
PCC FILLING
(TYP)
(SCALE 1:25) TRAFFIC DIRECTION
TRAFFIC DIRECTION
FRL AT BUS LANE OUTER EDGE 250
16
PLINTH LEVEL
1000 CL OF FOOTING/NB PIPE
100 350 300 350 100 10 @ 200 3 1 10 @ 150
200 200 WEARING COAT COMPACTED ANCHOR BOLT 16mm Dia
100 (TYP) EARTH LENGTH - 400mm
NUMERATION DETAILS OF FOOTING REINFORCEMENT DETAILS OF FOOTING HOLD FAST * INCLINED 50 NB TUBE. PL - PLINTH LEVEL
(SCALE 1:25) (SCALE 1:25) (SCALE 1:5) FL - FOUNDING LEVEL
R.S.
FOUNDATION DETAILS OF MIDDLE FRAME
BALANCE WORK OF 2-LANE WITH PAVED
KCP
DRAWING FOR PASSENGER SHELTER
GEO DESIGNS & SHOULDER OF BHOPAL-SANCHI SECTION FROM
KM 0.000 TO KM 53.775 OF NH-86 (EXTN.) ON JT
PLANNING & INFRASTRUCTURAL RESEARCH (P) LTD.
DEVELOPMENT CONSULTANTS PVT.LTD. EPC MODE UNDER NHDP PHASE-III IN THE Feedback House, 15th Floor, Tower 9B
NATIONAL HIGHWAYS BACKBONE ENTERPRISES LTD STATE OF MADHYA PRADESH DLF Cyber City Phase-III, Gurgaon 122 002 SP TTS - 956 - D - MISC - 011
IN ASSOCIATION WITH
AUTHORITY OF INDIA SEGMENTAL CONSULTING & ASHISH INFRACON PVT LTD.(JV)
INFRASTRUCTURE ADVISORY (P) LTD.
Cad File No: \\Ganro-projects\projects\Detailed Design\03_Bhopal-Sanchi\01_CAD\Structures\Drawings\Misc\PASSENGER SHELTER\ TTS-710-D-MISC-011_R0_Passenger Shelter.dwg Plot Date: 10 January, 2018 - 10:10 AM
STIFFENER 10 THK.
16 THK. PLATE
BOLT HOLE CL B
200 200
50
50
1000
50 NB PIPE (M) (TYP)
30
30
A C
45
45
2525
2525
200
200
300
CL
45
45
5700
30
30
2850 2850
50
50
900
CL OF COLUMN
CL OF COLUMN
CL OF COLUMN
BOLT
30 25 25 30 25 25
45 45 30 45 45 30
80 150
50 100 100 50 RCC 4
PEDESTAL
A A
300
(TYP)
450 450
400
400
CL OF BUS SHELTER
900
850
3 2500
300 300
(TYP)
VIEW 1-1
500
SECTIONAL VIEW
DETAILS OF PEDESTAL & BASE PLATE (SCALE 1:10)
2
(SCALE 1:10)
D D
800
2735
FINISHED FLOOR
FLOORING (TYP) CL OF FOOTING LEVEL
FINISHED
FLOOR LEVEL
50NB PIPE (M) CLOF FOOTING
TOP OF PEDESTAL 50 FGL 5
1885
5
/ PLINTH LEVEL 250 (TYP)
1 1
10 THK. STIFFENER CL OF PEDESTAL
a
PCC M15
1035
ANCHOR BOLT 5 5 5 150
6 8 @ 200
1150 (MIN)
150 80 80
5 5
115
COMPACTED EARTH 1
5 4NOS - 12
C C 100
115
CONTROL LINE
6 150 PLINTH FILL - WELL COMPACTED EARTH
FRL
RCC PEDESTAL
4 SECTION C-C
3 (SCALE 1:25) CHAINAGE
350
FOUNDING LEVEL
3
1 5 5 1
3 FOUNDATION LAYOUT
(SCALE 1:25)
PCC -M15
LEVELLING COURSE 50NB PIPE (M)
C
L OF 50 NB PIPE
100 350 300 350 100
1 FLOORING (TYP) CL OF FOOTING
2 FINISHED 16 THK BASE PLATE
1000 FLOOR LEVEL 200X200
COMPACTED SECTION B-B TOP OF PEDESTAL 50
50NB PIPE (M)
FGL
50 100 50 STIFFENER 10 THK.
SECTION A-A EARTH (SCALE 1:25) / PLINTH LEVEL 250 (TYP) FILLET WELD
NUT & WASHER (TYP)
(SCALE 1:25) TRAFFIC DIRECTION
10 THK. STIFFENER ALL AROUND
TRAFFIC DIRECTION PCC FILLING
CL OF FOOTING/NB PIPE PCC M15 (TYP)
1000
ANCHOR BOLT
100 350 300 350 100 10 @ 200 3 1 10 @ 150
16
200
1150 (MIN)
200
100 C C
ANCHOR BOLT 16mm Dia
COMPACTED EARTH LENGTH - 400mm
RC FOOTING
800
RCC PEDESTAL
300
BASE PLATE (TYP)
350
300 FOUNDING LEVEL
2 10 @ 150
200 PCC -M15
LEVELLING COURSE 100
B B 100 350 300 350 100
A A
2500 900
1000
COMPACTED
10 @ 200
SECTION D-D EARTH
4
200 (SCALE 1:25) DETAILS OF ANCHOR BOLT
NOTES: (SCALE 1:5)
50 NB PIPE (M) (TYP) 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METERS.
4NOS - HOLES FOR UNLESS OTHERWISE MENTIONED.
16mm Dia BOLT 9. REINFORCEMENT AT TOP FACE
800 2. DO NOT SCALE THE DRAWING. FOLLOW FIGURED DIMENSIONS ONLY. REINFORCEMENT AT BOTTOM FACE
3. GRADE OF CONCRETE SHALL BE M20 AND STEEL SHALL BE Fe415. 10. FOR ALL OTHER DETAILS REFER GENERAL ARRANGEMENT DRAWING.
4. MINIMUM CLEAR COVER TO ANY REINFORCEMENT SHALL BE 50mm 11. LOCATION OF THE PASSENGER SHELTER SHALL BE CROSS VERIFIED
AGAINST THE LATEST HIGHWAY DRAWING.
5. DEVELOPMENT LENGTH SHALL BE 35 TIMES THE DIA OF BAR.
100 6. ANCHORAGE BOLT AND THE INSERT PLATE WITH HOLD FAST LEGEND:
SHALL BE PLACED KEPT IN PLACE BEFORE CONCRETING. FGL - FINISHED GROUND LEVEL
PLAN FOR END FRAME PLAN FOR END FRAME 7. STIFFENER DIMENSIONS SHALL BE SUITABLY ADJUSTED FOR THE FFL - FINISHED FLOOR LEVEL
NUMERATION DETAILS OF FOOTING REINFORCEMENT DETAILS OF FOOTING * INCLINED 50 NB TUBE. PL - PLINTH LEVEL
(SCALE 1:25) (SCALE 1:25) FL - FOUNDING LEVEL
R.S.
FOUNDATION DETAILS OF END FRAME
BALANCE WORK OF 2-LANE WITH PAVED
KCP
DRAWING FOR PASSENGER SHELTER
GEO DESIGNS & SHOULDER OF BHOPAL-SANCHI SECTION FROM
KM 0.000 TO KM 53.775 OF NH-86 (EXTN.) ON JT
PLANNING & INFRASTRUCTURAL RESEARCH (P) LTD.
DEVELOPMENT CONSULTANTS PVT.LTD. EPC MODE UNDER NHDP PHASE-III IN THE Feedback House, 15th Floor, Tower 9B
NATIONAL HIGHWAYS BACKBONE ENTERPRISES LTD STATE OF MADHYA PRADESH DLF Cyber City Phase-III, Gurgaon 122 002 SP TTS - 956 - D - MISC - 011
IN ASSOCIATION WITH
AUTHORITY OF INDIA SEGMENTAL CONSULTING & ASHISH INFRACON PVT LTD.(JV)
INFRASTRUCTURE ADVISORY (P) LTD.
Cad File No: \\Ganro-projects\projects\Detailed Design\03_Bhopal-Sanchi\01_CAD\Structures\Drawings\Misc\PASSENGER SHELTER\ TTS-710-D-MISC-011_R0_Passenger Shelter.dwg Plot Date: 10 January, 2018 - 10:10 AM
C
L OF S
PLIC
6MM FILLET WELD E 6MM FILLET WELD
ALAROUND ALAROUND
DETAIL - D5
(TYPICAL FOR ALL
OTHER SIMILAR JOINTS)
68
8
31
R
252
38
5
DETAIL - D2 Z
95
5
11
6THK. M.S.PLATE
6MM FILLET WELD
ALAROUND
350
350
M.S.PLATE
NAME BOARD
CL OF SPLICE
6THK. M.S.PLATE
DETAIL - D3 STIFFENER 200
200
Y Y PURLIN
32 NB PIPE (M)
@ 500 C/C M.S. PLATE Z
8MM DIA 621 NAME BOARD
G.I. 'U' BOLT
583
DETAIL - D1
50 122 VIEW Z-Z
37
199
350
115
37
148
53
GALVALUME SHEET
9
MEMBER SECTION LENGTH *
38
AS PER SPECIFICATIONS
9
NO. mm
181
308
50NB PIPE (M) 583
DETAIL - D4 14
75 308
50NB PIPE (M) 1000
PURLIN
377 192 50NB PIPE (M)
70
658
169
ISA 50X50X6
SELF DRILLING 50NB PIPE (M) 2226
8MM DIA
FASTNER
G.I. 'U' BOLT 208 50NB PIPE (M) 1475
450
50NB PIPE (M) 2583
450
GALVALUME SHEET 32NB PIPE (M) 192
AS PER SPECIFICATIONS
1875
6MM FILLET WELD 208
2561
32NB PIPE (M)
2204
245
VIEW Y-Y 283
32NB PIPE (M) 283
450
32NB PIPE (M) 320
NOTES
357
399
343
TOP OF
BASE PLATE
MIDDLE FRAME
R.S.
FABRICATION DETAILS OF MIDDLE FRAME
BALANCE WORK OF 2-LANE WITH PAVED
KCP
DRAWING FOR PASSENGER SHELTER
GEO DESIGNS & SHOULDER OF BHOPAL-SANCHI SECTION FROM
KM 0.000 TO KM 53.775 OF NH-86 (EXTN.) ON JT
PLANNING & INFRASTRUCTURAL RESEARCH (P) LTD.
DEVELOPMENT CONSULTANTS PVT.LTD. EPC MODE UNDER NHDP PHASE-III IN THE Feedback House, 15th Floor, Tower 9B
NATIONAL HIGHWAYS BACKBONE ENTERPRISES LTD STATE OF MADHYA PRADESH DLF Cyber City Phase-III, Gurgaon 122 002 SP TTS - 956 - D - MISC - 012
IN ASSOCIATION WITH
AUTHORITY OF INDIA SEGMENTAL CONSULTING & ASHISH INFRACON PVT LTD.(JV)
INFRASTRUCTURE ADVISORY (P) LTD.
Cad File No: \\Ganro-projects\projects\Detailed Design\03_Bhopal-Sanchi\01_CAD\Structures\Drawings\Misc\PASSENGER SHELTER\ TTS-710-D-MISC-012_R0_Passenger Shelter.dwg Plot Date: 10 January, 2018 - 10:10 AM
6MM FILLET WELD
ALAROUND
C
L OF S
PLIC
E 6MM FILLET WELD
CORUGATTED ALAROUND 6MM FILLET WELD
GALVALUME SHEET ALAROUND
AS PER
SPECIFICATIONS
GALVALUME SHEET
AS PER
SPECIFICATIONS
DETAIL - D5
(TYPICAL FOR ALL
OTHER SIMILAR JOINTS)
68
252
385
8
31
R
Z
95
115
6THK. M.S.PLATE
6MM FILLET WELD
ALAROUND
350
350
M.S.PLATE
NAME BOARD
200
M.S. PLATE Z
NAME BOARD
PURLIN DETAIL - D1
32 NB PIPE (M) DETAIL - D3 VIEW Z-Z
@ 500 C/C
621
583
122
100 1
0
TUBE SECTION DETAILS
200
5
482
11
NO. mm
8MM DIA 732
53
G.I. 'U' BOLT 50NB PIPE (M) 583
9
25
38
0
9
50NB PIPE (M) 1000
50
37
213
70
169
50NB PIPE (M) 732
37
450
50NB PIPE (M) 401
DETAIL - D4 32NB PIPE (M) 213
PURLIN
50NB PIPE (M) 858
858
ISA 50X50X6 32NB PIPE (M) 858
450
SELF DRILLING
2809
8MM DIA
FASTNER
1875
G.I. 'U' BOLT
2204
858
25 25
450
CORUGATED
GALVALUME SHEET
AS PER SPECIFICATIONS
6MM FILLET WELD 858 * MEASURED ALONG CENTRE LINE
** CUT LENGTH SHALL BE NOTES
450
858
399
343
END FRAME
R.S.
FABRICATION DETAILS OF END FRAME
BALANCE WORK OF 2-LANE WITH PAVED
KCP
DRAWING FOR PASSENGER SHELTER
GEO DESIGNS & SHOULDER OF BHOPAL-SANCHI SECTION FROM
KM 0.000 TO KM 53.775 OF NH-86 (EXTN.) ON JT
PLANNING & INFRASTRUCTURAL RESEARCH (P) LTD.
DEVELOPMENT CONSULTANTS PVT.LTD. EPC MODE UNDER NHDP PHASE-III IN THE Feedback House, 15th Floor, Tower 9B
NATIONAL HIGHWAYS BACKBONE ENTERPRISES LTD STATE OF MADHYA PRADESH DLF Cyber City Phase-III, Gurgaon 122 002 SP TTS - 956 - D - MISC - 012
IN ASSOCIATION WITH
AUTHORITY OF INDIA SEGMENTAL CONSULTING & ASHISH INFRACON PVT LTD.(JV)
INFRASTRUCTURE ADVISORY (P) LTD.
Cad File No: \\Ganro-projects\projects\Detailed Design\03_Bhopal-Sanchi\01_CAD\Structures\Drawings\Misc\PASSENGER SHELTER\ TTS-710-D-MISC-012_R0_Passenger Shelter.dwg Plot Date: 10 January, 2018 - 10:11 AM